Party Wall Agreement Leatherhead
Leatherhead grew up beside a ford on the River Mole, and from the mid-9th century it was the centre of a royal estate that took in Ashtead, Fetcham and Bookham. It is first mentioned in a royal will of 880, the first bridge over the Mole may have been built around 1200, and for much of its history it was an agricultural settlement with a weekly market. Turnpike roads came in the mid-18th century: the Epsom to Horsham road through the town was authorised in 1755, and turnpikes to Guildford and Kingston followed in 1758 and 1811. The first railway, from Epsom, opened on 1 February 1859 to a station in Kingston Road, and when the line south to Dorking opened in 1867 two new stations replaced it. Leatherhead Urban District Council built the town’s first council housing, 59 houses in Poplar Road, in 1921, followed by 90 in Kingston Road in 1925, while the private St Mary’s Road estate rose on the site of the Elm Bank mansion. Large-scale manufacturing arrived after the First World War, and in later decades the Swan Centre was built and the High Street pedestrianised.
From 1920s semis to large detached houses in the surrounding villages, the Party Wall etc. Act 1996 often applies. We serve the notices, record the neighbouring property and, if a neighbour dissents, agree an Award. The full package is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Leatherhead?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Leatherhead's conservation area and Article 4 controls
Mole Valley District Council has 26 conservation areas, each with its own character based on historic street patterns, open spaces, views and buildings. Leatherhead is one of three, with Dorking and Brockham, where parts of the conservation area are also covered by Article 4 directions. These add planning controls designed to protect features that contribute to the special interest of particular streets, and the council publishes descriptions and maps of them.
If you are planning work in the town centre, check both whether your property is in the conservation area and whether an Article 4 direction applies before changing windows, doors or other external features.
Typical Leatherhead party wall work:
Older buildings in the town centre: shared walls between properties in different ownership, where repairs and alterations are Section 2 work.
Council-built and private homes of the 1920s, such as Poplar Road and Kingston Road: lofts and rear extensions affecting an attached neighbour.
Detached houses in Fetcham, Ashtead and Bookham: large extensions with foundations close to the next house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Leatherhead
Fixed fees, with the same prices across Surrey.
Elsewhere in Surrey and south-west London, we also cover:
Party Wall Agreement Surrey · Party Wall Agreement Epsom · Party Wall Agreement Dorking · Party Wall Agreement Esher · Party Wall Agreement Reigate & Redhill · Party Wall Agreement Guildford · Party Wall Agreement Kingston upon Thames · Party wall agreement surveyor
Local party wall surveyors in Leatherhead
Your enquiry is handled by a local qualified surveyor from our team. In Leatherhead that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Leatherhead homeowners
How do I get a party wall agreement in Leatherhead?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Leatherhead?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Leatherhead?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our 1920s house in Poplar Road shares a wall with next door. What notices does a loft conversion need?
A Section 3 notice if you will cut into the party wall for beams or raise it, served two months before work on it. If the dormer is built off the party wall, that is also notifiable.
We live in a detached house in Fetcham. Could we still need a party wall agreement?
Yes, if you dig foundations within three metres of a neighbour’s building and deeper than its foundations, or within six metres where deep foundations would cut a 45-degree line from theirs.
Is the town centre conservation area relevant to our party wall notice?
It affects planning, not the Act. If your building is in the conservation area or under an Article 4 direction, sort the planning position first, then serve notices on the final design.
Our neighbour has dissented but we can't agree on one surveyor. What now?
Each side can appoint its own surveyor, and the two surveyors select a third to settle any disagreement between them. In practice the two surveyors usually agree the Award themselves.
What do you need from us to prepare the notices?
The address of each neighbour, the owners’ names if you know them, and drawings of the proposed work. For excavation, the engineer’s foundation details help us decide which sections apply.
Do you cover Ashtead, Bookham and Fetcham?
Yes. We cover Leatherhead, Fetcham, Ashtead, Great and Little Bookham, Mickleham and the rest of Mole Valley.
How much does a Party Wall Agreement cost in Leatherhead?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Leatherhead?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.