Party Wall Agreement Romford
Romford is the main town of the London Borough of Havering, and its market place still sits at the old crossroads where North Street, South Street and the High Street meet. As former manors were sold off, houses spread out from the centre in every direction for about a mile. The Romford Garden Suburb followed in 1910–11, and in 1934 the urban district was enlarged to take in Havering-atte-Bower and Noak Hill. Collier Row, to the north, was largely built up between the wars, and the London County Council built the Harold Hill estate to the north east from 1948 to 1958.
So a Romford enquiry could be about a house in the garden suburb, an interwar home in Collier Row or a post-war house on the Harold Hill estate. The age of the house makes no difference: the Party Wall etc. Act 1996 decides whether notice is needed. We prepare and serve the notices, record the condition of the neighbouring property and, where a neighbour dissents, take the matter to a Party Wall Award. Our full package, with an Award, is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Romford?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Romford's market conservation area and the streets around it
Havering has 11 conservation areas, each with an appraisal and management proposals. The Romford conservation area, designated in 1968, protects the Market Place, the group of old buildings at its western end and the ancient crossroads where North Street, South Street, High Street and Market Place meet. The council’s 2025 appraisal extended the boundary for the first time, taking in whole building plots along all four streets and running south down the pedestrianised part of South Street to Eastern Road and the station.
Gidea Park, just to the north east, is a separate conservation area, designated in 1970 and extended in 1989 to take in the station.
How the Act applies around Romford:
Shops and flats in the town centre: altering a party wall, or a floor between flats in different ownership, is Section 2 work that needs a Section 3 notice two months ahead.
Interwar and post-war houses in Collier Row and Harold Hill: loft conversions with steels into the party wall, and rear extensions whose foundations come within three metres of next door.
Shared garden walls: raising or rebuilding a party fence wall is notifiable too.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Romford
Fixed fees, with the same prices across Essex.
Around Romford, on both sides of the London and Essex boundary, we also cover:
Party Wall Agreement Essex · Party Wall Agreement Havering · Party Wall Agreement Brentwood · Party Wall Agreement Redbridge · Party Wall Agreement Barking and Dagenham · Party Wall Agreement Thurrock · Party Wall Agreement Basildon · Party wall agreement surveyor
Local party wall surveyors in Romford
Your enquiry is handled by a local qualified surveyor from our team. In Romford that includes surveyors such as Kevin Redman BSc(Hons), MFPWS and John Greenan AssocRICS MFPWS ACABE, each with 25+ years’ experience in surveying and construction.
Party wall questions from Romford homeowners
How do I get a party wall agreement in Romford?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Romford?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Romford?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
I'm converting the loft of my house in Collier Row. Does the party wall need a notice?
If steels will bear on the party wall, or you are raising or cutting into it, yes. That is Section 2 work, so a Section 3 notice must be served at least two months before you start. From the day it is served, your neighbour has 14 days to reply.
Our shop on Market Place has a flat above it. Is the floor a party structure?
Yes, if the flat is owned separately. A floor separating parts of a building in different ownership is a party structure under the Act, so strengthening, cutting into or otherwise altering it needs a Section 3 notice to the other owner.
Is my building inside the Romford conservation area now that the boundary has changed?
Check Havering’s appraisal map for the latest boundary, which now runs south along South Street towards the station. Conservation area status affects planning; the party wall notices you need stay the same either way.
Our neighbour in Harold Hill hasn't replied to our notice. What happens next?
If there is no reply within 14 days, a dispute is treated as having arisen. Each owner then appoints a surveyor, or both agree on one, and the surveyors make an Award setting out how the work will proceed.
What does the £899 + VAT package cover in Romford?
For domestic extensions and loft conversions it covers notices to all neighbours, one Schedule of Condition and one Party Wall Award. Notices alone are £150 + VAT, and each additional Schedule of Condition is £399 + VAT.
Do you cover Gidea Park, Harold Wood and Hornchurch?
Yes. We cover Romford and the rest of Havering, including Gidea Park, Collier Row, Harold Hill, Harold Wood, Hornchurch and Upminster.
How much does a Party Wall Agreement cost in Romford?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Romford owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Romford?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.