Party wall guide

Party wall glossary: building owner, adjoining owner, line of junction and more

The Party Wall etc. Act 1996 uses precise terms, mostly defined in section 20. Here they are in plain English.

JG

Written by John Greenan AssocRICS, MFPWS, ACABE

AssocRICSMFPWSACABE

Party wall and residential property surveyor with 25+ years’ experience in surveying and construction. Last reviewed 27 October 2026.

Short answer: The building owner is the person doing the work; the adjoining owner owns the neighbouring property. A party wall separates buildings of different owners or stands astride the boundary; a party fence wall is a masonry garden wall astride the boundary; a party structure includes floors between flats. Disputes are settled by an Agreed Surveyor or two surveyors (with a third surveyor in reserve) in a Party Wall Award. Most terms are defined in section 20 of the Act; the full A-Z is below.

The Party Wall etc. Act 1996 uses precise terms, mostly defined in section 20. Misunderstanding them is behind many invalid notices and unnecessary disputes. This A-Z covers the statutory definitions and the practical terms surveyors use, with links to the relevant sections on legislation.gov.uk and to our detailed guides.

A · B · C · D · E · F · J · L · M · N · O · P · R · S · T · U

A

Access (right of entry)
The right of a building owner and their workmen to enter adjoining land during usual working hours to carry out work under the Act, on 14 days’ notice to owner and occupier except in emergency (s.8(1)-(4)). See access under section 8.
Account for work
A written account the building owner must serve within two months of completing work whose cost the adjoining owner shares, showing the work, the expenses and any deductions (s.13(1)). The adjoining owner has one month to object, otherwise they are deemed to accept it (s.13(2)-(3)).
Addendum Award
A further Award made after the main Award, typically to deal with changes to the works or with damage. Made under the same powers in section 10.
Adjoining occupier
Anyone occupying adjoining land, buildings, storeys or rooms, including tenants on short lets (s.20). Entitled to compensation and notice of entry, but cannot consent or dissent unless also an owner.
Adjoining owner
Any owner of land, buildings, storeys or rooms adjoining the building owner’s, and for section 6 any owner within the 3 m or 6 m distances (s.20, s.6(4)). The neighbour who receives notice.
Agreed Surveyor
A single surveyor appointed jointly by both owners to settle a dispute (s.10(1)(a)). Must act impartially. See Agreed Surveyor vs two surveyors.
Appeal
Either owner may appeal an Award to the county court within 14 days of service (s.10(17)). The court may rescind or modify the Award.
Appointing officer
A person appointed by the local authority who can select a third surveyor if the two appointed surveyors fail to do so (s.10(8), s.20).
Award (Party Wall Award)
The binding document made by the surveyor(s) settling matters in dispute: the right to do the work, the time and manner of doing it, and other matters including costs (s.10(10), (12)). Conclusive unless appealed (s.10(16)). See the Party Wall Award.

B

Boundary wall
A wall on one owner’s land at the boundary, which is not a party fence wall. Relevant to section 1 and section 2(2)(g).
Building owner
An owner of land who wishes to exercise rights under the Act: the person doing the work (s.20).

C

Chimney breast
A projection of a party wall containing flues. Cutting it away is a right under section 2(2)(g). See chimney breast removal.
Compensation
The building owner’s duty to compensate adjoining owners and occupiers for any loss or damage resulting from work under the Act (s.7(2)).
Consent
Written agreement by an adjoining owner to a notice. Avoids a dispute. Consent within 14 days is needed to avoid a deemed dispute (s.5, s.6(7)).
Consent with Schedule of Condition
Consenting to the notice on condition that a Schedule of Condition of the adjoining property is prepared first. Recommended by FPWS guidance for straightforward works; keeps the neighbour’s full protection under the Act. See consent, schedule or dissent.
Counter notice
A notice from the adjoining owner, within one month of a party structure notice, requiring extra works for their benefit, such as chimney breasts, piers or deeper special foundations (s.4). See counter notices.

D

Deemed dispute (deemed dissent)
If an adjoining owner does not consent in writing within 14 days of a section 3 or section 6 notice, they are deemed to have dissented and a dispute has arisen (s.5, s.6(7)). See the 14-day rule.
Defect or want of repair
Where work to a party structure is needed because of a defect, costs may be shared according to use and responsibility (s.11(4)-(5)).
Dissent
An adjoining owner’s refusal to consent, leading to the appointment of surveyors.
Due diligence
Notices lapse if work has not begun within twelve months and is not prosecuted with due diligence (s.3(2)(b), s.6(8)).

E

Easement
A right over another’s land, such as a right of light. The Act does not authorise interference with easements in or relating to a party wall (s.9).
Electronic service
Notices may be served by email only where the recipient has stated willingness to receive them that way and given an address (s.15(1A)).
Ex parte
Where a party’s surveyor refuses or neglects to act effectively, the other surveyor may proceed alone, and their decisions are as effectual as an Agreed Surveyor’s (s.10(6)-(7)).
Excavation notice
See Section 6 notice.
Expenses
The cost of work under the Act. Generally paid by the building owner (s.11(1)), with exceptions for shared or requested work.

F

Flashing
Weatherproofing at the junction of two walls or a wall and roof. Cutting into a neighbour’s wall to insert one is a right under s.2(2)(j).
Foundation
The solid ground, or artificially formed support resting on solid ground, on which a wall rests (s.20).
FPWS
Faculty of Party Wall Surveyors, a professional body for party wall surveyors.

J

Joint owners
Where a property has more than one owner, all should be named in and served with notices.

L

Line of junction
The boundary between two owners’ land. Building on it is governed by section 1.
Line of junction notice
A section 1 notice to build a new wall on or up to the boundary, at least one month ahead (s.1(2), (5)).

M

Making good
Repairing damage caused by the work. Required for most section 2 works (s.2(3)-(6)). The adjoining owner can ask for payment instead (s.11(8)).

N

Notice of entry
Notice, normally at least 14 days, given before entering adjoining land (s.8(3)-(4)).

O

Owner
Includes a person receiving rents or profits; a person in possession other than as mortgagee or short tenant; and a buyer under contract (s.20).

P

Party fence wall
A wall, not part of a building, standing on the land of different owners and separating their land, such as a masonry garden wall. Not a timber fence (s.20).
Party structure
A party wall, and also a floor, partition or other structure separating buildings or parts of buildings approached by separate staircases or entrances, such as flats (s.20).
Party structure notice
The notice required before exercising a section 2 right, served at least two months ahead (s.3). See section 3 notices.
Party wall
A wall forming part of a building that stands on the lands of different owners (beyond just projecting footings), and so much of a wall on one owner’s land as separates buildings of different owners (s.20).
Party Wall etc. Act 1996
The Act governing party walls, boundary walls and adjacent excavation in England and Wales (s.22(4)). In force from 1 July 1997.
Plans and sections
Drawings required with a section 6 notice showing the site and depth of excavation (s.6(6)), and with a section 3 notice for special foundations (s.3(1)(b)).
Projecting footings
Footings of a wall built on the building owner’s land that extend under the neighbour’s land, permitted where necessary under s.1(6).

R

Raising
Building a party wall or party fence wall higher, a right under s.2(2)(a) and (l).
Recovery of sums
Sums payable under the Act, other than fines, are recoverable summarily as a civil debt (s.17).
RICS
Royal Institution of Chartered Surveyors. Publishes professional guidance on party wall matters.

S

Schedule of Condition
A written and photographic record of the adjoining property before work starts, used to assess any later damage. See Schedules of Condition.
Section 1 notice
See Line of junction notice.
Section 2 rights
The list of works a building owner may carry out to party structures and party fence walls, such as underpinning, raising, cutting in and cutting away projections (s.2(2)). See section 2 rights.
Section 6 notice
A notice of adjacent excavation within 3 m or 6 m of a neighbour’s building or structure, at least one month ahead, with plans and sections (s.6). See section 6 explained.
Section 10(4) notice
A ten-day request to a neighbour to appoint a surveyor; if they fail, the building owner may appoint on their behalf (s.10(4)). See the ten-day notice.
Security for expenses
Security, usually money in an escrow account, that an adjoining owner can require before work starts (s.12). See security for expenses.
Service
Delivering a notice in a way the Act recognises: in person, by post, to a company’s office, by agreed email, or addressed to “the owner” at the premises (s.15).
Special foundations
Foundations using an assemblage of beams or rods to distribute load, in practice reinforced concrete (s.20). Need written consent to be placed on the neighbour’s land (s.7(4)).
Surveyor
Any person, not a party to the matter, appointed or selected under section 10 to settle disputes (s.20). A building owner cannot act as their own surveyor.

T

Third surveyor
Selected by the two party-appointed surveyors at the outset, called on only if they cannot agree or a party refers a matter (s.10(1)(b), (11)).

U

Underpinning
Deepening or strengthening foundations. A right under s.2(2)(a) for a party wall; also a way of safeguarding the neighbour’s foundations under s.6(3).
Unnecessary inconvenience
The building owner must not exercise rights in such a manner or at such time as to cause unnecessary inconvenience (s.7(1)).
Usual working hours
The hours during which entry under section 8 is permitted; often specified in the Award.

Notice periods at a glance

NoticeSectionMinimum period
Line of junction (new wall)s.1One month
Party structure notices.3Two months
Counter notices.4Within one month of the s.3 notice
Adjacent excavations.6One month
Response to s.3 or s.6 notices.5, s.6(7)14 days, then deemed dispute
Request to appoint surveyors.10(4)10 days
Appeal against Awards.10(17)14 days
Notice of entrys.8(4)14 days

Using this glossary

Definitions here are plain-English summaries. Where the exact wording matters, for example in deciding whether a wall is a party wall or a party fence wall, read the statutory text on legislation.gov.uk and take advice. For the overall picture, see the Party Wall Act explained.

Sources and further reading

This guide is general information on the law in England and Wales, written from our surveyors’ practical experience. It is not legal advice; for a specific dispute, take advice on your own facts.

Planning work? Take the 1-minute check, see our fixed fees or call free on 08000 487897. We have helped on 750+ projects.

Sources: Party Wall etc. Act 1996 (legislation.gov.uk) · The Party Wall etc. Act 1996: explanatory booklet (GOV.UK). Last reviewed 27 October 2026. General guidance on the law in England and Wales, not legal advice.

Frequently asked questions

Is a garden fence a party fence wall?

No. A timber fence is not a wall, so it is not a party fence wall under the Act.

What is the difference between a party wall and a party structure?

Party structure is wider: it includes party walls and also floors or partitions separating parts of buildings with separate entrances, such as flats.

Who is the building owner?

The owner who wants to carry out the work. It does not mean the builder.

Is a tenant an adjoining owner?

Not usually. A tenant on a lease of a year or less is an occupier. Leaseholders on longer leases can be owners.

What are special foundations?

Foundations using an assemblage of beams or rods to distribute load, which in practice means reinforced concrete. They cannot be placed on a neighbour’s land without written consent.

What is a deemed dispute?

If the neighbour does not consent in writing within 14 days of a section 3 or section 6 notice, the Act treats them as having dissented.

Where are the definitions in the Act?

Mainly in section 20, the interpretation section.