Party Wall Agreement Brent
Brent has an inner-city east and a suburban west. Around Queen’s Park the streets are largely original two- and three-storey Victorian buildings. To the west, the Metropolitan Railway bought land beside its line and built housing on it, and Wembley Park became a key part of the Metro-land suburbs in the 1920s, the decade of the British Empire Exhibition. Brent Council describes buildings in the borough ranging from Victorian Italianate and suburban Arts and Crafts to ‘Tudorbethan’ and Modern, as well as planned garden village estates.
Semis and terraces like these share walls, which is why lofts and extensions here so often need notice under the Party Wall etc. Act 1996. We prepare and serve notices on each adjoining owner, and if a neighbour dissents we agree the Schedule of Condition and Party Wall Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Brent?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Brent's conservation areas and party wall notices
Brent Council has 22 conservation areas. On 28 May 2024 it designated Kensal Rise as a new one, and Article 4 directions apply in several areas, including Barn Hill, Brondesbury and Buck Lane, removing some permitted development rights. Inside these areas you may need planning permission for alterations that are usually allowed, but the Act’s notices and timescales are unchanged.
Victorian terraces around Queen’s Park: rear extensions, side-return infills and lofts. Expect Section 6 for the foundations and Section 3 for work to the party walls.
Metro-land semis around Wembley Park: lofts and side extensions, where new foundations close to the neighbouring house are common.
Purpose-built flats and converted houses: work to party floors affects other flat owners.
Garden walls. Where a garden wall stands astride the boundary, rebuilding or raising it usually needs a notice.
Flat owners in converted houses are often surprised to receive a notice. If you hold a lease with more than a year left, you count as an owner under the Act, and you can appoint your own surveyor or agree to the one already acting for your neighbour.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Brent
Fixed fees, with the same prices across London.
Brent borders Barnet, Camden, Westminster, Kensington and Chelsea, Hammersmith and Fulham, Ealing and Harrow. We also cover:
Party Wall Agreement London · Party Wall Agreement Barnet · Party Wall Agreement Camden · Party Wall Agreement Westminster · Party Wall Agreement Kensington and Chelsea · Party Wall Agreement Hammersmith and Fulham · Party Wall Agreement Ealing · Party Wall Agreement Harrow · Party wall agreement surveyor
Local party wall surveyors in Brent
Your enquiry is handled by a local qualified surveyor from our team. In Brent that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Brent homeowners
How do I get a party wall agreement in Brent?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Brent?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Brent?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
Kensal Rise became a conservation area in 2024. Does that change my party wall position?
No. The designation affects which works need planning permission from Brent Council. The Party Wall etc. Act 1996 applies just as before, so the notices and notice periods are unchanged.
My Barn Hill house has an Article 4 direction. Can I still extend?
Possibly, but some work that is normally permitted development will need planning permission first. Once you have the go-ahead, notices go to your neighbours as usual: Section 3 for work to a shared wall, Section 6 for nearby foundations and Section 1 for a new boundary wall.
Our Queen's Park terrace needs a side-return extension. How long before we can start?
Section 6 and Section 1 notices need at least one month, and any Section 3 notice for work to the party wall needs two. Work can start once the periods have run and your neighbours have consented or an Award has been made, unless they agree in writing to an earlier start.
My upstairs neighbour in a converted house wants to replace their floor joists. Is that party wall work?
Usually. A floor separating two flats with their own entrances is a party structure, so replacing joists is work the Act covers. It needs a Section 3 notice to you if you own the flat below or hold a lease on it of more than a year.
Do you cover Harlesden, Neasden and Kingsbury?
Yes. We cover all of Brent, from Kilburn and Harlesden to Wembley, Neasden and Kingsbury, at the same fixed London fees.
How much does a Party Wall Agreement cost in Brent?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Brent?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.