Party Wall Agreement Sutton
Sutton’s housing tells the story of a string of Surrey villages absorbed by suburban London. In Wallington, a housing estate of gothic revival villas was laid out in the 1860s, and Clifton Road, Belmont Road and Park Road still have imposing Victorian and Edwardian villas. Carshalton was known for its lavender fields until demand for building land ended commercial growing, and Cheam keeps a village centre whose conservation area, designated in 1970, mixes historic parkland, houses of varying ages and a mock Tudor shopping parade. On the borough’s northern edge, the London County Council built the St Helier estate between 1928 and 1936 on garden city lines, the second largest of its out-county cottage estates after Becontree.
From an Edwardian villa to an inter-war cottage, most of these homes are joined to, or built close to, a neighbour. That brings the Party Wall etc. Act 1996 into most extensions and lofts. We prepare the notices, serve them on every adjoining owner and, if anyone dissents, see the matter through to a Party Wall Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Sutton?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Sutton's planning controls and the work we see
The London Borough of Sutton has three Article 4 directions. One covers certain houses in Sutton Garden Suburb, on Meadow Close, Woodend, Hawthorne Close, Horse Shoe Green, Oaks Close and Greenhill, and was confirmed in 2007. Another, from 1984, removes permitted development rights for roof alterations on a number of individual properties across the borough, so extensions, dormers and other roof changes there need a planning application. The third, borough-wide, brings conversions to small houses in multiple occupation under planning control.
Planning permission is a matter between you and the council. Party wall notices are a matter between you and the neighbours, and the two run separately. In Sutton the projects that usually need notices are:
A loft conversion on an inter-war house, such as the cottages of the St Helier estate, where the floor steels are built into the shared wall and a Section 3 notice is needed two months before work.
A rear or side extension beside a neighbour’s house, which brings in Section 6 when the new foundations go deeper than theirs within three metres, and Section 1 when a new wall goes on the boundary line.
Work to a large Victorian or Edwardian villa in Wallington, Sutton or Cheam that has been divided into flats, where the floors and walls between flats are party structures.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Sutton
Fixed fees, with the same prices across London.
Sutton borders Croydon, Merton and Kingston upon Thames, and the Surrey boroughs of Epsom and Ewell and Reigate and Banstead. We also cover:
Party Wall Agreement London · Party Wall Agreement Croydon · Party Wall Agreement Merton · Party Wall Agreement Kingston upon Thames · Party Wall Agreement Epsom · Party Wall Agreement Reigate & Redhill · Party wall agreement surveyor
Local party wall surveyors in Sutton
Your enquiry is handled by a local qualified surveyor from our team. In Sutton that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Sutton homeowners
How do I get a party wall agreement in Sutton?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Sutton?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Sutton?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
My house in Sutton Garden Suburb is covered by the Article 4 direction. Does that change the party wall process?
No. The direction means some alterations to the named houses need planning permission first. Once you know what you can build, your neighbours get the same notices, with the same notice periods, as anywhere else.
Is a loft conversion on a St Helier cottage estate house notifiable?
Usually. On a terrace or semi the steels for the new loft floor generally bear on the party wall, which is work under Section 2 of the Act. A Section 3 notice must go to each attached neighbour at least two months before work starts.
We live near Cheam Village. Our neighbour wants to dig deep foundations for an extension. What should we expect?
A Section 6 notice, served at least a month beforehand, if the excavation is within three metres of your home and deeper than your foundations, or within six metres and below a 45-degree line drawn down from them. You can consent or dissent within 14 days.
What happens if I don't respond to a notice?
For Section 3 and Section 6 notices, silence for 14 days means a dispute is treated as having arisen. The building owner can then serve a further notice under Section 10(4), and if you still haven’t appointed a surveyor within ten days, one can be appointed on your behalf.
Can the neighbour's builders come onto my land?
Under Section 8 the building owner and their workers can enter adjoining land when it is necessary for notifiable work, but they must normally give 14 days’ notice first, and any damage caused has to be made good.
Do you cover Carshalton, Wallington, Belmont and Worcester Park?
Yes. We cover the whole London Borough of Sutton, including Sutton, Cheam, Carshalton, Wallington, Belmont, Beddington, Hackbridge and Worcester Park, at our fixed London fees.
How much does a Party Wall Agreement cost in Sutton?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Sutton owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Sutton?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.