Party Wall Agreement Brentwood
Brentwood has been a market town since it was granted a charter in 1227, a few years after a chapel was built near the crossroads. The modern borough took shape in 1934, when the urban district absorbed neighbouring parishes including Shenfield, Hutton, Ingrave, South Weald and Little Warley. Hutton is now split between modest housing estates and the largely affluent Hutton Mount, while the area west of the old village has been developed with housing estates and shopping parades along Rayleigh Road. Growth continues: Shenfield is set to take the borough’s second largest new development, Officers Meadow, with 825 homes.
Detached houses, estate semis and older town centre buildings all raise different party wall questions. Under the Party Wall etc. Act 1996, the notice depends on what you are building and how close it is. We serve the right notices on every adjoining owner, arrange Schedules of Condition and take the matter to an Award if a neighbour dissents. Our full package outside London is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Brentwood?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Brentwood's 13 conservation areas
Brentwood Borough Council has 13 conservation areas, which contain a significant proportion of the borough’s historic buildings. Most are village centres or historic parks, but two are residential: Station Lane in Ingatestone, designated in 1981, and Hutton Village, designated in 1986. The Brentwood Town Centre conservation area, designated in 2000, brought together three earlier areas: Wilson’s Corner, Chapel and Hart Street. Eight of the 13 have completed appraisals, prepared by Essex County Council’s historic buildings team.
The party wall picture across the borough:
Detached homes rarely share a wall, but basements, swimming pools and deep extension foundations within three or six metres of a neighbour can still need Section 6 notices.
Semi-detached and terraced houses on estates in Brentwood, Hutton and Shenfield are the classic loft and rear extension projects, with Section 3 notices for party wall work and Section 6 for foundations.
Older buildings in the town centre and Ingatestone may share walls that need repair or strengthening, which is Section 2 work and needs a two-month Section 3 notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Brentwood
Fixed fees, with the same prices across Essex.
From Brentwood we also cover nearby areas in Essex and east London:
Party Wall Agreement Essex · Party Wall Agreement Billericay · Party Wall Agreement Basildon · Party Wall Agreement Chelmsford · Party Wall Agreement Romford · Party Wall Agreement Havering · Party Wall Agreement Thurrock · Party Wall Agreement Epping & Loughton · Party wall agreement surveyor
Local party wall surveyors in Brentwood
- John GreenanAssocRICSMFPWSACABEParty Wall & Residential Property Surveyor, South East
- Kevin RedmanBSc(Hons)MFPWSParty Wall Surveyor, Essex & East London
Your enquiry is handled by a local qualified surveyor from our team. In Brentwood that includes the surveyors listed above, each with 25+ years' experience in surveying and construction.
Party wall questions from Brentwood homeowners
How do I get a party wall agreement in Brentwood?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Brentwood?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Brentwood?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our house at Hutton Mount is detached. Will a basement need a party wall notice?
Quite possibly. Section 6 applies whenever you excavate within three metres of a neighbour’s building to a depth below its foundations, or within six metres where the excavation would cut a 45-degree line down from them. Basements often meet one or both tests.
I live in the Station Lane conservation area in Ingatestone. What extra rules apply?
Conservation area status affects planning, including demolition and some alterations, so check with Brentwood Borough Council before you start. The party wall process is the same as anywhere else.
Can I build a garage wall right on the boundary in Shenfield?
Yes, but you must serve a Section 1 notice at least one month before work starts if the new wall will be on the line of junction. If your neighbour consents, the wall can be built astride the boundary as a party wall; if not, it must be built wholly on your land, with footings that may project under theirs.
What is the difference between a consent and an Award?
A consent is your neighbour’s written agreement to the work, which is quick and free of surveyors’ fees. An Award is made by surveyors when a neighbour dissents; it sets out how the work will be done and protects both owners.
Does the £899 + VAT package include the Schedule of Condition?
Yes. For domestic extensions and loft conversions outside London, it covers notices for all neighbours, one Schedule of Condition and one Party Wall Award. Each additional Schedule is charged separately.
Do you cover Shenfield, Hutton, Ingatestone and the villages?
Yes. We cover Brentwood and the surrounding borough, including Shenfield, Hutton, Warley, Ingrave, Ingatestone, Doddinghurst, Blackmore and Kelvedon Hatch.
How much does a Party Wall Agreement cost in Brentwood?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Brentwood?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.