Party Wall Agreement Tunbridge Wells
Royal Tunbridge Wells grew up around a chalybeate spring. It was a spa in the Restoration, and in the 1680s a building boom produced carefully planned shops beside the 175-yard Pantiles promenade, then known as the Walks, while the Mount Sion road was laid out in small plots on which lodging house keepers were to build. By the mid-1700s it was a fashionable resort, and after the Second World War large housing estates were built at Sherwood and Ramslye.
Houses on the old lodging-house plots, later villas and post-war estate homes all fall under the Party Wall etc. Act 1996 when work affects a neighbour. Where a building is listed, consent from the council and notices to the neighbours run side by side. We serve the notices, prepare the Schedule of Condition and agree the Award if a neighbour dissents. Our full package outside London is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Tunbridge Wells?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Royal Tunbridge Wells conservation area and the Act
Tunbridge Wells Borough Council has 25 conservation areas across the borough, most of them covering the historic cores of villages, with larger areas including Royal Tunbridge Wells, Southborough and Cranbrook. The Royal Tunbridge Wells and Rusthall appraisal is divided into areas that will be familiar to residents: The Pantiles, The Common and Mount Ephraim, Mount Sion and the High Street, the Calverley Park area, the town centre, the Camden Park area, St James, Pembury Road, Nevill Park and Hungershall Park, Broadwater Down and Molyneux Park. In the St James area, an Article 4(2) direction removes some permitted development rights over boundary features for named addresses, including houses on St James Road.
Those controls matter for planning. The Party Wall Act matters for neighbours:
Mount Sion and the High Street. Work to shared walls and chimney stacks between older attached buildings is Section 2 work under a two-month Section 3 notice, with listed building consent too where a building is listed.
St James and Camden Park. Rear extensions and lofts where houses share a wall, needing Section 3 and Section 6 notices.
Boundary walls. Rebuilding a shared front or garden wall is party wall work under Section 3, as well as a planning matter where the Article 4 direction applies.
Sherwood and Ramslye. Post-war estate houses with loft and rear extension projects.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Tunbridge Wells
Fixed fees, with the same prices across Kent.
Tunbridge Wells sits on the Kent border with East Sussex. Nearby, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Tonbridge · Party Wall Agreement Sevenoaks · Party Wall Agreement Maidstone · Party Wall Agreement East Grinstead · Party Wall Agreement Haywards Heath · Party wall agreement surveyor
Local party wall surveyors in Tunbridge Wells
Your enquiry is handled by a local qualified surveyor from our team. In Tunbridge Wells that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Tunbridge Wells homeowners
How do I get a party wall agreement in Tunbridge Wells?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Tunbridge Wells?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Tunbridge Wells?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our house in St James Road is covered by the boundary features direction. We want to rebuild the shared front wall. What do we need?
Check with the council first, because the Article 4(2) direction may mean planning permission is needed for changes to the wall. If the wall stands astride the boundary, rebuilding it is party wall work and needs a Section 3 notice to your neighbour at least two months ahead.
Our listed house on Mount Sion shares a chimney stack with next door. Can we take it down?
Not without listed building consent from Tunbridge Wells Borough Council, and the neighbour will need a Section 3 notice because a stack forming part of a party wall is a party structure. Expect the surveyors to look closely at support and weatherproofing for the remaining stack.
We're extending a semi in Sherwood. Does our neighbour have to agree?
They don’t have to agree, but they do have to be notified. If they dissent, surveyors make an Award setting out how the work will be done. That allows the work to proceed with protections for both of you.
Can a neighbour's surveyor insist on a full structural report?
Surveyors can reasonably ask for drawings and calculations to understand the notifiable work. For straightforward extensions this is normally your engineer’s existing design; for basements or work to old walls they may ask for more.
How long does the whole process take?
If neighbours consent, usually a few weeks from serving the notices. If an Award is needed, allow for the one- or two-month notice period plus time for the Schedule of Condition and for the surveyors to agree the Award.
Do you cover Rusthall, Southborough, Pembury and Langton Green?
Yes. We cover Royal Tunbridge Wells and the surrounding area, including Rusthall, Southborough, Pembury, Langton Green, Speldhurst and Paddock Wood.
How much does a Party Wall Agreement cost in Tunbridge Wells?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Tunbridge Wells owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Tunbridge Wells?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.