Party Wall Agreement Merton
Wimbledon grew in two parts: the old village on the hill, and the town that developed after the railway station opened in 1838, when large numbers of villas and terraced houses were built along the roads towards Putney, Merton Park and Raynes Park. Merton Park itself was developed between 1870 and 1904 on garden-suburb lines, with tree-lined roads of detached and semi-detached houses. To the south and east, Morden and Mitcham have their own conservation areas, from Upper Morden to Cricket Green.
For party wall purposes, what matters is how close the houses are. Semis share a wall; detached houses on tight plots can have foundations only a few metres apart. We check how the Party Wall etc. Act 1996 applies to your plans, serve the notices and look after the Award if a neighbour dissents.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Merton?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Merton's conservation areas and party wall work
Merton Council’s conservation areas include Wimbledon Village, Wimbledon North, Wimbledon West, Wimbledon Hill Road, Merton Park, Cricket Green in Mitcham and Upper Morden. Merton Park has had Article 4 directions since 1986, which bring certain external alterations under planning control.
Those planning rules do not alter the Act. The common projects here are:
Garden-suburb houses in Merton Park. Side and rear extensions to detached and semi-detached houses, where foundations close to the neighbour bring in Section 6.
Wimbledon villas and terraces. Loft conversions and basements involve the party wall (Section 3) and excavation (Section 6).
Semis and terraces elsewhere in the borough. Loft conversions that use the shared wall, and rear kitchen extensions.
Garden and boundary walls. A new wall on the line of junction needs a Section 1 notice at least a month before work.
Where an existing party wall is defective or out of repair, Section 11 lets the cost of putting it right be shared between the owners in proportion to their use and responsibility. The surveyors record that split in the Award, so it pays to raise any known problems before the notice is served.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Merton
Fixed fees, with the same prices across London.
Merton sits between Wandsworth, Lambeth, Croydon, Sutton and Kingston upon Thames. We also cover:
Party Wall Agreement London · Party Wall Agreement Wandsworth · Party Wall Agreement Lambeth · Party Wall Agreement Croydon · Party Wall Agreement Sutton · Party Wall Agreement Kingston upon Thames · Party wall agreement surveyor
Local party wall surveyors in Merton
Your enquiry is handled by a local qualified surveyor from our team. In Merton that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Merton homeowners
How do I get a party wall agreement in Merton?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Merton?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Merton?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
My Merton Park house is covered by an Article 4 direction. Do I need different notices?
No. The direction means certain external changes need planning permission from Merton Council. Party wall notices and the response periods for your neighbours stay exactly the same.
We're planning a basement under our Wimbledon house. Which notices apply?
Normally a Section 6 notice for the excavation, because it will be within three metres of next door and below their foundations, and a Section 3 notice if the party wall is underpinned. Deep basements can also catch buildings up to six metres away.
Our neighbour in Raynes Park is building an extension right up to our fence. Should we have had a notice?
If they are building a new wall on or up to the boundary, or digging foundations deeper than yours within three metres, yes. If no notice was served, ask them to serve one before going any further. An adjoining owner can ask the court to stop notifiable work that has started without notice.
I'm a leaseholder in a converted Wimbledon house. Do I count as an owner?
If your lease has more than a year left to run, yes. You are entitled to receive notice of work that affects your part of the building, alongside the freeholder.
Do you cover Mitcham, Morden and Colliers Wood?
Yes. We cover the whole of Merton, from Wimbledon and Raynes Park to Morden, Mitcham and Colliers Wood, at our fixed London fees.
How much does a Party Wall Agreement cost in Merton?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Merton owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Merton?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.