Party Wall Agreement Eastbourne
By the mid-19th century most of Eastbourne was in the hands of two landowners. The railway arrived on 14 May 1849, and in 1859 one of them commissioned a plan for what was essentially an entire new town, a resort built “for gentlemen by gentlemen”. The population grew from fewer than 4,000 in 1851 to nearly 35,000 by 1891, Eastbourne became a municipal borough in 1883, and a purpose-built town hall opened in 1886. This period of growth and elegant building continued for several decades, and in 1926 the Eastbourne Corporation Act enabled the creation of the Eastbourne Downland Estate. Within the town’s limits today are the town centre, Meads, Old Town and Upperton, the inner areas of Ocklynge and Roselands, Hampden Park, Langney with Shinewater and Kingsmere, and Sovereign Harbour.
Victorian streets, seafront buildings and later suburbs sit side by side. The Party Wall etc. Act 1996 decides the notices for each project, and we serve them, record the condition of the neighbouring home and, where anyone dissents, take the work to an Award. The fixed package, including the Award, is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Eastbourne?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Eastbourne's conservation areas, from Meads to Warrior Square
Eastbourne Borough Council publishes maps for 12 conservation areas: College, Meads, Old Town, Park Close, Ratton, Saffrons, South Lynn Drive, Torfield, Town Centre and Seafront, Upperton, Warrior Square and Willingdon. Appraisals have been published for several, including College, Meads, Park Close, Torfield and Upperton, with a draft for Warrior Square.
The council advises that if your property is in a conservation area you should also check whether development is restricted by an Article 4 direction, and it runs conservation drop-ins for advice.
What that means for party wall work:
Older houses and terraces in the Town Centre and Seafront area and in Upperton: party walls on both sides, often with flats above and below.
Houses divided into flats: floors and walls between flats in different ownership are party structures under the Act.
Suburbs such as Hampden Park and Langney: rear extensions and lofts next to an attached neighbour.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Eastbourne
Fixed fees, with the same prices across Sussex.
Along the Sussex coast and inland, we also cover:
Party Wall Agreement Sussex · Party Wall Agreement Hastings · Party Wall Agreement Lewes · Party Wall Agreement Brighton & Hove · Party Wall Agreement Haywards Heath · Party Wall Agreement Burgess Hill · Party Wall Agreement East Grinstead · Party wall agreement surveyor
Local party wall surveyors in Eastbourne
Your enquiry is handled by a local qualified surveyor from our team. In Eastbourne that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Eastbourne homeowners
How do I get a party wall agreement in Eastbourne?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Eastbourne?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Eastbourne?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We own a flat in a converted house in Upperton. Who do we serve for work to the floor?
The owner of the flat below, and any other flat owner whose part of the building is affected. A long leaseholder of more than a year counts as an owner, and so does the freeholder.
Our house is in the Meads conservation area. Does the appraisal affect a party wall notice?
The appraisal guides planning decisions about the character of the area, and you should check for Article 4 restrictions too. The party wall notice is a separate legal step with its own time limits.
We're building a rear extension in Hampden Park. Do we need a Section 6 notice?
If your foundations will be deeper than the neighbour’s and within three metres of their house, yes, at least a month before digging. A Section 1 notice is also needed if the new wall goes on the boundary line.
Our neighbour in Langney hasn't responded to our notice. What is the next step?
After 14 days without a reply, a dispute is deemed to have arisen. The neighbour can still appoint a surveyor. If they will not, after a further 10-day request your surveyor can be appointed to act for them under Section 10(4).
Do your fixed prices apply to a terraced house with two neighbours?
Yes. Notices to all neighbours are included. The £899 + VAT package includes one Schedule of Condition and one Award, and each additional Schedule of Condition is £399 + VAT.
Do you cover Polegate, Willingdon and Pevensey Bay?
Yes. We cover all of Eastbourne and the surrounding area, including Polegate, Willingdon, Stone Cross, Westham and Pevensey Bay.
How much does a Party Wall Agreement cost in Eastbourne?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Eastbourne?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.