Party Wall Agreement Sevenoaks
Sevenoaks is a town of distinct neighbourhoods. Riverhead, to the north-west, is the largest settlement, and going clockwise from the north the town also takes in Greatness, Wildernesse, Hollybush, Sevenoaks Common and Kippington, among others. Riverhead’s own conservation area covers about 25 acres and contains around 30 listed buildings, mostly from the 17th and 18th centuries, with older unlisted properties dating mainly from the 19th century. Like much of West Kent, Sevenoaks has a skilled workforce, many of whom commute to central London, which has led to high house prices and pressure to build more homes.
High values tend to mean ambitious projects: basements, large rear extensions, replacement houses and loft conversions. Each can bring in the Party Wall etc. Act 1996, whether the house is a semi or a detached property close to its neighbour. We serve the right notices, organise Schedules of Condition and agree the Award if anyone dissents. Our full package outside London is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Sevenoaks?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
41 conservation areas across the district
Sevenoaks District Council has 41 designated conservation areas, ranging from town centres such as Sevenoaks and Westerham to villages and hamlets. In Sevenoaks itself they include Hartslands, Sevenoaks High Street, Kippington and Oakhill Road, The Vine, Vine Court, Granville and Eardley Road, Wildernesse and Brittains Farm, with Riverhead, Seal, Otford and Chipstead nearby. The council publishes Conservation Area Design Guidance covering alterations, repairs and new development to buildings in conservation areas.
None of that removes party wall duties. Here is how they usually apply:
Replacement houses and basements in Kippington, Wildernesse and similar roads may not share a wall with anyone, but excavation within three metres of a neighbouring building, below its foundations, or within six metres and cutting a 45-degree line from them, needs a Section 6 notice.
Attached older houses in Hartslands and Riverhead share walls, so lofts, chimney breast removals and rear extensions usually need Section 3 and Section 6 notices.
Semi-detached houses across the town are typical candidates for hip-to-gable lofts with steels in the party wall.
Listed buildings in Riverhead and the High Street need listed building consent as well as party wall notices.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Sevenoaks
Fixed fees, with the same prices across Kent.
Around Sevenoaks, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Tonbridge · Party Wall Agreement Tunbridge Wells · Party Wall Agreement Maidstone · Party Wall Agreement Dartford · Party Wall Agreement Bromley · Party wall agreement surveyor
Local party wall surveyors in Sevenoaks
Your enquiry is handled by a local qualified surveyor from our team. In Sevenoaks that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Sevenoaks homeowners
How do I get a party wall agreement in Sevenoaks?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Sevenoaks?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Sevenoaks?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We're building a basement under a detached house in Kippington. Our neighbour's house is five metres away. Is that notifiable?
Possibly. Within six metres, Section 6 applies if the excavation would cut a line drawn downwards at 45 degrees from the bottom of the neighbour’s foundations. An engineer’s section drawing will show whether it does; if so, serve notice at least one month before work.
My cottage in Hartslands shares a wall with two neighbours. Do both need notices for a loft?
If the work cuts into or bears on both party walls, yes, each adjoining owner gets their own Section 3 notice at least two months before work starts, and each can respond separately.
Our neighbour in Riverhead wants to raise the party wall for an extra storey. Can they?
Section 2 gives a building owner the right to raise a party wall, subject to serving a Section 3 notice and, if you dissent, the terms of an Award. Under Section 7 they must also make good, or compensate you for, any loss or damage the work causes.
Do we still need a party wall notice if we have the council's approval under its design guidance?
Yes. Planning permission and design approval are separate from the Party Wall Act, so notices are still needed wherever the Act applies.
Can I appoint my own surveyor if I'm the neighbour?
Yes. You can agree to a single agreed surveyor acting for both owners, or appoint your own. Either way, the building owner normally pays the reasonable costs.
Do you cover Seal, Otford, Westerham and Sevenoaks Weald?
Yes. We cover Sevenoaks and the surrounding district, including Riverhead, Chipstead, Dunton Green, Seal, Otford, Kemsing, Westerham and Sevenoaks Weald.
How much does a Party Wall Agreement cost in Sevenoaks?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Sevenoaks owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Sevenoaks?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.