Havering is London’s most easterly borough and mostly suburban. The garden suburbs of Upminster, Emerson Park and Gidea Park followed the railway lines from Liverpool Street and Fenchurch Street in the late 19th century. Romford Garden Suburb, now Gidea Park, was built between July 1910 and June 1911 as an exhibition of town planning: 159 cottages and houses designed by more than 100 architects, with a further 35 houses, mostly flat-roofed, added for a Modern Homes Exhibition in 1934 to 1935. Further north, the London County Council’s Harold Hill, conceived in the Greater London Plan of 1944, was built mainly as brick terraces with some flats.
Each of these places brings its own party wall questions, from individually designed exhibition houses to estate terraces. Whatever the house, the Party Wall etc. Act 1996 decides which notices are needed before work starts. We serve them on every adjoining owner and handle the Schedule of Condition and any Award.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Havering?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Havering's 11 conservation areas and Article 4 directions
Havering Council has 11 designated conservation areas, all with appraisals and management proposals. Three have Article 4 directions. The Gidea Park direction, made on 31 December 2015 and confirmed on 24 June 2016, replaced five older overlapping directions and applies two levels of control to listed addresses. In Cranham, planning permission is needed for gates, walls, fences or other means of enclosure, and in Havering-atte-Bower for satellite dishes.
The council also notes that conservation area consent is needed to demolish a building of 115 cubic metres or more, or a boundary wall over one metre high next to a road and two metres elsewhere. Where that wall is shared with a neighbour, the Party Wall Act applies too.
Common Havering projects:
Loft conversions and rear extensions on Harold Hill’s brick terraces and other estate houses, needing Section 3 notices for the party walls and Section 6 for foundations near next door.
Alterations to Exhibition houses in Gidea Park, where Article 4 consent may come first and party wall notices follow.
Larger detached homes in Emerson Park, where there is no shared wall but deep foundations close to a neighbour still need a Section 6 notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Havering
Fixed fees, with the same prices across London.
Havering's neighbours are Bexley across the Thames, Barking and Dagenham and Redbridge, the Essex districts of Epping Forest and Brentwood, and Thurrock. We also cover:
Party Wall Agreement London · Party Wall Agreement Romford · Party Wall Agreement Barking and Dagenham · Party Wall Agreement Redbridge · Party Wall Agreement Bexley · Party Wall Agreement Brentwood · Party Wall Agreement Thurrock · Party Wall Agreement Epping & Loughton · Party wall agreement surveyor
Local party wall surveyors in Havering
Your enquiry is handled by a local qualified surveyor from our team. In Havering that is Kevin Redman BSc(Hons), MFPWS, with 25+ years’ experience in surveying and construction management.
Party wall questions from Havering homeowners
How do I get a party wall agreement in Havering?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Havering?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Havering?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £999 + VAT. Who pays, and the exceptions.
I own one of the Exhibition houses in Gidea Park. Which comes first, planning or party wall notices?
Usually planning, or at least a clear design, because the Article 4 direction may mean you need consent for changes that are normally permitted. Party wall notices should describe the final works, so serve them once you know what you are building and allow at least one or two months before the start date.
We want to replace a shared boundary wall in Cranham. What permissions are involved?
Possibly two. Cranham’s Article 4 direction means new gates, walls or fences may need planning permission. If the wall sits astride the boundary it is also a party fence wall, so rebuilding it needs a Section 3 notice to your neighbour.
Our Harold Hill terrace needs a new rear extension. How many neighbours get a notice?
Every adjoining owner whose property is affected. On a mid-terrace house that is usually both neighbours, for Section 6 foundations, and possibly Section 1 if you build a new wall on either boundary.
A neighbour in Emerson Park is excavating near our house. They say no notice is needed because the houses are detached. Is that right?
Not necessarily. Section 6 applies to detached houses too: if the excavation is within three metres of your building and deeper than its foundations, or within six metres and cuts a 45-degree line from them, notice is required.
Can my neighbour's surveyor charge me?
Normally no. The building owner usually pays the reasonable costs of both surveyors, including yours, for the Award. Costs can only be shifted in limited circumstances, for example where an adjoining owner asks for work done for their own benefit.
Do you cover Romford, Hornchurch, Upminster and Rainham?
Yes. We cover the whole London Borough of Havering, including Romford, Gidea Park, Hornchurch, Upminster, Emerson Park, Harold Wood, Harold Hill, Collier Row and Rainham, at our fixed London fees.
How much does a Party Wall Agreement cost in Havering?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £999 + VAT (London pricing) for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Havering owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Havering?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.