Fulham, Parsons Green, Brackenbury Village, Brook Green and Ravenscourt Park are made up largely of Victorian and Edwardian houses, and Brook Green’s tree-lined streets are mostly Victorian townhouses. Long runs of terraces like these mean that a loft, a rear extension or a side-return infill nearly always involves the walls shared with the houses either side, and sometimes the garden walls at the back as well.
We serve the notices the Party Wall etc. Act 1996 requires on all of those neighbours. Where an adjoining owner consents, their signed consent is the agreement and work can go ahead once the notice period has run. Where they dissent, we act as agreed surveyor or work with the surveyor they appoint to agree a Party Wall Award. We also help owners who have received a notice and want to know where they stand.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Hammersmith and Fulham?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Terraces and party walls in Hammersmith and Fulham
Hammersmith & Fulham Council is the local planning authority. Its Local Plan heritage evidence refers to the borough’s 45 designated conservation areas, many framed by consistent terraces of uniform design, together with over 500 statutory listed buildings and a local register of Buildings of Merit. These designations count in planning decisions; the party wall process is the same throughout the borough.
Typical projects and the notices they need:
Side-return and rear extensions. Building a new wall along the boundary engages Section 1, and digging foundations deeper than a neighbour’s within three metres engages Section 6. Each requires one month’s notice.
Loft conversions and mansards. Steel beams set into the party wall, raising it, or cutting away chimney breasts are Section 2 works needing a two-month Section 3 notice.
Garden walls. In terraced streets the rear garden walls are often party fence walls, so rebuilding or raising one is notifiable work.
Flat conversions. Splitting a house into flats, or combining flats back into a house, can involve party floors as well as party walls.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Hammersmith and Fulham
Fixed fees, with the same prices across London.
Hammersmith and Fulham borders Brent, Kensington and Chelsea, Wandsworth, Richmond upon Thames, Hounslow and Ealing. We also cover:
Party Wall Agreement London · Party Wall Agreement Kensington and Chelsea · Party Wall Agreement Brent · Party Wall Agreement Ealing · Party Wall Agreement Hounslow · Party Wall Agreement Richmond upon Thames · Party Wall Agreement Wandsworth · Party wall agreement surveyor
Local party wall surveyors in Hammersmith and Fulham
Your enquiry is handled by a local qualified surveyor from our team. In Hammersmith and Fulham that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Hammersmith and Fulham homeowners
How do I get a party wall agreement in Hammersmith and Fulham?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Hammersmith and Fulham?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Hammersmith and Fulham?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I'm building a side-return extension in Fulham. Which notices will I need?
Usually a Section 1 notice for the new wall on or up to the boundary, a Section 6 notice if the foundations go deeper than next door’s within three metres, and a Section 3 notice if you cut into or underpin the existing party wall. We serve them together, so each neighbour receives one clear pack.
Does a Buildings of Merit listing affect the party wall process?
No. A Building of Merit is a local heritage designation that the council takes into account in planning decisions. Party wall notices, notice periods and Awards work the same way whether or not a building is on the local register.
My neighbour in Brook Green wants to rebuild our shared garden wall. Do I have a say?
Yes. A garden wall standing astride the boundary is usually a party fence wall, so demolishing and rebuilding it is work under Section 2 of the Act. You can consent, or dissent and have the work, and how its cost is shared, settled in an Award. Where repair is needed because the wall is defective, the cost can be shared between the owners.
We're adding a mansard to a terraced house in Hammersmith. What notice period applies?
Two months for work to the party walls, such as raising them for the new roof or building steels into them. Your neighbours can agree in writing to a shorter period. Without that, you have to wait for the notice period to run and, if they dissent, for the Award to be made.
My neighbour in Parsons Green started work without serving notice. What can I do?
Ask them to stop and serve the proper notice, and take advice promptly. Where notifiable work starts without notice, an adjoining owner can apply to the court for an injunction to halt it until the Act has been followed. A free call is the easiest way to talk the options through.
How much does a Party Wall Agreement cost in Hammersmith and Fulham?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Hammersmith and Fulham owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Hammersmith and Fulham?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.