Party Wall Agreement Kingston upon Thames
Surbiton was first developed in the 1840s, when it was known as Kingston-upon-Railway, and it still mixes grand 19th-century townhouses with Art Deco courts, newer blocks and semi-detached 20th-century estates. In New Malden, two- and three-bedroom terraced houses went up north of the station in the late 19th and early 20th centuries, with larger detached and semi-detached houses towards Coombe Hill, and the farms south of the Kingston bypass were built over for housing after the road opened in 1927.
That gives the borough a great many semis and terraces, and the projects that come with them: loft conversions, side and rear extensions and the occasional basement. Each can need notice under the Party Wall etc. Act 1996. We serve notices on every adjoining owner and deal with Schedules of Condition and, if anyone dissents, the Party Wall Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Kingston upon Thames?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Party walls in Surbiton, New Malden and Kingston
According to the Royal Borough of Kingston upon Thames, its 26 conservation areas cover about 9.4 per cent of the borough and contain around 10,000 postal addresses. They include Kingston Old Town, Surbiton Hill Park, The Groves, Fairfield/Knight’s Park, Old Malden and Coombe Hill. Inside them the council’s planning controls are tighter, but the Act is unchanged.
Projects we typically see:
Inter-war semis. Hip-to-gable and dormer lofts that build into the shared wall need a two-month Section 3 notice. Side extensions close to the house next door can need Section 6.
Older terraced houses: kitchen extensions and side returns, usually under Section 6 and sometimes Section 1.
Houses divided into flats: work to the floors and walls between flats affects the other owners.
Detached houses around Coombe and Kingston Hill: no shared wall, but deep foundations within three or six metres of a neighbour still need notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Kingston upon Thames
Fixed fees, with the same prices across London.
Kingston borders Richmond upon Thames, Wandsworth, Merton and Sutton, and the Surrey districts of Epsom and Ewell, Mole Valley and Elmbridge. We also cover:
Party Wall Agreement London · Party Wall Agreement Richmond upon Thames · Party Wall Agreement Wandsworth · Party Wall Agreement Merton · Party Wall Agreement Sutton · Party Wall Agreement Epsom · Party Wall Agreement Leatherhead · Party Wall Agreement Esher · Party wall agreement surveyor
Local party wall surveyors in Kingston upon Thames
Your enquiry is handled by a local qualified surveyor from our team. In Kingston upon Thames that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Kingston upon Thames homeowners
How do I get a party wall agreement in Kingston upon Thames?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Kingston upon Thames?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Kingston upon Thames?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I'm doing a hip-to-gable loft on a 1930s semi in New Malden. What notice do I need?
Usually a Section 3 notice to your attached neighbour, because the steels for the new loft floor and roof are normally built into the party wall, and the chimney breast on it may be cut back. Serve it at least two months before the work starts.
My house is in the Surbiton Hill Park conservation area. Does that affect the notices?
No. Conservation area status means the council looks more closely at planning applications, and some work needs permission that wouldn’t elsewhere. Party wall notices and timescales are not affected.
Who pays if my neighbour's work damages my house?
Under Section 7 of the Act, the building owner must make good, or pay compensation for, loss or damage caused by notifiable work. A Schedule of Condition taken before work starts makes it much easier to show what the work caused.
Can one surveyor act for both of us?
Yes. If you and your neighbour agree, a single agreed surveyor can act for both owners and prepare the Award, which is usually quicker and costs less. Either owner can instead appoint their own surveyor if they prefer.
Do you cover Chessington, Tolworth and Old Malden?
Yes. We cover the whole Royal Borough, including Kingston, Surbiton, New Malden, Tolworth, Chessington and Old Malden, at the same fixed London fees.
How much does a Party Wall Agreement cost in Kingston upon Thames?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Kingston upon Thames owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Kingston upon Thames?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.