Party Wall Agreement Lewes
Lewes is the county town of East Sussex and lies on the River Ouse where the river cuts through the South Downs. A traditional market town and centre of communications, it was the site of the Battle of Lewes in 1264. The town keeps a high proportion of its medieval building plots and oak-framed houses, though these are often masked by later facades, and its 18th-century frontages include several clad in mathematical tiles that imitate fine brickwork. The central network of narrow lanes, the twittens, is one of its most distinctive features, and many streets of 18th and 19th-century cottages have survived cycles of slum clearance. Lewes became a municipal borough in 1881, and its boundaries were enlarged in 1881 and 1934 to take in what are now the Wallands, South Malling, Nevill, Lansdown and Cranedown estates. The Pells Pool, built in 1860, is the oldest freshwater lido in England. In October 2000 the town suffered major flooding, and at the 2021 census the parish had 16,723 people.
With timber frames hidden behind brick and tile, older Lewes walls need care when they are altered. We serve the notices required by the Party Wall etc. Act 1996, record the neighbouring property and agree an Award if there is a dissent, for £899 + VAT all in.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Lewes?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Lewes conservation area and the national park
Lewes was first designated as a conservation area by East Sussex County Council in 1970, after a campaign led by the local amenity society, and it was extended in 2012. The South Downs National Park Authority is the local planning authority for the town, and its Conservation Area Appraisal and Management Plan divides the area into seven character areas: Cliffe; Lower High Street; Lewes Castle and Middle High Street; Upper High Street and Western Road; the Pells and West Street; the Wallands; and Southover.
The appraisal describes buildings that range from medieval flint churches and timber-framed houses to later houses in a picturesque Queen Anne style, with sham timberwork and a mix of tile hanging, roughcast, render and brickwork. Demolition of a building in the conservation area needs planning permission, and planned work to a tree must be notified to the authority.
Typical Lewes party wall work:
Timber-framed and refronted houses on the High Street and in the twittens: repairs and alterations to shared walls, which need Section 3 notice.
18th and 19th-century cottages: lofts and rear extensions where the party wall is old, thin or of mixed materials.
Later estates such as the Wallands, Nevill and South Malling: extensions and foundations close to a neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Lewes
Fixed fees, with the same prices across Sussex.
Across Sussex and along the Downs, we also cover:
Party Wall Agreement Sussex · Party Wall Agreement Brighton & Hove · Party Wall Agreement Eastbourne · Party Wall Agreement Haywards Heath · Party Wall Agreement Burgess Hill · Party Wall Agreement Hastings · Party Wall Agreement Crawley · Party wall agreement surveyor
Local party wall surveyors in Lewes
Your enquiry is handled by a local qualified surveyor from our team. In Lewes that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Lewes homeowners
How do I get a party wall agreement in Lewes?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Lewes?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Lewes?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our house in Lewes has a timber frame behind a brick front. How does that affect a party wall notice?
The notice requirements are the same, but the method needs to suit the frame. A surveyor will want to understand how the wall is built before agreeing where beams can bear or how openings are made.
We are in the national park and the conservation area. Who handles planning?
The South Downs National Park Authority. Planning and any listed building consent come from them. Party wall notices are separate and go to your neighbours, not the authority.
Next door is a listed building. Does that stop our extension?
Not by itself, but it can affect the design and planning. For the Act, you serve notice in the normal way. A detailed Schedule of Condition is especially useful where the neighbouring building is old or fragile.
We are lowering the floor of a cellar in Cliffe. Do we need a notice?
If you will excavate within three metres of next door’s building and below its foundations, yes, under Section 6. Ground near the Ouse can be wet, so ask an engineer about the method early.
What happens if our neighbour does not reply to the notice?
After 14 days without a response, a dispute is treated as having arisen. We then ask them to appoint a surveyor, and if they do not within 10 days, we can appoint one on their behalf under Section 10(4).
Do you cover Kingston, Ringmer and Newhaven?
Yes. We cover Lewes, Kingston near Lewes, Ringmer, Barcombe, Newhaven, Seaford and the rest of Lewes district.
How much does a Party Wall Agreement cost in Lewes?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Lewes owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Lewes?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.