Party Wall Agreement Medway

Medway was formed in 1998 by merging the boroughs of Rochester-upon-Medway and Gillingham, and it takes in the five Medway Towns: Strood, Rochester, Chatham, Gillingham and Rainham. Much of the area grew around Chatham Dockyard. When the Chatham Lines were built to defend the yard and it expanded, more homes were needed for its workers, and because building could only happen beyond the Lines, New Brompton grew up there; Gillingham was then called New Brompton. In Chatham, the area between the High Street and Luton village shows the same growth in its many streets of Victorian terraces.

Terraced streets mean shared walls on both sides, so most lofts, kitchen extensions and chimney breast removals here need notices under the Party Wall etc. Act 1996, often to two neighbours at once. We serve them on everyone affected, record the condition of each neighbouring house and, where someone dissents, take the work through to an Award. For a domestic extension or loft, the full package costs £899 + VAT.

  • Notices for all your neighbours: £150 + VAT
  • Professionally qualified: RICS · FPWS · CABE
  • Free initial advice for building & adjoining owners

Request a fixed-fee quote

Tell us about your project in Medway. A local qualified surveyor from our team will reply, usually the same working day.

No payment online. Fixed fees, invoiced on completion.

RICSFaculty of Party Wall SurveyorsCABE
750+Projects
50,000+Photos for SOC reports
70%Projects where one surveyor acts for both
Party wall in Medway

Do I need a party wall agreement in Medway?

When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.

Typical projects that need notice include:

Rear and side-return extensionsLoft conversions with steel beams into the party wallChimney breast removalNew foundations within 3m of a neighbourGarden walls on the boundary
Planning permission isn’t the same thing. Approval from your local council (planning or building control) doesn’t replace your duties under the Party Wall Act. You still need to serve notice on your neighbours.
Illustration of a completed rear dormer loft conversion on a semi-detached house, cut away to show the finished loft room with stairs, bed and window, and the party wall shared with the neighbour
Local information

From Historic Rochester to Brompton Lines: Medway's 24 conservation areas

Medway Council has 24 conservation areas covering a wide range of heritage themes. They include Historic Rochester, Chatham Historic Dockyard, Brompton Lines, New Road Chatham, Maidstone Road Chatham, Gillingham Green, Gillingham Park, Railway Street Gillingham, Rainham High Street, Star Hill, Watts Avenue and Roebuck Road in Rochester, and villages such as Cliffe, Halling, Upnor and St Mary Hoo. The council publishes appraisals and management plans explaining what makes each one significant, along with design guides for historic houses and shopfronts.

Beyond the dockyard, on what was marshy land, St Mary’s Island now has several newer housing developments.

Common party wall work in the Medway Towns:

Victorian terraces in Chatham, Gillingham and Rochester: loft steels into the party wall, chimney breast removals and rear extensions, each needing notice to the neighbours on both sides.

Houses at different levels: where one house sits lower than its neighbour, new foundations can easily go deeper than next door’s and bring in Section 6.

Newer estates such as St Mary’s Island: extensions and garden walls close to the boundary.

How it works

From notice to agreement in four steps

The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.

Talk to your neighbour

We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.

We serve the notices

We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.

Neighbour consents, or a Schedule

If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.

Award if there’s a dispute

If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.

Which notices do common projects need?

Rear extension: typical notices
Usually s6 for foundations; s1 if built on the boundary. Illustrative, not to scale.
Loft conversion: typical notices
Usually s2 works under a s3 notice (2 months). Illustrative, not to scale.
Basement: typical notices
Usually s6 plus s2 underpinning. Illustrative, not to scale.

Typical only. The 1-minute checker or a free call will confirm what applies.

The dates that matter

The party wall timeline

Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.

Day
0
Start here

Notices served

Served on every adjoining owner, at least 1 or 2 months before work depending on the section.

14
days
Neighbour responds

Consent or dissent

Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.

+10
days
If no reply

Request to appoint

A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.

SoC
Before work

Schedule of Condition

The neighbour’s property is inspected and photographed to record its condition.

Award
If in dispute

Party Wall Award

Surveyors serve the Award. Either owner may appeal to the county court within 14 days.

Go
Notice period ends

Work starts

Once the notice period has run and consent or an Award is in place.

⏳ Section 3 & 6 notices lapse if work hasn’t started within 12 months🤝 Your neighbour can agree to an earlier start in writing

Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.

Fixed fees in Medway

Everyone starts with notices

The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.

Step 1 · every party wall agreement starts here

Party Wall Notices: £150 + VAT (£180 inc VAT)

One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.

Get my party wall notices servedFixed fee, invoiced on completion

What happens next depends on your neighbour’s response

Outcome A

Neighbour consents

£150 + VAT
£180 inc VAT · fixed fee, invoiced on completion
  • Your neighbour signs the consent form
  • The consent is your Party Wall Agreement
  • You can proceed with the works
  • We still recommend a Schedule of Condition to protect you
Find out more
Most common outcomeOutcome B

Consents, subject to a Schedule of Condition

£499 + VAT
£598.80 inc VAT · fixed fee, invoiced on completion
55% of all our projects are notices with a Schedule of Condition
Illustration of a surveyor recording an existing crack on a neighbour's internal wall with a tablet and a crack gauge for a Schedule of Condition
  • Notices for all neighbours + Land Registry checks
  • Site inspection of your neighbour’s property
  • Detailed photographic Schedule of Condition
  • Protects you against claims for damage that was already there
  • Each additional Schedule: £399 + VAT (£478.80 inc)
Request a fixed-fee quote
Outcome C

Neighbour dissents: an Award is needed

£899 + VAT
£1,078.80 inc VAT · total including notices
  • Notices for all neighbours + Land Registry checks
  • 1 Schedule of Condition
  • 1 Party Wall Award
  • Sets working hours, access & damage provisions

Agreed Surveyor — we act for both owners

£50 + VAT Currently waived

Total with Agreed Surveyor+ VATinc VAT
Full package£899£1,078.80
London£999£1,198.80

No extra cost while the waiver runs.

70% of our projects use one surveyor acting for both.

Neighbour appoints their own surveyor: our fee stays as shown. Their surveyor’s reasonable fees are normally payable by you and are charged separately.
Domestic extensions & loft conversions only. Excludes basement and commercial projects. Basement or commercial? Request a quote →
Request a fixed-fee quote
Prefer to serve your own notices?

DIY notices at partywall-notices.co.uk

Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.

Visit partywall-notices.co.uk ↗
Already served your own notices?

Schedule of Condition only: £450 + VAT (£540 inc)

We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.

Request a Schedule of Condition

Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.

Local coverage

Party wall surveyors in and around Medway

Fixed fees, with the same prices across Kent.

Near the Medway Towns, we also cover:

Party Wall Agreement Kent · Party Wall Agreement Maidstone · Party Wall Agreement Sittingbourne · Party Wall Agreement Gravesend · Party Wall Agreement Dartford · Party Wall Agreement Tonbridge · Party Wall Agreement Sevenoaks · Party wall agreement surveyor

Local party wall surveyors in Medway

  • John GreenanAssocRICSMFPWSACABEParty Wall & Residential Property Surveyor, South East
  • James MetcalfAssocRICSMFPWSParty Wall & Residential Property Surveyor, Kent

Your enquiry is handled by a local qualified surveyor from our team. In Medway that includes the surveyors listed above, each with 20 to 25+ years' experience in surveying, property and construction.

Medway FAQ

Party wall questions from Medway homeowners

How do I get a party wall agreement in Medway?

Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.

How long does a party wall agreement take in Medway?

Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.

Who pays for a party wall agreement in Medway?

Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.

We have a mid-terrace in Gillingham. Do both neighbours need a notice for our loft conversion?

Usually, yes. If steels or other work affect both party walls, each adjoining owner must be served a Section 3 notice at least two months before work starts. Each can respond differently: one may consent while the other dissents.

Our house is in the Historic Rochester conservation area. Can we remove a chimney breast?

Cutting away a chimney breast that projects from a party wall is Section 2 work, so you need a Section 3 notice. Check with Medway Council too, as conservation area status can affect works such as taking down a chimney stack.

My neighbour in Chatham has served a Section 6 notice. What should I look for?

A Section 6 notice must come with plans and sections showing the excavation and the proposed foundations, so check them. You can consent, or dissent and appoint a surveyor, and you can ask for a Schedule of Condition of your house before work starts.

Can our builder go into our neighbour's garden in Rainham to build the extension?

Under Section 8, the building owner and their workers have a right of access to the neighbour’s land where it is needed to carry out work under the Act. Fourteen days’ notice of entry is normally required, except in an emergency.

What if cracks appear in next door's house in Strood after our work?

Under Section 7 you must make good any loss or damage caused by work under the Act, or pay compensation if the neighbour prefers. A Schedule of Condition taken beforehand shows what was already there.

Do you cover the Hoo Peninsula and Walderslade?

Yes. We cover all of Medway, including Strood, Rochester, Chatham, Gillingham, Rainham, Walderslade, Lordswood, Hempstead and the villages of the Hoo Peninsula.

How much does a Party Wall Agreement cost in Medway?

Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.

How far in advance do I need to serve notice?

At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.

Do I need party wall notice if I already have planning permission from the council?

Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.

Does the Party Wall Act apply to your project in Medway?

Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.

Free callGet a quote