Party Wall Agreement Hounslow
Hounslow stretches from Chiswick, close to central London, to Feltham and Bedfont on the Surrey border. At the eastern end, Chiswick’s population grew almost tenfold during the 19th century, and it is a mixture of Georgian, Victorian and Edwardian housing. Suburban building began at Gunnersbury in the 1860s and at Bedford Park, the first garden suburb, in 1875. In Brentford, the Butts Estate is a Georgian square with several listed buildings, some dating back to 1680, while Isleworth was orchards and then market gardens supplying London. Further west, Hounslow itself grew rapidly in the second half of the 20th century, helped by its connection to Heathrow.
Georgian terraces, Victorian semis and post-war houses all share walls or sit close to their neighbours, so most structural projects here need notice under the Party Wall etc. Act 1996. We prepare and serve the notices, agree the Schedule of Condition and, if a neighbour dissents, take the matter through to an Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Hounslow?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Hounslow's 29 conservation areas and Article 4 directions
Hounslow Council says there are currently 29 conservation areas in the borough, and that the appraisals for all of them are being updated. Article 4 directions restricting works normally allowed under permitted development apply to unlisted buildings in two of them: Bedford Park and Gunnersbury. Separately, a borough-wide Article 4 direction covers conversions of houses to small houses in multiple occupation.
Bedford Park is shared with Ealing, so homes on the Hounslow side are covered by Hounslow’s direction and Hounslow’s planning decisions. The party wall rules are the same on both sides.
What we are usually asked to help with:
Lofts and rear extensions on Chiswick’s Victorian and Edwardian terraces, where steels in the party wall need a Section 3 notice two months ahead and new foundations usually need Section 6.
Basements and lower-ground extensions, where excavation within three or six metres of a neighbour’s foundations is Section 6 work and underpinning a shared wall is Section 3.
Work to listed Georgian houses in Brentford and Isleworth, where listed building consent sits alongside, not instead of, party wall notices.
Extensions to family houses in Hounslow, Feltham and Cranford.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Hounslow
Fixed fees, with the same prices across London.
Hounslow borders Richmond upon Thames, Hammersmith and Fulham, Ealing and Hillingdon, and the Spelthorne district of Surrey. We also cover:
Party Wall Agreement London · Party Wall Agreement Richmond upon Thames · Party Wall Agreement Hammersmith and Fulham · Party Wall Agreement Ealing · Party Wall Agreement Hillingdon · Party Wall Agreement Staines-upon-Thames · Party wall agreement surveyor
Local party wall surveyors in Hounslow
Your enquiry is handled by a local qualified surveyor from our team. In Hounslow that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Hounslow homeowners
How do I get a party wall agreement in Hounslow?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Hounslow?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Hounslow?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I live in Bedford Park on the Chiswick side. Does the Article 4 direction affect my party wall notice?
No. The direction means certain external changes to unlisted houses need Hounslow’s planning permission. Party wall notices are separate and follow the Act: Section 3 for work to the shared wall, Section 6 for nearby excavation, Section 1 for a new boundary wall.
Our listed house in Brentford shares a wall with the house next door. What do we need before repointing and strengthening it?
Listed building consent from the council for works affecting the building’s character, and a Section 3 notice to your neighbour if the work involves repairing, strengthening or underpinning the party wall. Allow two months for the notice.
A neighbour in Isleworth is building a basement. Should we get our own surveyor?
You can. You can agree to the building owner’s surveyor acting for both of you, or appoint your own. On deep excavations many adjoining owners choose their own surveyor, whose reasonable fees are normally paid by the building owner.
Can my neighbour be made to pay towards a party wall repair?
Under Section 11, where work is needed because a party wall is defective or out of repair, the cost is shared between the owners according to their use of the wall and responsibility for the defect.
What does an Award usually cover?
It describes the work, when and how it may be done, a Schedule of Condition of the adjoining property, working hours, access arrangements and who pays the surveyors’ costs. Either owner can appeal to the county court within 14 days of receiving it.
Do you cover Chiswick, Brentford, Isleworth and Feltham?
Yes. We cover the whole London Borough of Hounslow, including Chiswick, Brentford, Isleworth, Osterley, Hounslow, Cranford, Feltham and Bedfont, at our fixed London fees.
How much does a Party Wall Agreement cost in Hounslow?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Hounslow owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Hounslow?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.