Stevenage was designated in 1946 as the United Kingdom’s first new town under the New Towns Act, as post-war plans called for a ring of new towns around London. Before that it grew slowly around what is now the Old Town, with smaller settlements at Chells, Broadwater and Shephall; Shephall was a separate parish until the new town took it in. New neighbourhoods were built and occupied in turn: Bedwell in 1952, Broadwater and Shephall in 1953, Chells in the 1960s, and later Pin Green and Symonds Green. The planners set out to keep bicycles apart from cars as much as possible, and the town centre was the first fully pedestrian town centre in the country, opened by the Queen in 1959. Great Ashby, to the north, is one of the newest areas.

Neighbourhoods built over several decades mean a wide mix of homes. Where a house is attached, most lofts and extensions involve the Party Wall etc. Act 1996. We serve the notices, record each neighbour’s property and, if there’s a dispute, take the work through to an Award. Notices, Schedule and Award together cost £899 + VAT.

  • Notices for all your neighbours: £150 + VAT
  • Professionally qualified: RICS · FPWS · CABE
  • Free initial advice for building & adjoining owners

Request a fixed-fee quote

Tell us about your project in Stevenage. A local qualified surveyor from our team will reply, usually the same working day.

No payment online. Fixed fees, invoiced on completion.

RICSFaculty of Party Wall SurveyorsCABE
750+Projects
50,000+Photos for SOC reports
70%Projects where one surveyor acts for both
Party wall in Stevenage

Do I need a party wall agreement in Stevenage?

When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.

Typical projects that need notice include:

Rear and side-return extensionsLoft conversions with steel beams into the party wallChimney breast removalNew foundations within 3m of a neighbourGarden walls on the boundary
Planning permission isn’t the same thing. Approval from your local council (planning or building control) doesn’t replace your duties under the Party Wall Act. You still need to serve notice on your neighbours.
Illustration of a completed rear dormer loft conversion on a semi-detached house, cut away to show the finished loft room with stairs, bed and window, and the party wall shared with the neighbour
Local information

Stevenage's seven conservation areas and management plans

Stevenage Borough Council has seven conservation areas: Old Town High Street, Town Square, Orchard Road, Broadwater, Shephall Green, Symonds Green and St Nicholas/Rectory Lane. Each has a Conservation Area Management Plan adopted as a Supplementary Planning Document, and proposals in or affecting a conservation area are expected to have regard to it. The council has also published heritage impact assessments for Shephall Green, Marymead, the Town Centre and North Stevenage as evidence for its local plan.

Town Square, the post-war pedestrian centre, is itself a conservation area, so Stevenage protects its new town heritage as well as its older village cores.

Party wall work in Stevenage:

Old Town High Street: older buildings with shared walls, where repairs or alterations need two months’ notice under Section 3.

New town neighbourhoods such as Bedwell, Shephall and Broadwater: loft conversions and rear extensions next to an attached neighbour.

Later housing in Pin Green, Symonds Green and Great Ashby: side extensions and new foundations within three metres of the next house.

How it works

From notice to agreement in four steps

The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.

Talk to your neighbour

We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.

We serve the notices

We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.

Neighbour consents, or a Schedule

If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.

Award if there’s a dispute

If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.

Which notices do common projects need?

Rear extension: typical notices
Usually s6 for foundations; s1 if built on the boundary. Illustrative, not to scale.
Loft conversion: typical notices
Usually s2 works under a s3 notice (2 months). Illustrative, not to scale.
Basement: typical notices
Usually s6 plus s2 underpinning. Illustrative, not to scale.

Typical only. The 1-minute checker or a free call will confirm what applies.

The dates that matter

The party wall timeline

Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.

Day
0
Start here

Notices served

Served on every adjoining owner, at least 1 or 2 months before work depending on the section.

14
days
Neighbour responds

Consent or dissent

Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.

+10
days
If no reply

Request to appoint

A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.

SoC
Before work

Schedule of Condition

The neighbour’s property is inspected and photographed to record its condition.

Award
If in dispute

Party Wall Award

Surveyors serve the Award. Either owner may appeal to the county court within 14 days.

Go
Notice period ends

Work starts

Once the notice period has run and consent or an Award is in place.

⏳ Section 3 & 6 notices lapse if work hasn’t started within 12 months🤝 Your neighbour can agree to an earlier start in writing

Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.

Fixed fees in Stevenage

Everyone starts with notices

The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.

Step 1 · every party wall agreement starts here

Party Wall Notices: £150 + VAT (£180 inc VAT)

One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.

Get my party wall notices servedFixed fee, invoiced on completion

What happens next depends on your neighbour’s response

Outcome A

Neighbour consents

£150 + VAT
£180 inc VAT · fixed fee, invoiced on completion
  • Your neighbour signs the consent form
  • The consent is your Party Wall Agreement
  • You can proceed with the works
  • We still recommend a Schedule of Condition to protect you
Find out more
Most common outcomeOutcome B

Consents, subject to a Schedule of Condition

£499 + VAT
£598.80 inc VAT · fixed fee, invoiced on completion
55% of all our projects are notices with a Schedule of Condition
Illustration of a surveyor recording an existing crack on a neighbour's internal wall with a tablet and a crack gauge for a Schedule of Condition
  • Notices for all neighbours + Land Registry checks
  • Site inspection of your neighbour’s property
  • Detailed photographic Schedule of Condition
  • Protects you against claims for damage that was already there
  • Each additional Schedule: £399 + VAT (£478.80 inc)
Request a fixed-fee quote
Outcome C

Neighbour dissents: an Award is needed

£899 + VAT
£1,078.80 inc VAT · total including notices
  • Notices for all neighbours + Land Registry checks
  • 1 Schedule of Condition
  • 1 Party Wall Award
  • Sets working hours, access & damage provisions

Agreed Surveyor — we act for both owners

£50 + VAT Currently waived

Total with Agreed Surveyor+ VATinc VAT
Full package£899£1,078.80
London£999£1,198.80

No extra cost while the waiver runs.

70% of our projects use one surveyor acting for both.

Neighbour appoints their own surveyor: our fee stays as shown. Their surveyor’s reasonable fees are normally payable by you and are charged separately.
Domestic extensions & loft conversions only. Excludes basement and commercial projects. Basement or commercial? Request a quote →
Request a fixed-fee quote
Prefer to serve your own notices?

DIY notices at partywall-notices.co.uk

Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.

Visit partywall-notices.co.uk ↗
Already served your own notices?

Schedule of Condition only: £450 + VAT (£540 inc)

We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.

Request a Schedule of Condition

Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.

Local coverage

Party wall surveyors in and around Stevenage

Fixed fees, with the same prices across Hertfordshire.

Elsewhere in north and central Hertfordshire, we also cover:

Party Wall Agreement Hertfordshire · Party Wall Agreement Hitchin · Party Wall Agreement Hertford · Party Wall Agreement Welwyn Garden City · Party Wall Agreement Hatfield · Party Wall Agreement Harpenden · Party Wall Agreement Bishop’s Stortford · Party wall agreement surveyor

CB

Local party wall surveyors in Stevenage

MFPWSMPTS

Your enquiry is handled by a local qualified surveyor from our team. In Stevenage that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.

Stevenage FAQ

Party wall questions from Stevenage homeowners

How do I get a party wall agreement in Stevenage?

Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.

How long does a party wall agreement take in Stevenage?

Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.

Who pays for a party wall agreement in Stevenage?

Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.

Our end-of-terrace in Bedwell needs a side extension. Which neighbours get a notice?

The attached neighbour, if the work affects your party wall, and anyone whose building is within three or six metres of your new foundations under Section 6. A side extension often comes close to the house across the side path.

We live on Old Town High Street. Does the management plan affect our party wall notices?

No. The management plan guides planning and design in the conservation area. Party wall notices depend on the work itself, so you may need both planning advice and notices.

Our neighbour in Shephall wants to raise the party wall for their loft. Can I refuse?

You can dissent, but you can’t stop work the Act permits. Raising a party wall is a Section 2 right. If you dissent, surveyors make an Award setting out how it is done and how your property is protected.

Who pays if the party wall needed repairing anyway?

Where work is needed because of defects or lack of repair, Section 11 allows the cost to be shared in proportion to the use each owner makes of the wall. Surveyors settle the split if you can’t agree.

The house next door is rented from a housing association. Who do we serve?

The landlord, as owner, along with any tenant who holds a lease of more than a year. We identify the owners through Land Registry checks before serving.

Which parts of Stevenage do you cover?

All of it, including the Old Town, Bedwell, Broadwater, Chells, Pin Green, St Nicholas, Shephall, Symonds Green and Great Ashby.

How much does a Party Wall Agreement cost in Stevenage?

Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.

How far in advance do I need to serve notice?

At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.

Do I need party wall notice if I already have planning permission from the council?

Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.

Is there a party wall notice template I can use?

Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Stevenage owners prefer us to serve them for £150 + VAT.

Does the Party Wall Act apply to your project in Stevenage?

Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.

Free callGet a quote