Party Wall Agreement Billericay
Billericay was founded in the 13th century in the manor of Great Burstead, and the market that was the reason for the town is recorded for the last time in 1899. Many houses were built here in the Georgian period, and Burghstead Lodge on the High Street, which used to house the library, is one that remains. The Town Hall of 1830 stands at 94 High Street. When the 1841 census was taken the town had 1,824 people. The railway arrived in 1889, on the branch line between Shenfield and Southend. At the 2021 census the built-up area had a population of 34,075. Much of St Andrew’s Hospital, which began as the 1840 workhouse on Norsey Road, has been redeveloped as housing, with the listed workhouse buildings converted to homes.
So a Billericay project could involve a listed building on the High Street, a converted hospital building or a house on a newer road. In each case the Party Wall etc. Act 1996 sets out the notices. We serve them on every adjoining owner, prepare a Schedule of Condition and, where a neighbour dissents, take the matter to an Award. For a typical extension or loft, the whole process costs £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Billericay?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Billericay High Street, Basildon's largest conservation area
Billericay is part of the Borough of Basildon, whose council lists four conservation areas. The largest is Billericay High Street. Great Burstead, a small group of weather-boarded buildings and cottages around the Grade I listed church of St Mary Magdalene, is another, and Little Burstead was designated in 1983.
In a conservation area, demolishing a building or a sizeable wall usually needs planning permission and works to trees must be notified in advance, so check with Basildon before starting. Party wall notices are a separate legal step.
Typical Billericay party wall work:
Older buildings on the High Street: shops and homes in different ownership share walls, and repairs, underpinning or new openings are Section 2 work needing two months’ notice.
Converted buildings on the former hospital site: flats and houses where walls and floors are shared, so structural changes may need a Section 3 notice.
Family homes on later roads: loft conversions, and extensions with foundations close to the neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Billericay
Fixed fees, with the same prices across Essex.
From Billericay, across mid and south Essex, we also cover:
Party Wall Agreement Essex · Party Wall Agreement Basildon · Party Wall Agreement Brentwood · Party Wall Agreement Chelmsford · Party Wall Agreement Rayleigh · Party Wall Agreement Southend · Party Wall Agreement Maldon · Party wall agreement surveyor
Local party wall surveyors in Billericay
Your enquiry is handled by a local qualified surveyor from our team. In Billericay that includes surveyors such as Kevin Redman BSc(Hons), MFPWS and John Greenan AssocRICS MFPWS ACABE, each with 25+ years’ experience in surveying and construction.
Party wall questions from Billericay homeowners
How do I get a party wall agreement in Billericay?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Billericay?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Billericay?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We own a listed building on Billericay High Street. Does listed building consent cover the neighbour's side too?
No. Listed building consent deals with the heritage of your own building, while the Party Wall etc. Act 1996 deals with your neighbour’s rights. If the work affects a party wall, you still need to serve notice, and your neighbour may want a detailed Schedule of Condition before work begins.
We live in one of the converted workhouse buildings. Are the walls between our homes party walls?
Usually, yes. Where a wall or floor separates homes in different ownership it is a party wall or party structure, so cutting into it, fixing steels to it or removing part of it needs a notice to the owner on the other side.
How soon can work start after we serve a party wall notice in Billericay?
For work to a party wall the notice period is two months, and for excavation near a neighbour’s foundations it is one month. Work can start sooner if the neighbour gives written consent, or once an Award has been agreed.
Our neighbour in Great Burstead hasn't replied to our notice. What now?
If there is no answer within 14 days, the Act treats it as a dispute. A surveyor is then appointed for each owner, or one is agreed for both, and an Award is made setting out how and when the work will proceed.
Does the £899 + VAT package cover a party wall on each side of our terrace?
Yes. For domestic extensions and lofts it includes notices to all neighbours, one Schedule of Condition and one Award. Each additional Schedule of Condition is £399 + VAT, so a second neighbour adds that amount.
Do you cover Little Burstead, Ramsden Bellhouse and Noak Bridge?
Yes. We cover Billericay and the surrounding parts of the borough, including Great Burstead, Little Burstead, Ramsden Bellhouse and Noak Bridge, plus Basildon and Wickford.
How much does a Party Wall Agreement cost in Billericay?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Billericay owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Billericay?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.