Party Wall Agreement Kensington and Chelsea
In the Royal Borough, a great deal of the housing is Victorian. Notting Hill is known for its terraces of large Victorian townhouses, many of them set around private communal gardens, and the Ladbroke Estate was laid out on the hill with an 1845 church at its summit as the centrepiece. Mews houses, mansion flats and houses divided into apartments make up much of the rest. Homes here nearly always share structure with someone else, whether that is a party wall with next door or a floor with the flat upstairs.
We prepare party wall notices for owners across Kensington, Chelsea, Notting Hill and Earl’s Court, serve them on every adjoining owner and, if a neighbour dissents, deal with the Schedule of Condition and the Party Wall Award. If a notice has landed on your doormat instead, we can explain what you are being asked to agree to.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Kensington and Chelsea?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Basements and shared structures in Kensington and Chelsea
The Royal Borough of Kensington and Chelsea adopted its Basements Supplementary Planning Document on 14 April 2016. It gives detailed guidance on Local Plan Policy CL7: Basements, which applicants have to meet when they apply for planning permission. Two separate tracks follow from that. Planning, under Policy CL7 and the SPD, is decided by the council. Notices under the Party Wall etc. Act 1996 go to the neighbours: Section 6 for excavation near their foundations and Section 3 for underpinning or other work to the party wall.
Other projects we see in the borough:
Roof terraces and extra storeys. Raising a party wall, or building on top of one, is Section 2 work that needs two months’ notice.
Mews houses. Small footprints and walls shared on several sides mean even a modest refit can involve more than one neighbour.
Flats in converted houses. Work to the joists, or anything else that affects the floor between two flats, can be party structure work.
Garden squares. Where houses back onto communal gardens, scaffolding and access for rear works may need agreeing as part of the Award.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Kensington and Chelsea
Fixed fees, with the same prices across London.
Kensington and Chelsea lies between Westminster and Hammersmith and Fulham, with Brent to the north and Wandsworth across the river. We also cover:
Party Wall Agreement London · Party Wall Agreement Westminster · Party Wall Agreement Hammersmith and Fulham · Party Wall Agreement Brent · Party Wall Agreement Wandsworth · Party wall agreement surveyor
Local party wall surveyors in Kensington and Chelsea
Your enquiry is handled by a local qualified surveyor from our team. In Kensington and Chelsea that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Kensington and Chelsea homeowners
How do I get a party wall agreement in Kensington and Chelsea?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Kensington and Chelsea?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Kensington and Chelsea?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
Does the borough's basement policy mean I don't need party wall notices?
No. Policy CL7 and the Basements SPD control whether the council grants planning permission. They do not deal with your neighbours’ rights under the Party Wall etc. Act 1996, so notices are still needed for excavation within the Act’s distances and for underpinning a shared wall.
My neighbours in Chelsea are adding a roof terrace on the party wall. What can I ask for?
If you dissent, the surveyors can set out in the Award the method of work, protection for your roof and parapets, working hours and how any damage will be made good. You can also ask for a Schedule of Condition before work begins, so that any later damage can be judged against a record.
Can my neighbour be asked for security before a basement is dug next door?
Yes. Under Section 12 of the Act, an adjoining owner can ask the building owner to provide security for expenses before the work starts. If the two sides cannot agree the amount, the surveyors decide it.
I live in a mews house in Kensington. Who are my adjoining owners?
Anyone who owns a building or land next to yours that the work could affect. In a mews that can be the houses on both sides and the property behind. Where buildings are let on long leases, the leaseholders count as owners too, so a single project can mean several notices.
My planning application in Notting Hill is still being decided. When should I serve notices?
You can serve them before planning permission is granted, but Section 3 and Section 6 notices lapse if the work has not started within 12 months. On larger projects it is worth timing the notices so that they don’t run out before you can begin.
How much does a Party Wall Agreement cost in Kensington and Chelsea?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Kensington and Chelsea owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Kensington and Chelsea?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.