Skip to content
Party wall agreements & notices · Fixed fees, invoiced on completionFree initial advice: 08000 487897 · hello@partywall-agreement.co.uk
Want to serve party wall notices yourself? Go to partywall-notices.co.uk ↗
Home › London › City of London
City of London Party Wall Surveyors · Fixed fees · Invoiced on completion

Party Wall Agreement City of London

The City of London is mostly offices, but it has a small and closely packed residential population: 8,583 people at the 2021 census, compared with 127,869 in 1851. Many of them live on two post-war estates. The Barbican Estate, built between 1965 and 1976 on a 35-acre site, consists of four tower blocks, 14 terrace blocks, two mews and a few other buildings, and is Grade II listed as a whole. Next door, the Golden Lane Estate was built on a bomb-damaged site on the City’s northern edge, finished with Crescent House in 1962 and protected by listing since 1997.

In blocks like these, the walls and floors between flats are party structures under the Party Wall etc. Act 1996. Residents also find themselves on the receiving end of notices when a neighbouring site is redeveloped. We serve notices for owners doing work, and advise owners and leaseholders who receive them.

  • Notices for all your neighbours: £150 + VAT
  • Professionally qualified: RICS · FPWS · CABE
  • Free initial advice for building & adjoining owners

Request a fixed-fee quote

Tell us about your project in City of London. A local qualified surveyor from our team will reply, usually the same working day.

No payment online. Fixed fees, invoiced on completion.

RICSFaculty of Party Wall SurveyorsCABE
750+Projects
50,000+Photos for SOC reports
70%Projects where one surveyor acts for both
Party wall in City of London

Do I need a party wall agreement in City of London?

When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.

Typical projects that need notice include:

Rear and side-return extensionsLoft conversions with steel beams into the party wallChimney breast removalNew foundations within 3m of a neighbourGarden walls on the boundary
Planning permission isn’t the same thing. Approval from your local council (planning or building control) doesn’t replace your duties under the Party Wall Act. You still need to serve notice on your neighbours.
Illustration of a completed rear dormer loft conversion on a semi-detached house, cut away to show the finished loft room with stairs, bed and window, and the party wall shared with the neighbour
Local information

Party walls in the Square Mile

The City of London Corporation is the planning authority. It has 28 conservation areas, including Barbican and Golden Lane, and is producing a character summary and management strategy, a supplementary planning document, for each one. Listed building consent is needed for works affecting the character of a listed flat, inside as well as out.

For party wall purposes, three situations come up most often:

Work inside a flat. Removing or altering a wall that separates your flat from another, or cutting into the floor or ceiling between flats, is work to a party structure and needs a Section 3 notice two months ahead to each owner affected. Where flats are held on long leases, both the leaseholders and the freeholder can be owners entitled to notice.

Excavation next door. Large commercial schemes often dig deep basements. Under Section 6, owners within three metres, or within six metres where the excavation cuts a 45-degree line from their foundations, must be served.

Our fixed fees cover domestic work. For a commercial project we can provide a quote; for residents receiving a notice, the developer normally pays the reasonable costs of the surveyor acting for you.

How it works

From notice to agreement in four steps

The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.

Talk to your neighbour

We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.

We serve the notices

We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.

Neighbour consents, or a Schedule

If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.

Award if there’s a dispute

If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.

Which notices do common projects need?

Rear extension: typical notices
Usually s6 for foundations; s1 if built on the boundary. Illustrative, not to scale.
Loft conversion: typical notices
Usually s2 works under a s3 notice (2 months). Illustrative, not to scale.
Basement: typical notices
Usually s6 plus s2 underpinning. Illustrative, not to scale.

Typical only. The 1-minute checker or a free call will confirm what applies.

The dates that matter

The party wall timeline

Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.

Day
0
Start here

Notices served

Served on every adjoining owner, at least 1 or 2 months before work depending on the section.

14
days
Neighbour responds

Consent or dissent

Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.

+10
days
If no reply

Request to appoint

A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.

SoC
Before work

Schedule of Condition

The neighbour’s property is inspected and photographed to record its condition.

Award
If in dispute

Party Wall Award

Surveyors serve the Award. Either owner may appeal to the county court within 14 days.

Go
Notice period ends

Work starts

Once the notice period has run and consent or an Award is in place.

⏳ Section 3 & 6 notices lapse if work hasn’t started within 12 months🤝 Your neighbour can agree to an earlier start in writing

Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.

Fixed fees in City of London

Everyone starts with notices

The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.

Step 1 · every party wall agreement starts here

Party Wall Notices: £150 + VAT (£180 inc VAT)

One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.

Get my party wall notices servedFixed fee, invoiced on completion

What happens next depends on your neighbour’s response

Outcome A

Neighbour consents

£150 + VAT
£180 inc VAT · fixed fee, invoiced on completion
  • Your neighbour signs the consent form
  • The consent is your Party Wall Agreement
  • You can proceed with the works
  • We still recommend a Schedule of Condition to protect you
Find out more
Most common outcomeOutcome B

Consents, subject to a Schedule of Condition

£499 + VAT
£598.80 inc VAT · fixed fee, invoiced on completion
55% of all our projects are notices with a Schedule of Condition
Illustration of a surveyor recording an existing crack on a neighbour's internal wall with a tablet and a crack gauge for a Schedule of Condition
  • Notices for all neighbours + Land Registry checks
  • Site inspection of your neighbour’s property
  • Detailed photographic Schedule of Condition
  • Protects you against claims for damage that was already there
  • Each additional Schedule: £399 + VAT (£478.80 inc)
Request a fixed-fee quote
Outcome C

Neighbour dissents: an Award is needed

£999 + VAT
£1,198.80 inc VAT · total including notices
  • Notices for all neighbours + Land Registry checks
  • 1 Schedule of Condition
  • 1 Party Wall Award
  • Sets working hours, access & damage provisions

Agreed Surveyor — we act for both owners

£50 + VAT Currently waived

Total with Agreed Surveyor+ VATinc VAT
London£999£1,198.80

No extra cost while the waiver runs.

70% of our projects use one surveyor acting for both.

Neighbour appoints their own surveyor: our fee stays as shown. Their surveyor’s reasonable fees are normally payable by you and are charged separately.
Domestic extensions & loft conversions only. Excludes basement and commercial projects. Basement or commercial? Request a quote →
Request a fixed-fee quote
Prefer to serve your own notices?

DIY notices at partywall-notices.co.uk

Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.

Visit partywall-notices.co.uk ↗
Already served your own notices?

Schedule of Condition only: £450 + VAT (£540 inc)

We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.

Request a Schedule of Condition

Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.

Local coverage

Party wall surveyors in and around City of London

Fixed fees, with the same prices across London.

Around the Square Mile, we also cover:

Party Wall Agreement London · Party Wall Agreement Islington · Party Wall Agreement Hackney · Party Wall Agreement Tower Hamlets · Party Wall Agreement Southwark · Party Wall Agreement Westminster · Party Wall Agreement Camden · Party wall agreement surveyor

CB

Local party wall surveyors in City of London

MFPWSMPTS

Your enquiry is handled by a local qualified surveyor from our team. In City of London that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.

City of London FAQ

Party wall questions from City of London homeowners

How do I get a party wall agreement in City of London?

Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.

How long does a party wall agreement take in City of London?

Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.

Who pays for a party wall agreement in City of London?

Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.

I own a leasehold flat in the Barbican. Does a neighbour's renovation need a party wall notice to me?

If their work affects a wall or floor separating your flat from theirs, yes. You are an owner under the Act if your lease has more than a year to run, so you should be served alongside the freeholder. Listed building consent is a separate requirement for the works.

A developer next to my building has served a Section 6 notice. Who pays for my surveyor?

The building owner, here the developer, normally pays the reasonable fees of the surveyors who make the Award, including the surveyor you appoint to act for you.

Can a party wall Award control noise and working hours on a big City site?

An Award can set working hours and methods for the notifiable work itself, along with access and protection measures. General construction noise is mainly controlled by the City Corporation, so the two work alongside each other.

Our block's freeholder wants to add new floors. Is that party wall work?

Raising a party wall or building on top of one is Section 2 work, so owners of adjoining buildings, and sometimes flat owners within the same building, may need Section 3 notices. Your lease will also set out what the freeholder can and can’t do.

Do notices still apply if the building next door is listed?

Yes. Listing adds a requirement for listed building consent but doesn’t replace the Act. Both owners’ surveyors will take particular care with historic fabric in the Schedule of Condition and the Award.

Do you cover the whole Square Mile?

Yes, including the Barbican, Golden Lane, Smithfield, Fleet Street, the Temples, Bishopsgate and the riverside, at our fixed London fees for domestic work.

How much does a Party Wall Agreement cost in City of London?

Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.

How far in advance do I need to serve notice?

At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.

Do I need party wall notice if I already have planning permission from the council?

Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.

Is there a party wall notice template I can use?

Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many City of London owners prefer us to serve them for £150 + VAT.

Does the Party Wall Act apply to your project in City of London?

Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.

Free callGet a quote