Party Wall Agreement Westminster
Party wall law has deep roots here. The 1996 Act is largely a reworking of Part VI of the London Building Acts (Amendment) Act 1939, which already gave inner London a tested way of settling disputes between neighbours. Westminster’s housing still sets the pattern for that work: the white stucco terraces of Pimlico, the late Victorian and Edwardian mansion blocks of Maida Vale, and mews houses tucked behind the grander streets. With 56 conservation areas in the city, few homes are far from one.
For owners that means two parallel tracks: planning or listed building consent from Westminster City Council, and notices to the neighbours under the Party Wall etc. Act 1996. We handle the second. We identify the adjoining owners, including freeholders and long leaseholders in blocks of flats, serve the right notices and, where a neighbour dissents, take the matter through to a Party Wall Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Westminster?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
What Westminster owners should know
Westminster City Council’s own rules shape how projects here are designed and run.
Basement policy. The City Plan 2019–2040 has a dedicated basement policy (Policy 45), which covers new basements and extensions to existing ones. Under the council’s Code of Construction Practice, any new or extended basement is a Level 3 project that needs an approved Construction Management Plan. Party wall notices are still required on top of that: excavation near a neighbour’s foundations falls under Section 6, and underpinning a party wall under Sections 2 and 3.
Conservation areas and Article 4 directions. In the 56 conservation areas you need planning permission for demolition and for some alterations that would not need it elsewhere, and some areas also have Article 4 directions. None of this changes notice periods.
Mansion flats. In a mansion block, the floors and walls between flats are typically party structures. Replacing a floor, moving a structural wall or cutting a new opening can mean notices to the flats above, below and alongside.
Stucco terraces. In terraces like those in Pimlico, a roof extension or a rear addition will usually involve the walls shared on both sides.
In each case, written consent or an Award is the party wall agreement.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Westminster
Fixed fees, with the same prices across London.
Westminster borders the City of London, Camden, Brent and Kensington and Chelsea, with Lambeth and Wandsworth across the Thames. We also cover:
Party Wall Agreement London · Party Wall Agreement Camden · Party Wall Agreement Kensington and Chelsea · Party Wall Agreement Brent · Party Wall Agreement City of London · Party Wall Agreement Lambeth · Party Wall Agreement Wandsworth · Party wall agreement surveyor
Local party wall surveyors in Westminster
Your enquiry is handled by a local qualified surveyor from our team. In Westminster that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Westminster homeowners
How do I get a party wall agreement in Westminster?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Westminster?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Westminster?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
Does Westminster's Construction Management Plan cover the party wall side of my basement?
No. The Construction Management Plan required under the Code of Construction Practice deals with how the site is run: hours, deliveries, noise and dust. Party wall notices and any Award deal with your neighbours’ property rights and the protection of their buildings. A basement project normally needs both.
I want to renovate my mansion flat in Maida Vale. Is that party wall work?
It can be. Floors and walls separating flats are usually party structures, so cutting into them, replacing floor joists or forming a new opening in a structural wall can need a Section 3 notice to the owners of the flats affected, served at least two months before the work. A new kitchen or bathroom that does not touch those structures normally does not.
My house in Pimlico is listed. Do I still serve party wall notices?
Yes. Listed building consent is granted by the council and protects the building’s special interest; party wall notices protect the rights of your neighbours. Where the work is covered by the Act you need both, and neither replaces the other.
Who do I serve in a block where a company owns the freehold?
The freeholder company, plus every leaseholder whose lease has more than a year to run and whose part of the building is affected. Shorter tenancies do not make someone an owner under the Act. We take names and addresses from the Land Registry titles so that the notices are valid.
My neighbour's builders want access through my mews house. Do I have to allow it?
Section 8 of the Act gives a building owner a right of access to an adjoining property where it is needed to carry out notifiable work, but they must normally give 14 days’ notice of entry. The terms, such as protection and making good, are usually set out in the Award.
How much does a Party Wall Agreement cost in Westminster?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Westminster owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Westminster?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.