Party Wall Agreement Southend
Southend-on-Sea began as a resort above the estuary. Royal Terrace and Grove Terrace were completed in the 1790s, and from 1871, when the first houses in the planned Clifftown development went on sale, even the smaller properties offered a glimpse of the sea. Between 1871 and 1901 the town’s population grew from 2,800 to 29,000. Westcliff took its name when the Milton Estate was sold to speculators between 1860 and 1880, Thorpe Bay is mainly 1920s houses laid out on a grid, and the Earls Hall and Manners Way estates were built in the 1930s to meet demand from people moving out of London.
Whatever their age, lofts, rear extensions and basements in houses that share or sit close to a neighbour’s wall usually need notice under the Party Wall etc. Act 1996. We serve those notices, prepare Schedules of Condition and, if a neighbour dissents, agree the Award. Outside London our full package, with notices, a Schedule of Condition and an Award, is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Southend?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Southend's conservation areas and Article 4 directions
Southend-on-Sea City Council publishes a table of its conservation areas showing which have Article 4 directions. Chapmanslord, Clifftown, Leigh, Leigh Cliff, Leigh Old Town, Milton and Shorefields have them; Crowstone, Eastern Esplanade, Kursaal, Prittlewell, Shoebury Garrison, The Leas and Warrior Square do not. Clifftown was designated in 1968 and later extended twice; its appraisal, adopted in March 2022, recommends updating the Article 4 direction, so check the council’s page before starting work. The council also points out that flats and commercial properties have no permitted development rights at all.
In practice:
Clifftown and Milton. Older terraces share party walls along their length. Any work to those walls, from steels to chimney breast removal, needs a Section 3 notice.
Leigh-on-Sea and Westcliff. Lofts and rear extensions to terraces and semis, typically Section 3 and Section 6 notices.
Thorpe Bay and 1930s estates. Side extensions and hip-to-gable lofts on semis, plus Section 6 where foundations go deep near a neighbour.
Converted flats. Party floors between flats count as party structures.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Southend
Fixed fees, with the same prices across Essex.
Southend is bordered by Rochford to the north and Castle Point to the west. Across south Essex, we also cover:
Party Wall Agreement Essex · Party Wall Agreement Rayleigh · Party Wall Agreement Basildon · Party Wall Agreement Billericay · Party Wall Agreement Thurrock · Party Wall Agreement Chelmsford · Party wall agreement surveyor
Local party wall surveyors in Southend
Your enquiry is handled by a local qualified surveyor from our team. In Southend that includes surveyors such as Kevin Redman BSc(Hons), MFPWS and John Greenan AssocRICS MFPWS ACABE, each with 25+ years’ experience in surveying and construction.
Party wall questions from Southend homeowners
How do I get a party wall agreement in Southend?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Southend?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Southend?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
My flat in a converted Westcliff house needs new floor joists. Do I need to serve notice?
Usually yes. A floor separating flats with their own entrances is a party structure, so work to it needs a Section 3 notice to the other owners, including the freeholder and any leaseholders with more than a year left.
We're in the Leigh Cliff conservation area. Does the Article 4 direction stop a rear extension?
Not necessarily, but it may mean you need planning permission for changes that are usually allowed. Check with the council first. If the extension goes ahead near a neighbour’s foundations, they will need a Section 6 notice.
How much notice must I give for a loft on a Leigh-on-Sea terrace?
At least two months for a Section 3 notice to each attached neighbour if the work involves the party walls. If you also dig new foundations for a rear extension, a Section 6 notice needs at least one month.
Our Thorpe Bay neighbour's builder damaged our fence and cracked a wall. What now?
Section 7 makes the building owner responsible for making good, or paying compensation for, damage caused by notifiable work. If an Award was made, the surveyors deal with it; if not, a dispute can still be referred to surveyors under the Act.
Does the £899 + VAT price apply in Southend?
Yes. Southend is outside London, so our full package with notices, one Schedule of Condition and one Award for domestic extensions and lofts is £899 + VAT. Notices alone are £150 + VAT.
Do you cover Leigh-on-Sea, Westcliff, Shoeburyness and Eastwood?
Yes. We cover all of Southend-on-Sea, including Leigh-on-Sea, Westcliff, Chalkwell, Prittlewell, Eastwood, Thorpe Bay and Shoeburyness.
How much does a Party Wall Agreement cost in Southend?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Southend owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Southend?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.