Party Wall Agreement Newham
Newham’s streets are dominated by terraces. Housing in East Ham consists principally of Victorian and Edwardian terraced town houses, often on tree-lined avenues. North of the railway in Forest Gate, the “village” has terraced streets running up to the open spaces of Wanstead Flats, and the name Upton Park was first given to a housing estate laid out east of West Ham Park in the 1880s. Stratford was home to most of the Olympic Park for the 2012 Games.
In a terraced borough almost every loft conversion, rear extension or chimney breast removal affects at least one neighbour, and often two. We prepare the right notices under the Party Wall etc. Act 1996, serve them on every adjoining owner, including freeholders and long leaseholders where houses have been split into flats, and take the matter to a Party Wall Award if anyone dissents.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Newham?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Newham's conservation areas and Article 4 controls
Newham Council lists nine conservation areas, among them Durham Road in Manor Park, East Ham, Forest Gate Town Centre, Romford Road in Forest Gate, Sugar House Lane, Three Mills, University in Stratford and the Woodgrange Estate in Forest Gate. Article 4 directions currently apply in Durham Road, Romford Road and Woodgrange. The council notes that in conservation areas you may need planning permission for work that would not normally need it, such as dormer windows or changing windows and doors.
That changes the planning route, not the party wall one. In Newham the Act usually comes in at three points:
The loft. A dormer on a two-storey terrace typically means cutting into or raising both party walls, so each neighbour gets a Section 3 notice at least two months ahead.
The back addition. Infilling a side return or extending the rear means new foundations right beside the neighbour’s, usually Section 6, and a new wall on the boundary under Section 1.
The flats. Where a terrace house is divided into upper and lower flats, the floor between them is a party structure and work to it needs notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Newham
Fixed fees, with the same prices across London.
Newham runs from the River Lea in the west to the North Circular in the east. Nearby, we also cover:
Party Wall Agreement London · Party Wall Agreement Tower Hamlets · Party Wall Agreement Hackney · Party Wall Agreement Waltham Forest · Party Wall Agreement Redbridge · Party Wall Agreement Barking and Dagenham · Party Wall Agreement Greenwich · Party wall agreement surveyor
Local party wall surveyors in Newham
Your enquiry is handled by a local qualified surveyor from our team. In Newham that is Kevin Redman BSc(Hons), MFPWS, with 25+ years’ experience in surveying and construction management.
Party wall questions from Newham homeowners
How do I get a party wall agreement in Newham?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Newham?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Newham?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
My house is on the Woodgrange Estate in Forest Gate. Can I still put in a loft conversion?
Possibly, but the estate is a conservation area with an Article 4 direction, so check with Newham Council what needs planning permission. If you go ahead and the work involves the party walls, both attached neighbours need a Section 3 notice at least two months before you start.
We're infilling the side return of our East Ham terrace. Which notices apply?
Usually a Section 6 notice for the new foundations, which will be within three metres of next door and probably deeper, and a Section 1 notice if the new flank wall is built on or astride the boundary line. Both need at least a month’s notice.
I rent my flat. Should I have received the notice?
Only owners receive notices. If you are a tenant on a short tenancy, the notice goes to your landlord. If you hold a lease of more than a year, you count as an owner yourself and should be served.
My neighbour started knocking through the party wall without serving notice. What can I do?
Ask them to stop and serve the correct notice. Where notifiable work starts without notice, an adjoining owner can apply to court for an injunction to stop it until the Act has been followed. You can also ask for a Schedule of Condition of your home.
What if my neighbour lives abroad or the house is empty?
Notices can be served at the owner’s usual or last known address, or, where the owner can’t be identified, addressed to the ‘owner’ of the premises and fixed to a conspicuous part of it. We check Land Registry records before serving so the notice goes to the right person.
Do you cover Stratford, Forest Gate, Plaistow and Canning Town?
Yes. We cover all of Newham, including Stratford, Forest Gate, Manor Park, East Ham, Upton Park, Plaistow, Canning Town and Beckton, at our fixed London fees.
How much does a Party Wall Agreement cost in Newham?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Newham owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Newham?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.