Party Wall Agreement Stevenage
Stevenage was designated in 1946 as the United Kingdom’s first new town under the New Towns Act, as post-war plans called for a ring of new towns around London. Before that it grew slowly around what is now the Old Town, with smaller settlements at Chells, Broadwater and Shephall; Shephall was a separate parish until the new town took it in. New neighbourhoods were built and occupied in turn: Bedwell in 1952, Broadwater and Shephall in 1953, Chells in the 1960s, and later Pin Green and Symonds Green. The planners set out to keep bicycles apart from cars as much as possible, and the town centre was the first fully pedestrian town centre in the country, opened by the Queen in 1959. Great Ashby, to the north, is one of the newest areas.
Neighbourhoods built over several decades mean a wide mix of homes. Where a house is attached, most lofts and extensions involve the Party Wall etc. Act 1996. We serve the notices, record each neighbour’s property and, if there’s a dispute, take the work through to an Award. Notices, Schedule and Award together cost £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Stevenage?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Stevenage's seven conservation areas and management plans
Stevenage Borough Council has seven conservation areas: Old Town High Street, Town Square, Orchard Road, Broadwater, Shephall Green, Symonds Green and St Nicholas/Rectory Lane. Each has a Conservation Area Management Plan adopted as a Supplementary Planning Document, and proposals in or affecting a conservation area are expected to have regard to it. The council has also published heritage impact assessments for Shephall Green, Marymead, the Town Centre and North Stevenage as evidence for its local plan.
Town Square, the post-war pedestrian centre, is itself a conservation area, so Stevenage protects its new town heritage as well as its older village cores.
Party wall work in Stevenage:
Old Town High Street: older buildings with shared walls, where repairs or alterations need two months’ notice under Section 3.
New town neighbourhoods such as Bedwell, Shephall and Broadwater: loft conversions and rear extensions next to an attached neighbour.
Later housing in Pin Green, Symonds Green and Great Ashby: side extensions and new foundations within three metres of the next house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Stevenage
Fixed fees, with the same prices across Hertfordshire.
Elsewhere in north and central Hertfordshire, we also cover:
Party Wall Agreement Hertfordshire · Party Wall Agreement Hitchin · Party Wall Agreement Hertford · Party Wall Agreement Welwyn Garden City · Party Wall Agreement Hatfield · Party Wall Agreement Harpenden · Party Wall Agreement Bishop’s Stortford · Party wall agreement surveyor
Local party wall surveyors in Stevenage
Your enquiry is handled by a local qualified surveyor from our team. In Stevenage that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Stevenage homeowners
How do I get a party wall agreement in Stevenage?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Stevenage?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Stevenage?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our end-of-terrace in Bedwell needs a side extension. Which neighbours get a notice?
The attached neighbour, if the work affects your party wall, and anyone whose building is within three or six metres of your new foundations under Section 6. A side extension often comes close to the house across the side path.
We live on Old Town High Street. Does the management plan affect our party wall notices?
No. The management plan guides planning and design in the conservation area. Party wall notices depend on the work itself, so you may need both planning advice and notices.
Our neighbour in Shephall wants to raise the party wall for their loft. Can I refuse?
You can dissent, but you can’t stop work the Act permits. Raising a party wall is a Section 2 right. If you dissent, surveyors make an Award setting out how it is done and how your property is protected.
Who pays if the party wall needed repairing anyway?
Where work is needed because of defects or lack of repair, Section 11 allows the cost to be shared in proportion to the use each owner makes of the wall. Surveyors settle the split if you can’t agree.
The house next door is rented from a housing association. Who do we serve?
The landlord, as owner, along with any tenant who holds a lease of more than a year. We identify the owners through Land Registry checks before serving.
Which parts of Stevenage do you cover?
All of it, including the Old Town, Bedwell, Broadwater, Chells, Pin Green, St Nicholas, Shephall, Symonds Green and Great Ashby.
How much does a Party Wall Agreement cost in Stevenage?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Stevenage owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Stevenage?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.