Few boroughs pack so much variety into so small an area. Fournier Street in Spitalfields has one of the best-preserved collections of early Georgian town houses in Britain, most of them dating from the 1720s. Tredegar Square in Mile End is a well-preserved Georgian square lined with terraces, and the Boundary Estate in Shoreditch was completed by the London County Council in the 1890s. Docks and warehouses along the river have become flats, alongside newer blocks and post-war estates.
All of these buildings share structure with their neighbours, which makes party wall notices a routine part of most projects. We prepare and serve them on every adjoining owner, from a single neighbour in a terrace to several leaseholders in a block. A signed consent is your agreement. If a neighbour dissents, the surveyors deal with the Schedule of Condition and the Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Tower Hamlets?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Georgian houses, warehouses and flats: what applies here
Tower Hamlets Council has 58 conservation areas, each with an adopted character appraisal and management guidelines. The list runs from Brick Lane and Fournier Street, Elder Street and Tredegar Square to Victoria Park, Driffield Road, Wapping Pierhead and the Boundary Estate. Those designations guide planning decisions; they don’t alter party wall procedure.
What the Act means in practice:
Georgian town houses. Alterations to party walls in early 18th-century houses are Section 2 works and need two months’ notice under Section 3. If the house is listed, listed building consent is a separate requirement.
Victorian terraces in Bow, Bethnal Green and Stepney: lofts, rear extensions and chimney breast removal are the usual triggers.
Warehouse and mansion-block flats. Party floors and walls between flats make structural work inside a flat a party wall matter.
New buildings next door. Large excavations nearby can bring a Section 6 notice even where no wall is shared, because the Act reaches up to six metres for deep foundations.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Tower Hamlets
Fixed fees, with the same prices across London.
Tower Hamlets borders the City of London and Hackney, with Southwark and Greenwich across the Thames. We also cover:
Party Wall Agreement London · Party Wall Agreement City of London · Party Wall Agreement Hackney · Party Wall Agreement Newham · Party Wall Agreement Southwark · Party Wall Agreement Greenwich · Party wall agreement surveyor
Local party wall surveyors in Tower Hamlets
Your enquiry is handled by a local qualified surveyor from our team. In Tower Hamlets that is Kevin Redman BSc(Hons), MFPWS, with 25+ years’ experience in surveying and construction management.
Party wall questions from Tower Hamlets homeowners
How do I get a party wall agreement in Tower Hamlets?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Tower Hamlets?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Tower Hamlets?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I live in a Georgian house in Spitalfields. Are party wall notices different for listed buildings?
The notices are the same, but you may need listed building consent from Tower Hamlets Council as well. Where the house next door is listed, the surveyors will often want more detail on method and protection before agreeing an Award.
A developer is building near my flat in Wapping. Will I get a notice?
If the excavation is within six metres of your building and deep enough to cut a 45-degree line down from the bottom of its foundations, or within three metres and deeper than them, the developer must serve notice on the owners. In a block, that usually means the freeholder and the long leaseholders.
We're converting the loft of a terrace in Bow. How long before we can start?
At least two months after serving the Section 3 notice, unless your neighbours agree in writing to an earlier start. If they dissent, the Award also needs to be in place first. Serving early, while you finalise the drawings, helps avoid delays.
Do the floors in my warehouse conversion count as party structures?
Usually, yes. Floors and walls separating flats with their own entrances are party structures, so taking up a floor, cutting new openings or fixing heavy equipment into the structure can need notice to the owners above and below.
Do you cover the Isle of Dogs and Poplar?
Yes. We cover the whole of Tower Hamlets, from Spitalfields and Whitechapel to Bow, Poplar and the Isle of Dogs, at our fixed London fees.
How much does a Party Wall Agreement cost in Tower Hamlets?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Tower Hamlets?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.