Side by side
| Agreed Surveyor | Two surveyors | |
|---|---|---|
| Legal basis | s.10(1)(a) | s.10(1)(b) |
| Who appoints | Both owners jointly, in writing | Each owner appoints one, in writing |
| Third surveyor | None | Selected by the two surveyors at the outset |
| Who makes the Award | The Agreed Surveyor | The two surveyors (or any two of the three) |
| Typical use | Cooperative neighbours wanting formal terms; most domestic work | Complex or contentious works; strained relations |
| Speed | Usually faster: one inspection, no negotiation between surveyors | Slower: two diaries, correspondence between surveyors |
| Cost to building owner | One surveyor’s fees (our full package £899 + VAT, London £999; Agreed Surveyor supplement currently waived) | Own surveyor plus the neighbour’s surveyor’s reasonable fees |
| If the surveyor cannot continue | Proceedings begin again (s.10(3)) | The appointing party appoints a replacement (s.10(5)) |
How the Agreed Surveyor route works
Both owners agree in writing to appoint one surveyor. Usually the building owner proposes a surveyor and the neighbour accepts. The Agreed Surveyor inspects the neighbour’s property, prepares the Schedule of Condition, reviews the drawings and method statements, and makes the Award. They are not the building owner’s agent; their statutory role is to settle the dispute fairly between both owners. If the Agreed Surveyor refuses to act, neglects to act for 10 days after a request, dies or becomes incapable, the process begins again from scratch (s.10(3)).
How the two-surveyor route works
Each owner appoints a surveyor in writing, and the two “forthwith” select a third surveyor (s.10(1)(b)). The two party-appointed surveyors then work together on the Schedule and the Award. Any two of the three can make the Award (s.10(10)), and in practice the two party-appointed surveyors agree it between them. If they cannot agree a point, either owner or either surveyor can call on the third surveyor to determine it (s.10(11)). If one surveyor refuses or neglects to act, the other can proceed alone after a 10-day request (s.10(6)–(7)).
What the third surveyor does
The third surveyor is a reserve, not a routine participant. They are named early so that a referee is ready if needed, and most domestic Awards are agreed without them. If the two surveyors fail to select a third within 10 days of a request, the local authority’s appointing officer can select one (s.10(8)).
Impartiality: the point people misunderstand
Whichever route is used, the surveyors are not advocates. Even a surveyor appointed by one owner has a statutory duty to settle the dispute fairly between both. An Agreed Surveyor is therefore not “the building owner’s surveyor in disguise”, and the neighbour’s own surveyor does not give them “more protection” in law. The two-surveyor route gives the neighbour a professional of their own choosing to explain the process to them, which matters to some people, at extra cost to the building owner.
Which to choose
- Choose an Agreed Surveyor for straightforward domestic works such as lofts, beams, chimney breasts and single-storey extensions, where the neighbour wants formal terms but there is no fundamental disagreement.
- Two surveyors make more sense for basements and underpinning, fragile or unusual structures, high-value interiors, large developments, or where relations have broken down and the neighbour would not trust a surveyor proposed by the building owner.
- If the works are simple and the neighbour is relaxed, consider consent with a Schedule of Condition instead.
Worked example
Illustrative only. Olivia’s neighbour dissents from her loft notice and asks who will look after her interests. We explain that we can act as Agreed Surveyor, impartially for both, and that she is equally entitled to appoint her own surveyor at Olivia’s cost. She chooses the Agreed Surveyor, the Award is served within a couple of weeks, and Olivia avoids a second set of fees. A year later the same neighbour’s other neighbour plans a basement; there, two surveyors are appointed, and a structural engineer’s input is sought before the Award is agreed.
Can you appoint us?
Yes. We can act as the Agreed Surveyor for both owners, as the building owner’s surveyor, or as the adjoining owner’s surveyor. Whoever we act for, our statutory duty is to be impartial.
How the costs compare in practice
With an Agreed Surveyor, the building owner pays one surveyor’s fee. With our full package that is £899 + VAT (£999 in London), with the Agreed Surveyor supplement currently waived. With two surveyors, the building owner pays their own surveyor plus the neighbour’s surveyor’s reasonable fees, which are set by that surveyor and determined in the Award (s.10(13)). Two surveyors also usually means more correspondence, and the overall timetable tends to be longer.
What to ask before agreeing to a surveyor
- Are they a member of a party wall professional body? All four of our surveyors are members of the Faculty of Party Wall Surveyors (MFPWS).
- Have they handled this type of work before, such as lofts, extensions or basements?
- Are they involved in the project in another capacity (designer, contractor)? The booklet favours an Agreed Surveyor who is not.
- Who will inspect, and when?
- Are their fees fixed or hourly?
A typical timeline under each route
Agreed Surveyor: the neighbour signs the appointment; the surveyor arranges one visit to take the Schedule and look at the party wall; drawings are reviewed; a draft Award is prepared and served on both owners. Two surveyors: each owner appoints in writing; the surveyors exchange appointment letters and select the third surveyor; they arrange a joint or separate inspection; one drafts the Award and the other comments, sometimes over several rounds; the agreed Award is signed and served by both. Neither route lets work start before the notice period has expired, unless the owners agree otherwise (s.10(12)).
Changing routes
An Agreed Surveyor appointment, like any appointment under section 10, cannot be rescinded by either party (s.10(2)). So a neighbour who agrees to an Agreed Surveyor cannot later switch to their own surveyor simply because they would prefer one. If the Agreed Surveyor refuses or neglects to act, dies or becomes incapable, the process begins again (s.10(3)), and the owners can then choose either route.
For neighbours deciding now
If you have received a notice and are unsure, ask the building owner’s surveyor to explain the work and what an Agreed Surveyor would do. You lose nothing by asking questions first, and you can still appoint your own surveyor if you are not satisfied with the answers. If the works are straightforward and you simply want a record of your property, consent with a Schedule of Condition may be all you need.
Sources and further reading
- Party Wall etc. Act 1996, section 10: Resolution of disputes (legislation.gov.uk)
- Party Wall etc. Act 1996, section 20: Interpretation (legislation.gov.uk)
- GOV.UK: The Party Wall etc. Act 1996 explanatory booklet
- GOV.UK: Party walls and building work
- Faculty of Party Wall Surveyors (FPWS)
Section references are to the Party Wall etc. Act 1996 as it applies in England and Wales, checked against legislation.gov.uk. This guide is general professional guidance, not legal advice; every project should be assessed on its own drawings.
- Party wall notices for building owners
- Fixed fees: party wall agreement cost
- Do I need a party wall agreement? (1-minute check)
Areas we cover include Party Wall Agreement Hertfordshire · Party Wall Agreement Surrey · Party Wall Agreement Sussex and more.
Sources: Party Wall etc. Act 1996 (legislation.gov.uk) · The Party Wall etc. Act 1996: explanatory booklet (GOV.UK) · Faculty of Party Wall Surveyors (FPWS). Last reviewed 27 October 2026. General guidance on the law in England and Wales, not legal advice.