Party Wall Agreement Hitchin
Hitchin takes its name from the Hicce people, recorded in a 7th-century document, and by 1086 it was a royal manor. The town flourished on the wool trade, and St Mary’s, much of it 15th century, is the largest parish church in Hertfordshire. Its open arable fields, divided into strips, survived into the early 19th century. By the 17th century Hitchin was a staging post for coaches from London, and by the middle of the 19th century the railway had arrived. After the Corn Exchange was built in the market place in 1853, the town became a major centre for grain trading, and lavender grown nearby supplied several distilleries. By the end of the 20th century Hitchin had become a commuter town, midway between London and Cambridge. Its districts include Bearton, Benslow, the Poets Estate, Purwell, Sunnyside, Walsworth, West Hitchin and Westmill.
Homes in Hitchin range from old buildings in the centre to 20th-century estates. Wherever they are attached, the Party Wall etc. Act 1996 is likely to apply to lofts and extensions. We serve the notices, record the neighbour’s property and, if there is a dispute, see it through to an Award. Including the Award, our fee is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Hitchin?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Hitchin's four conservation areas and their 2011 character statements
North Hertfordshire Council has four conservation areas in the town. Hitchin Conservation Area was designated on 14 March 1969, and the others are Butts Close, Hitchin Hill Path, and Hitchin Railway and Ransom’s Recreation Ground. Character statements for all four were adopted on 26 July 2011, and the main area’s statement is supported by eleven maps.
The council also keeps a Hitchin Register of Buildings of Local Interest, which identifies buildings that are not nationally listed but matter locally. Check both the statements and the register before planning changes to the outside of an older building.
Typical Hitchin party wall work:
Older buildings in the town centre: shared walls between shops, flats and houses, where repairs or alterations are Section 2 work under a two-month notice.
Houses near the railway and in Walsworth and Bearton: loft conversions and rear extensions affecting a party wall.
Houses in districts such as the Poets Estate and Westmill: side extensions and new foundations within three metres of the next house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Hitchin
Fixed fees, with the same prices across Hertfordshire.
From Hitchin across Hertfordshire, we also cover:
Party Wall Agreement Hertfordshire · Party Wall Agreement Stevenage · Party Wall Agreement Harpenden · Party Wall Agreement Welwyn Garden City · Party Wall Agreement St Albans · Party Wall Agreement Hertford · Party Wall Agreement Hemel Hempstead · Party wall agreement surveyor
Local party wall surveyors in Hitchin
Your enquiry is handled by a local qualified surveyor from our team. In Hitchin that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Hitchin homeowners
How do I get a party wall agreement in Hitchin?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Hitchin?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Hitchin?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our house near Hitchin station is in the Railway conservation area. Does that affect party wall notices?
No. The conservation area affects planning decisions about the outside of buildings. The Party Wall etc. Act 1996 works the same way inside and outside it, so serve your notices in the usual way.
Our building in the town centre is on the Register of Buildings of Local Interest. Does the Act treat it differently?
No. Local interest status is a planning matter. The Act gives the same protection to every adjoining owner, though a careful Schedule of Condition is especially useful for an older building.
We're extending our Walsworth semi. Do we need a Section 6 notice?
If you will dig within three metres of the neighbour’s house to a depth below their foundations, yes. Many extensions with standard trench foundations fall within this, so it is worth checking the drawings early.
Our neighbour in Hitchin served a notice and we did nothing. Has the dispute started?
Yes. If an adjoining owner does not respond within 14 days, the Act treats a dispute as having arisen. You can still appoint a surveyor, and if you do not, the building owner can appoint one on your behalf after a further 10-day notice.
Do you charge more for a project with two adjoining owners?
Notices to all neighbours are included in our fixed prices. A second Schedule of Condition, for the other neighbour, is £399 + VAT, and an Award add-on is £400 + VAT where needed.
Do you cover Letchworth, Baldock and Ickleford?
Yes. We cover Hitchin, Ickleford, Letchworth Garden City, Baldock and the villages of North Hertfordshire.
How much does a Party Wall Agreement cost in Hitchin?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Hitchin owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Hitchin?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.