Party Wall Agreement Esher
Esher’s centre is medieval in origin, grouped around the junction of the former main London to Portsmouth road, now the A307, with the roads to Weybridge and Leatherhead. Much of the surrounding land once belonged to great estates. In the 16th century several manors, Esher among them, were annexed to the Honour of Hampton Court to form a royal hunting ground. Claremont, to the south, was built as a mansion and later became a royal residence, and its landscape garden is now looked after by the National Trust. Esher Commons stretch towards Hersham, Cobham and Oxshott, Sandown Park racecourse sits beside the town, and the station on the South West Main Line links Esher with London Waterloo.
Homes here range from older properties in the conservation area to detached and semi-detached houses on the roads around it, and the Party Wall etc. Act 1996 can apply to all of them. We serve the right notices, record the condition of the neighbouring property and, if a neighbour dissents, see it through to an Award. Award included, the fixed fee outside London is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Esher?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Esher conservation area and what it covers
The Esher conservation area was designated by Surrey County Council on 31 July 1973. Elmbridge Borough Council later extended it to include Clive Road, and again on 27 February 2008 with three further extensions. It centres on the historic core at the old road junction and contains a number of important listed buildings, among them the Grade I listed Church of St George. A Character Appraisal and Management Plan, produced with the local community and endorsed by the planning committee in 2008, sets out what is special about the area, and there is an active Conservation Area Advisory Committee.
Conservation area status removes some permitted development rights, so check with Elmbridge before changing the outside of a building. The party wall side of a project is separate:
Older buildings in the centre: shared walls between properties, where repairs, underpinning or new openings are Section 2 work.
Detached houses on the roads around the town: new foundations or basements close to a neighbour’s house, needing a Section 6 notice.
Attached houses in Claygate, Hinchley Wood and elsewhere: lofts and extensions that involve the party wall.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Esher
Fixed fees, with the same prices across Surrey.
Near Esher, in Elmbridge and beyond, we also cover:
Party Wall Agreement Surrey · Party Wall Agreement Walton-on-Thames · Party Wall Agreement Weybridge · Party Wall Agreement Kingston upon Thames · Party Wall Agreement Epsom · Party Wall Agreement Leatherhead · Party Wall Agreement Richmond upon Thames · Party wall agreement surveyor
Local party wall surveyors in Esher
Your enquiry is handled by a local qualified surveyor from our team. In Esher that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Esher homeowners
How do I get a party wall agreement in Esher?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Esher?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Esher?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We live just outside the Esher conservation area boundary. Does that make party wall notices simpler?
No. The Act applies in the same way inside and outside a conservation area. What matters is whether your work affects a party wall, is on the boundary line or involves excavation near a neighbour.
Our detached house in Claygate is three metres from next door. Do we need a notice for a single-storey extension?
Possibly. A Section 6 notice is needed if the new foundations, within three metres of their building, will go deeper than its foundations. Your engineer’s drawings show the depth, and we check them before serving.
Can I build an extension wall that sits partly on my neighbour's land?
Only with their written consent. Under Section 1 a new wall can straddle the boundary as a party wall if your neighbour agrees; otherwise it must be built wholly on your land, although its footings may project under theirs where necessary.
The house next door in Esher is empty and we can't trace the owner. What now?
The Act allows a notice to be addressed to ‘the owner’ and fixed to a conspicuous part of the premises. If no one responds, a surveyor can be appointed on the absent owner’s behalf and the process carries on.
Do we pay for our neighbour's surveyor too?
Usually. The building owner normally pays the reasonable fees of the adjoining owner’s surveyor. If one Agreed Surveyor acts for both, there is only one fee, and our £899 + VAT package covers that role.
Which areas around Esher do you cover?
We cover Esher and the surrounding Elmbridge area, including Claygate, Hinchley Wood, Long Ditton, Thames Ditton, Molesey, Hersham, Cobham and Oxshott.
How much does a Party Wall Agreement cost in Esher?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Esher owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Esher?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.