What the Act says
s.10(13) provides that the reasonable costs incurred in (a) making or obtaining an Award, (b) reasonable inspections of work to which the Award relates, and (c) any other matter arising out of the dispute, “shall be paid by such of the parties as the surveyor or surveyors making the award determine”. So the decision is made by the surveyors, in the Award, not by either owner.
The government explanatory booklet sets out the usual position: the building owner will normally pay all costs associated with drawing up the Award, including the adjoining owner’s surveyor’s fees, where the works are solely for the building owner’s benefit. That is the position in the great majority of residential cases we deal with.
Why the building owner normally pays
The Act gives the building owner valuable rights over your property: to cut into the party wall, to excavate near your foundations, and in some cases to enter your land (s.2, s.6, s.8). In return, the procedure for resolving disputes is generally at their expense. You did not choose to have building work next door, so it is fair that you are not out of pocket for professional protection.
What “reasonable” means in practice
Your surveyor’s fees must be reasonable for the work involved. Surveyors usually charge either a fixed fee for the Award or an hourly rate, plus fees for any later inspections. The building owner, or their surveyor, can challenge fees that look excessive. If the surveyors cannot agree on fees, the matter can be referred to the third surveyor under s.10(11). Fees are normally invoiced on completion of the work, because only then is it known which quoted elements (notices, a Schedule of Condition, an Award) have been carried out; people do not normally pay upfront fees for party wall surveying. Fees are typically set out in the Award, with an instruction to the building owner to pay within a fixed period. Sums payable under the Act are recoverable summarily as a civil debt (s.17).
When you might have to pay
| Situation | Who pays | Where in the Act |
|---|---|---|
| Work solely for the building owner’s benefit | Building owner pays surveyors’ reasonable costs | s.10(13); booklet guidance |
| You serve a counter-notice asking for extra works for your benefit (for example deeper foundations or chimney flues) | You pay for the extra works you require, and surveyors may apportion related fees | s.4, s.11(9) |
| The party wall needs repair because of defect or want of repair | Shared, by reference to use and responsibility for the defect | s.11(4), s.11(5) |
| You later make use of work done at the building owner’s expense (for example you build on to a raised wall) | You pay a due proportion of the cost | s.11(11) |
| Costs are caused by unreasonable conduct, such as refusing access for an agreed inspection | Surveyors may award those costs against the party responsible | s.10(13)(c) |
| You ask your surveyor to do work outside the dispute (for example general advice on your own plans) | You pay your surveyor directly | Outside the Act |
Counter-notice works
If you serve a counter-notice under s.4, for example asking the building owner to build in chimney flues or to place special foundations deeper so they will suit your own future extension, the building owner must generally comply (s.4(3)) but you pay for the extra works (s.11(9)). The building owner can ask you to provide security for those expenses before they start (s.12(2)). See counter-notices.
Shared repairs
Where the building owner exercises their right to repair or rebuild a party wall because it is defective (s.2(2)(b)), the cost is shared in proportion to the use each owner makes of the wall and responsibility for the defect (s.11(5)). This is a common issue with old garden walls and party fence walls. Surveyors decide the split if you cannot agree. If the building owner is simply cutting into a sound wall for their own beams, none of this applies.
Mr D appoints his own surveyor in response to a s.3 notice for a loft conversion. The Award is agreed and the building owner’s surveyor objects to Mr D’s surveyor’s fee as too high for a routine loft. The two surveyors discuss it; Mr D’s surveyor explains that extra time was spent because revised drawings were issued twice. They agree a reduced figure, which the Award directs the building owner to pay within 14 days. Mr D pays nothing. Had the surveyors been unable to agree, either could have referred the fee to the third surveyor.
This is an illustrative scenario to show how the Act works in practice. It is not a real case, and the outcome on any real project depends on its own facts.
Practical steps before appointing a surveyor
- Ask the surveyor to confirm in writing that they will seek their fees from the building owner under s.10(13).
- Ask what happens if the building owner does not pay. Most surveyors will look to the Award and s.17 rather than to you.
- Ask whether any part of their work falls outside the dispute and could be charged to you.
- Check their qualifications and experience: membership of the Faculty of Party Wall Surveyors (FPWS) or RICS is a good sign.
- Keep copies of your appointment letter and the fee confirmation.
Our fees
When we act for an adjoining owner, our reasonable fees are, in the normal case, paid by the building owner. For reference, our published fixed fees for building owners are: notices £150 + VAT; notices plus a Schedule of Condition £499 + VAT (each extra Schedule £399 + VAT); a standalone Schedule of Condition £450 + VAT; an Award £400 + VAT; and a full package £899 + VAT (£999 + VAT in London). If both owners appoint us as Agreed Surveyor, the agreed surveyor add-on is normally £50 + VAT and is currently waived. See also who pays party wall surveyor fees from the building owner’s side.
Common misunderstandings
- “If I appoint my own surveyor I will be charged.” In the normal case, no. The building owner pays your surveyor’s reasonable fees.
- “The building owner can choose not to pay.” The decision is the surveyors’, set out in the Award under s.10(13). Unless the Award is successfully appealed within 14 days, it is conclusive (s.10(16)).
- “Fees are fixed by law.” They are not. The test is reasonableness for the work involved. A simple loft Award costs far less than a basement Award with monitoring.
- “I must pay and claim it back.” Normally your surveyor invoices the building owner directly under the Award.
Key points
| Question | Usual answer |
|---|---|
| Who pays my surveyor? | The building owner, if the work is solely for their benefit |
| Who decides? | The surveyors, in the Award (s.10(13)) |
| When might I pay? | Counter-notice works, shared repairs to a defective wall, later use of the building owner’s work, unreasonable conduct |
| How are unpaid fees recovered? | As a civil debt (s.17) |
Leaseholders and tenants
If you own a leasehold flat with more than a year left on the lease, you are an owner under s.20 and can appoint a surveyor in the same way, with the same normal fee position. Your freeholder may also have been served and may appoint separately. Tenants on shorter terms are adjoining occupiers rather than owners: they are entitled to compensation for loss or damage (s.7(2)) and to notice of entry (s.8), but the notice response is for the owners.
How we can help
We have handled party wall matters on more than 750 projects, acting for building owners and adjoining owners. If you have received a notice, we can prepare a Schedule of Condition of your property, act as Agreed Surveyor for both owners, or act as your own surveyor. In the normal case the building owner pays the reasonable surveyors’ fees, including ours when we act for you (s.10(13)). Call free on 08000 487897 or see your options as a neighbour.
- Party wall agreement questions answered
- Received a notice? Your options as an adjoining owner
- Party wall agreement surveyor
- Fixed fees: party wall agreement cost
- Do I need a party wall agreement? (1-minute check)
Areas we cover include Party Wall Agreement Kent · Party Wall Agreement Hertfordshire · Party Wall Agreement Surrey and more.
Sources: Party Wall etc. Act 1996 (legislation.gov.uk) · The Party Wall etc. Act 1996: explanatory booklet (GOV.UK) · Faculty of Party Wall Surveyors (FPWS). Last reviewed 27 October 2026. General guidance on the law in England and Wales, not legal advice.