Party Wall Agreement Maldon
Maldon sits on the Blackwater Estuary and was first recorded in 913 as Maeldun, meaning ‘monument hill’. It became a significant Saxon port with a hythe or quayside, a royal mint operated from 958, and in 991 the defenders were defeated nearby at the Battle of Maldon. The town received a charter in 1171, and All Saints’ Church, unique in England for its triangular tower, existed by 1180. St Mary’s Church by the Hythe Quay has a Grade I listed Norman nave from 1130, the building now called The Blue Boar Hotel dates from the later 14th century, and the Moot Hall is a 15th-century house at 39 High Street that the corporation bought in 1576. Hythe Quay, where the Chelmer and Blackwater meet, was an important port and is still home to Thames sailing barges, among the last cargo vessels in the world still working under sail. At the 2021 census the parish had 14,938 people, and the built-up area including Heybridge had 23,380.
Medieval and Georgian buildings on the High Street, Victorian terraces and modern estates all bring the Party Wall etc. Act 1996 into play. We serve the right notices, record the neighbouring property and, if a neighbour dissents, agree an Award, with a fixed fee of £899 + VAT for the complete service.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Maldon?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Maldon conservation area and its Article 4 streets
Maldon District Council has 15 conservation areas. The Maldon conservation area was first designated in 1969, revised and extended in 1998, and now takes in the medieval town centre, the port area at the Hythe and much of the 19th-century housing around them. Its appraisal counts about 185 listed buildings, and on the north-west side it joins the Chelmer and Blackwater Navigation conservation area. Heybridge Basin has a separate conservation area.
The appraisal describes Victorian and Edwardian streets laid out on former back-land, with the earlier and grander houses faced in white brick and the later ones in soft reds and London stocks. To protect areas of later 19th-century housing, the council has made Article 4(2) directions in Tenterfield Road, Victoria Road and North Street, which withdraw some permitted development rights.
Common party wall work in Maldon:
High Street buildings: older timber-framed properties, often hidden behind render, with shared walls between different owners.
Later 19th-century houses in streets such as Tenterfield Road and Victoria Road: lofts, chimney breast removals and rear extensions.
Houses in Heybridge and newer estates: extensions and foundations near a neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Maldon
Fixed fees, with the same prices across Essex.
Elsewhere along the Blackwater and in Essex, we also cover:
Party Wall Agreement Essex · Party Wall Agreement Witham · Party Wall Agreement Chelmsford · Party Wall Agreement Southend · Party Wall Agreement Rayleigh · Party Wall Agreement Braintree · Party Wall Agreement Billericay · Party wall agreement surveyor
Local party wall surveyors in Maldon
Your enquiry is handled by a local qualified surveyor from our team. In Maldon that includes surveyors such as Kevin Redman BSc(Hons), MFPWS and John Greenan AssocRICS MFPWS ACABE, each with 25+ years’ experience in surveying and construction.
Party wall questions from Maldon homeowners
How do I get a party wall agreement in Maldon?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Maldon?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Maldon?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our terrace in Tenterfield Road has an Article 4 direction. Does that change the party wall process?
No. The direction affects whether certain external changes need planning permission. Any work to the shared wall or close to the neighbour’s foundations still needs the usual notices, served at the right time before work begins.
We want to remove a chimney breast in our Victorian house in Maldon. Who do we notify?
The owner on the other side of that wall. Removing a chimney breast is work to a party wall under Section 2, so a Section 3 notice is needed at least two months ahead, and the stack above must stay properly supported.
Our High Street building is listed. Can the neighbour still carry out party wall work?
Yes, the Act still gives them rights, but they will need listed building consent for work to a listed party wall. An Award can set out methods suited to the old fabric and record its condition first.
Is a notice needed for an extension near the river with deeper foundations?
If the new foundations are within three metres of a neighbour’s building and go deeper than its foundations, a Section 6 notice is needed one month before work. Near the estuary, ground conditions can mean deeper footings.
What does our neighbour do if they receive our notice?
They have 14 days to consent or dissent in writing. If they dissent or do not respond, a surveyor, or one each, is appointed to agree an Award before the notified work goes ahead.
Do you cover Heybridge, Heybridge Basin and Burnham-on-Crouch?
Yes. We cover Maldon, Heybridge, Heybridge Basin and the wider district, including Burnham-on-Crouch, Tollesbury and the Dengie Peninsula.
How much does a Party Wall Agreement cost in Maldon?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Maldon owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Maldon?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.