Party Wall Agreement Camden
Camden stretches from the West End up to Hampstead and Highgate, and a large share of its homes stand in conservation areas: the council says its 40 conservation areas cover about half of the borough. Belsize Park is lined with Georgian and Victorian villas and mews houses, new villas went up in Primrose Hill after the land there was sold in 1840, and much of Kentish Town was developed for housing in the mid-19th century. Houses of that age often sit hard against each other, and many have since been split into flats.
That mix is why so many Camden projects start with a party wall notice. A rear extension, a mansard, a new basement or opening up a ground floor can all touch a shared wall or dig near a neighbour’s foundations. We work out which notices the Party Wall etc. Act 1996 requires, identify every owner from the Land Registry titles and serve the paperwork. A signed consent settles it; a dissent leads to a Party Wall Award, prepared by an agreed surveyor or by one surveyor for each side.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Camden?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Basements, villas and flats: party walls in Camden
Camden Council decides planning applications and runs building control, but it plays no part in party wall matters, which are settled between neighbours under the 1996 Act.
Basements. The council’s Basements planning guidance (CPG), adopted on 15 January 2021, asks for a Basement Impact Assessment with basement applications. The Act runs alongside that. Digging below a neighbour’s foundation level within three metres of their building is Section 6 work, and underpinning a shared wall is Section 2 work served under Section 3, so a basement scheme normally needs both kinds of notice.
Villas and mews houses. In Belsize Park and Primrose Hill, a side or rear addition to a paired villa often means building against, or cutting into, the wall shared with next door. Mews houses can share walls on more than one side.
Converted houses. Where a house is now flats, the floors and walls between the flats can themselves be party structures, and each leaseholder with more than a year left on their lease is an owner who must be served.
Conservation areas. With roughly half the borough designated, many owners need planning permission for work that would be permitted development elsewhere. That can change the design and the timetable, but not the notice periods.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Camden
Fixed fees, with the same prices across London.
Camden borders the City of Westminster, the City of London, Brent, Barnet, Haringey and Islington. We also cover:
Party Wall Agreement London · Party Wall Agreement Westminster · Party Wall Agreement Islington · Party Wall Agreement Barnet · Party Wall Agreement Brent · Party Wall Agreement Haringey · Party Wall Agreement City of London · Party wall agreement surveyor
Local party wall surveyors in Camden
Your enquiry is handled by a local qualified surveyor from our team. In Camden that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Camden homeowners
How do I get a party wall agreement in Camden?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Camden?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Camden?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
Does a Basement Impact Assessment replace party wall notices in Camden?
No. The Basement Impact Assessment is part of your planning application and is assessed by Camden Council. Party wall notices go to your neighbours and run to their own timetable: one month for excavation under Section 6 and two months for work to the party wall under Section 3. Notices lapse if work has not started within 12 months, so plan when you serve them.
I own a ground-floor flat in Kentish Town and want to extend. Whose consent do I need?
Often more than one person’s. The freeholder and any long leaseholders of the house next door are adjoining owners for work on the shared wall or for digging near their foundations. Separately, your own lease may require your freeholder’s permission, which is a lease matter rather than a party wall one. We check the titles before serving.
My Belsize Park house is semi-detached. Will a side extension need a notice?
Quite possibly. If the extension’s foundations are within three metres of next door and go deeper than theirs, Section 6 applies, and a new wall built up to the boundary line is covered by Section 1. Both need at least one month’s notice. If the plans involve the wall you share, a two-month Section 3 notice is needed as well.
Do I need party wall notices for work on a mews house?
Usually, if the work is structural. Mews houses often share walls with neighbours on more than one side, so cutting in steels, raising a wall for an extra storey or taking out a chimney breast can affect several owners at once. Each adjoining owner gets their own notice and can respond separately.
A neighbour in Hampstead has served me a notice for a basement. Should I agree?
You can consent, but you are also entitled to dissent so that a surveyor checks the engineering details and an Award records how the work will be done. Either way, ask for a Schedule of Condition of your home before work starts. The building owner normally pays the surveyors’ reasonable costs.
How much does a Party Wall Agreement cost in Camden?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Camden owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Camden?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.