Party Wall Agreement Epsom
Epsom first became known for its spring: in 1621 a wall was built around it and a shed put up for invalids. Organised racing on Epsom Downs is believed to date from the early 17th century, and The Oaks and The Derby were established in 1779 and 1780. The town’s housing came later and in stages. In the 1890s Epsom Court, north of the centre, was divided and sold, and over the next twenty years terraced houses were built on the land. Shops on Waterloo Road and houses in Chase Road were built from 1928, the year the Copse Edge Avenue estate was begun. Langley Vale and the Epsom Wells estate were partly developed in the early 1930s, so they stayed out of the Green Belt and building carried on into the 1950s. In the early 2000s the former psychiatric hospitals at Horton were redeveloped to provide around 1,850 homes.
Terraces, interwar estates and converted hospital sites all raise party wall questions, and the Party Wall etc. Act 1996 sets out the notices. We serve them on every adjoining owner, prepare a Schedule of Condition and, if a neighbour dissents, take the work through to an Award. For a domestic project, notices through to Award cost £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Epsom?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Epsom and Ewell's 21 conservation areas
Epsom and Ewell Borough Council has 21 conservation areas, each with a map and appraisal. In Epsom they include the Town Centre, Church Street, Chalk Lane, College Road, Adelphi Road, Burgh Heath Road, Worple Road, Providence Place, Pikes Hill, Stamford Green, Woodcote and the Downs Road Estate. In Ewell there are Ewell Village and Ewell Downs Road/The Green. Another covers the hospital cluster at Horton, Long Grove, The Manor, St Ebba’s and West Park. The council also has Article 4 directions, some within these conservation areas and others that control changes of use.
Where an Article 4 direction applies, minor alterations can need planning permission. Party wall notices are always a separate step.
Typical Epsom work:
Terraces north of the centre: lofts and rear extensions involving the party wall.
Interwar and later houses off Chase Road and in Langley Vale: side extensions and new foundations near the neighbouring house.
Homes in the former hospital cluster: houses and flats where walls and floors are shared, so structural changes may need a Section 3 notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Epsom
Fixed fees, with the same prices across Surrey.
Near Epsom we also cover these areas of Surrey and south-west London:
Party Wall Agreement Surrey · Party Wall Agreement Sutton · Party Wall Agreement Kingston upon Thames · Party Wall Agreement Leatherhead · Party Wall Agreement Reigate & Redhill · Party Wall Agreement Esher · Party Wall Agreement Croydon · Party wall agreement surveyor
Local party wall surveyors in Epsom
Your enquiry is handled by a local qualified surveyor from our team. In Epsom that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Epsom homeowners
How do I get a party wall agreement in Epsom?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Epsom?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Epsom?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our terraced house is on the old Epsom Court land north of the centre. Is a loft conversion notifiable?
Very likely. In a terrace, loft steels are usually built into the party walls on one or both sides, which is Section 2 work. Serve Section 3 notices on each neighbour at least two months before starting.
We live in the Stamford Green conservation area. Do we need planning permission and party wall notices for a rear extension?
Check with the council about planning: conservation area status, and any Article 4 direction, removes some permitted development rights. Party wall notices depend on the boundary and the foundations, not on the conservation area.
Our neighbour in Ewell has dissented. Can we still use one surveyor?
Yes, if you both agree. A single Agreed Surveyor can act for both owners. If your neighbour prefers their own surveyor, each side appoints one and the building owner normally pays the reasonable fees of both.
What happens if our builder starts before the Award is signed?
Starting notifiable work without following the Act exposes you to an injunction, which can stop the job until the procedure is followed, as well as to claims for damage. Waiting for the Award is far quicker in the end.
Can a neighbour in Langley Vale make us change our plans?
Not the design itself, which is a planning matter. But surveyors can set conditions in the Award on how and when the work is done, such as working hours, protection of their property and access.
Do you cover Ewell, Stoneleigh and Epsom Downs?
Yes. We cover the whole borough, including Epsom, Ewell, West Ewell, Stoneleigh, Langley Vale and Epsom Downs.
How much does a Party Wall Agreement cost in Epsom?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Epsom owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Epsom?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.