Hackney was a rural retreat from Tudor to late Georgian times, and today much of the borough is Georgian and Victorian terraces, with many former warehouses converted into homes. De Beauvoir Town was developed around De Beauvoir Square in the mid-19th century, Stoke Newington prospered as a late Victorian and Edwardian suburb, and terraced Georgian, Victorian and Edwardian houses still survive in South Hackney near Victoria Park. Between the wars the London County Council and the borough council added estates such as Kingsmead and Morningside.
In a borough of terraces, almost every structural project needs a party wall notice. We serve notices on each adjoining owner, including the freeholders and leaseholders of houses that have been divided into flats. A written consent is your party wall agreement; a dissent means the surveyors prepare an Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Hackney?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
What Hackney's terraces mean for party wall work
Hackney Council designated its first conservation areas in 1969, at Clapton Square, Clapton Common, Clapton Pond and Clissold Park, and there are now 35, including De Beauvoir, Albion Square, Stoke Newington, Victoria Park and Broadway Market. They affect what needs planning permission; notice periods under the Act stay the same.
Roof and rear extensions on terraces. A mansard or dormer typically involves raising or cutting into both party walls (Section 3, two months). A ground-floor rear extension brings in Section 6 if the foundations go deeper than next door’s within three metres, and Section 1 if a new wall goes on the boundary.
Houses split into flats. Where a terrace house has been converted, the floors and walls between flats are usually party structures, and every leaseholder with more than a year to run counts as an owner.
Warehouse conversions. In former industrial buildings, the walls between units can be party walls just like those in a terrace, so structural alterations need the same notices.
Basements. Digging below a terrace house means Section 6 notices and, where the party wall is underpinned, Section 3 notices too.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Hackney
Fixed fees, with the same prices across London.
Hackney is bounded by Islington, Haringey, Waltham Forest, Newham, Tower Hamlets and the City of London. We also cover:
Party Wall Agreement London · Party Wall Agreement Islington · Party Wall Agreement Haringey · Party Wall Agreement Waltham Forest · Party Wall Agreement Newham · Party Wall Agreement Tower Hamlets · Party Wall Agreement City of London · Party wall agreement surveyor
Local party wall surveyors in Hackney
Your enquiry is handled by a local qualified surveyor from our team. In Hackney that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Hackney homeowners
How do I get a party wall agreement in Hackney?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Hackney?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Hackney?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I'm adding a mansard to my house in De Beauvoir. Who needs a notice?
Both attached neighbours, because the work normally involves raising or building into the party walls. Each gets a Section 3 notice at least two months before work starts, and each can consent or dissent separately. De Beauvoir’s conservation area status affects the planning application, not the notices.
The house next door in Stoke Newington is divided into three flats. Do I serve all of them?
You serve every owner whose part of the building is affected. For work to the party wall, that usually means the freeholder and the leaseholders of the flats against the wall. For excavation, owners of any part within the Act’s distances can be included. We check the titles first.
I live in a warehouse conversion in Hackney Wick. Does the Act apply to my flat?
It does. The Act isn’t limited to houses: walls and floors that separate your unit from others are generally party structures, so cutting into them, or carrying out structural work that affects them, needs notice.
What happens if my neighbour in Clapton doesn't reply to the notice?
After 14 days without a reply, a dispute is treated as having arisen. We then send a further notice under Section 10(4), and if they still don’t appoint a surveyor within ten days, one can be appointed for them. The Award is then made in the usual way.
Do you cover Shoreditch and Dalston as well?
Yes, the whole borough, from Shoreditch and Hoxton to Dalston, Clapton and Stamford Hill, at our fixed London fees.
How much does a Party Wall Agreement cost in Hackney?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Hackney owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Hackney?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.