Party Wall Agreement Guildford
Guildford has grown in stages since the railway arrived. Charlotteville was the town’s first new suburb. Onslow Village was laid out from the 1920s as a garden suburb on land bought from the Earl of Onslow, and former villages such as Burpham and Merrow are now part of the town. Because the Surrey Hills National Landscape surrounds the town on three sides, recent development has mostly been to the north, towards Woking.
Under the Party Wall etc. Act 1996, many of those projects need notice first, including a loft conversion on a semi, a rear extension to a Victorian terrace or new foundations on a sloping plot near the house next door. We serve those notices on every adjoining owner. If your neighbour consents, that written consent is your party wall agreement. If they dissent, our party wall surveyors prepare the Schedule of Condition and Party Wall Award. If you have received a notice, we can explain what it means.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Guildford?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Party wall matters in Guildford
Guildford Borough Council deals with planning and building control. Its conservation areas include the Town Centre, Charlotteville and Onslow Village. Conservation area status affects planning, not the Party Wall etc. Act 1996, which applies here as everywhere in England and Wales.
Guildford’s housing shapes which notices we usually see:
Victorian and Edwardian streets. Around Charlotteville and the older streets near the centre, terraces and semis share walls. Work such as inserting steels, raising the wall or removing a chimney breast needs a Section 3 notice two months before starting.
1920s garden-suburb houses. In Onslow Village and similar inter-war streets, loft conversions and side or rear extensions to semi-detached houses often involve the party wall or nearby foundations.
Sloping sites. Onslow Village is built on a slope, and so are other parts of the town. Section 6 depends on the depth of your excavation compared with your neighbour’s foundations, so levels matter. On a sloping plot, a modest extension can be deep enough to need notice.
Newer homes. Houses on more recent developments are often close together, so extensions can still fall within the three-metre rule.
Your neighbour’s written consent, or a Party Wall Award made by the surveyors, is your party wall agreement.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Guildford
Fixed fees, with the same prices across Surrey.
Guildford borough borders Woking, Waverley, Surrey Heath, Rushmoor, Elmbridge and Reigate and Banstead. We also cover:
Party Wall Agreement Surrey · Party Wall Agreement Woking · Party Wall Agreement Farnham · Party Wall Agreement Camberley · Party Wall Agreement Weybridge · Party Wall Agreement Reigate & Redhill · Party wall agreement surveyor
Local party wall surveyors in Guildford
Your enquiry is handled by a local qualified surveyor from our team. In Guildford that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Guildford homeowners
How do I get a party wall agreement in Guildford?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Guildford?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Guildford?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
My house in Guildford is on a sloping plot. Does that affect the party wall notice?
It can. Section 6 depends on how deep you dig compared with your neighbour’s foundations, within three metres or, for deeper work, six metres. On a slope, foundations or a lower-ground extension can be deeper than next door’s even if the work looks modest.
I live in Onslow Village. Does the conservation area change the party wall process?
No. Onslow Village, Charlotteville and Guildford’s other conservation areas have extra planning controls, but party wall notices, notice periods and the route to an agreement or Award are the same everywhere.
I'm converting the loft of a 1920s semi. What notice do I need?
If you are cutting beams into the shared wall, raising it or removing a chimney breast attached to it, you need a Section 3 party structure notice at least two months before starting. We can confirm once we have seen your drawings.
My neighbour in Burpham or Merrow has served me a notice. What should I do?
You have 14 days to consent, consent subject to a Schedule of Condition, or dissent and appoint a surveyor. The building owner normally pays the reasonable surveyors’ fees. We can explain the options on a free call.
Do you cover Godalming, Shalford and the villages around Guildford?
Yes. We cover the Guildford area and the surrounding villages on the same basis as the town.
How much does a Party Wall Agreement cost in Guildford?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Guildford owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Guildford?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.