Party Wall Agreement Tonbridge
Tonbridge sits at a crossing point of the River Medway, about 6 km north of Tunbridge Wells and 10 km south-east of Sevenoaks. The old settlement stood on the north side of the river, which was less prone to flooding; protected now by flood control barriers, the town extends across the floodplain. A motte and bailey castle was built here in the 11th century, and Tonbridge School was founded in 1553.
South of the river are the Victorian railway terraces around Douglas Road and Barden Park, and estates off Brook Street with Radburn layouts, which keep footpaths apart from roads. Vauxhall lies to the south east. Many of these homes are attached to their neighbours, so lofts, kitchen extensions and chimney breast removals usually come under the Party Wall etc. Act 1996. We work out the notices you need, serve them on each neighbour, make a Schedule of Condition and, if anyone dissents, take the work to an Award. The fixed fee for notices, Schedule and Award is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Tonbridge?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Tonbridge conservation area: river, castle and High Street
The Tonbridge conservation area was first designated in 1969 and extended in 1981, 1985 and 1990. In 2008 Tonbridge and Malling Borough Council redrew the boundary, adding some areas and leaving out others, and it adopted the conservation area appraisal for development control purposes. The area runs from the Medway in the south to Yardley Park Road in the north, taking in the castle and the historic High Street. North and south of it, mainly 20th-century housing fans out onto higher land, which the appraisal says gives the town its characteristic dumb-bell shape.
The council has also adopted character area appraisals for the rest of Tonbridge, published in 11 sections, and for other settlements in the borough such as Hildenborough, Hadlow and Snodland.
Party wall work we see in Tonbridge:
High Street and older town-centre buildings: shared walls between buildings in different ownership, where repairs or alterations are Section 2 work under a two-month Section 3 notice.
Railway terraces around Barden Park and Douglas Road: loft steels and rear extensions affecting the walls on both sides.
Radburn-layout and other 20th-century estates: extensions and new foundations close to an attached or neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Tonbridge
Fixed fees, with the same prices across Kent.
Around Tonbridge and west Kent, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Tunbridge Wells · Party Wall Agreement Sevenoaks · Party Wall Agreement Maidstone · Party Wall Agreement Medway · Party Wall Agreement East Grinstead · Party Wall Agreement Dartford · Party wall agreement surveyor
Local party wall surveyors in Tonbridge
- John GreenanAssocRICSMFPWSACABEParty Wall & Residential Property Surveyor, South East
- James MetcalfAssocRICSMFPWSParty Wall & Residential Property Surveyor, Kent
Your enquiry is handled by a local qualified surveyor from our team. In Tonbridge that includes the surveyors listed above, each with 20 to 25+ years' experience in surveying, property and construction.
Party wall questions from Tonbridge homeowners
How do I get a party wall agreement in Tonbridge?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Tonbridge?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Tonbridge?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our terraced house near Barden Park needs a dormer loft. When should notices go out?
At least two months before the party wall work begins, because inserting steels or raising the wall is Section 2 work served under Section 3. If you share walls with neighbours on both sides, both need a notice.
Does the Tonbridge conservation area reach Yardley Park Road?
The appraisal describes it as running north to Yardley Park Road. Check the council’s map for your address, because the 2008 boundary changes added some streets and removed others. Party wall notices are needed in or out of the conservation area.
My neighbour in Hildenborough wants to underpin. What does that mean for me?
Underpinning a party wall is a Section 2 right and needs a Section 3 notice. If they underpin their own wall instead, but within three metres of your house and deeper than your foundations, it needs a Section 6 notice.
Can we start before the notice period ends if next door agrees?
Yes. Your neighbour can agree in writing to an earlier start. Without that, wait for the notice period to run and for either their consent or an Award.
Do we need two surveyors if our neighbour dissents?
Not necessarily. You and your neighbour can agree on one surveyor acting for both, the Agreed Surveyor, or appoint one each. Two surveyors then select a third, who only becomes involved if they can’t agree.
Do you cover Hadlow, Hildenborough and the Malling villages?
Yes. We cover Tonbridge and the rest of Tonbridge and Malling, including Hildenborough, Hadlow, East Peckham, Kings Hill, West Malling and Snodland.
How much does a Party Wall Agreement cost in Tonbridge?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Tonbridge?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.