Party Wall Agreement Southwark
Southwark’s homes span three centuries. Camberwell Grove and Grove Lane were built from the 1770s to the 1840s, Camberwell, Peckham and Nunhead grew as Victorian suburbs, and Dulwich Village has big Georgian houses next to Victorian and Edwardian terraces and 1930s family homes. In North Dulwich, the Sunray Estate’s cottages were built between 1920 and 1922 as a small garden suburb, and in Bermondsey the Wilson Grove cottages were built in the 1920s by the former borough council as municipal housing.
Party wall work follows the building type rather than the postcode. We look at your drawings, confirm which sections of the Party Wall etc. Act 1996 apply, and serve notices on everyone entitled to one. If a neighbour signs a consent, you have your agreement. If they dissent, the surveyors settle the details in a Party Wall Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Southwark?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Conservation areas, cottages and terraces in Southwark
Southwark Council handles planning, and its conservation area list runs from riverside warehouse districts such as St Saviour’s Dock and Tower Bridge to residential areas such as Camberwell Grove, Holly Grove in Peckham, Nunhead Green, Stradella Road and Dulwich Village. Some have Article 4 directions, including the Sunray Estate, where a direction confirmed in 1987 brings some external alterations under planning control.
Those controls govern what the council will permit. The Act governs how you deal with the neighbours, and here that usually means:
Georgian and Regency houses in Camberwell and Peckham: work to old party walls, typically under Section 3, with the surveyors looking closely at how the walls were built.
Victorian and Edwardian terraces: rear and side extensions (Sections 1 and 6) and loft conversions (Section 3).
1920s cottage estates such as Sunray and Wilson Grove: small semi-detached and terraced houses where an extension is often close to next door’s foundations.
Warehouse conversions near the river: party walls and party floors between units.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Southwark
Fixed fees, with the same prices across London.
Southwark borders Lambeth, Lewisham and Bromley, with the City of London and Tower Hamlets across the Thames. We also cover:
Party Wall Agreement London · Party Wall Agreement Lambeth · Party Wall Agreement Lewisham · Party Wall Agreement Bromley · Party Wall Agreement City of London · Party Wall Agreement Tower Hamlets · Party wall agreement surveyor
Local party wall surveyors in Southwark
Your enquiry is handled by a local qualified surveyor from our team. In Southwark that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Southwark homeowners
How do I get a party wall agreement in Southwark?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Southwark?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Southwark?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
My house is on the Sunray Estate. Does the Article 4 direction affect my party wall notices?
No. The direction means some external changes need planning permission from Southwark Council. Notices to your neighbours under the Party Wall etc. Act 1996, and the time limits that go with them, are unaffected.
We're extending a Georgian house on Camberwell Grove. Is there anything to watch?
Older party walls can be built differently from modern ones, so the surveyors will want clear structural details before they agree an Award. If the house is listed you will also need listed building consent, which is separate from the party wall process.
Is my converted warehouse flat in Bermondsey covered by the Act?
Yes, the Act applies to any building. Walls and floors dividing one flat from another are generally party structures, so structural work that affects them usually needs notice to the owners of the neighbouring flats.
I'm adding a loft to a Peckham terrace. How much notice do my neighbours get?
Two months for the party wall work under Section 3, such as building in steels or raising the wall, unless they agree in writing to an earlier start. If the work also includes new foundations near their house, a one-month Section 6 notice is served alongside.
Do you cover Bermondsey, Rotherhithe and Dulwich?
Yes. We cover the whole borough, from Bankside and Rotherhithe on the river to Dulwich and Nunhead in the south, at our standard London fees.
How much does a Party Wall Agreement cost in Southwark?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Southwark?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.