Party Wall Agreement Harlow
Harlow was a small town on the south bank of the River Stort until it was formally designated as a new town on 25 March 1947, the fourth after Stevenage, Crawley and Hemel Hempstead. The masterplan, drawn up that year, respected the existing landscape, with green wedges cutting through the town to separate its neighbourhoods, each planned with its own shops and community buildings. Mark Hall was the first neighbourhood, and The Lawn, finished in 1951, was the first modern-style residential tower block in Britain. The old town to the north east became known as Old Harlow. Expansion carried on beyond the original plan, with the Sumners and Katherines estates in the 1970s, Church Langley, completed in 2005, and Newhall in the early 2000s.
New town terraces, maisonettes and modern estates all have walls in common with the house next door. The Party Wall etc. Act 1996 decides what notice your project needs, and we prepare and serve it on each adjoining owner, photograph their property in a Schedule of Condition and, if there is a dispute, see it through to an Award. Notices start at £150 + VAT, and the complete service with an Award costs £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Essex office: Whitehall Works, Grays RM17 6SS


Do I need a party wall agreement in Harlow?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Harlow's ten conservation areas, from Churchgate Street to Mark Hall North
Harlow Council lists 10 conservation areas. The oldest, Churchgate Street and Old Harlow, date from 1969; Mark Hall North followed in 1987, Town Park Netteswell Cross in 1993, Tye Green in 1999 and Harlow Garden Village Estate in 2013. Mark Hall North takes in the first new town neighbourhood.
In Mark Hall North, where each estate was designed by different architects, the council confirmed an Article 4 direction in September 2023, so rear extensions, roof alterations, porches, chimneys, hardstandings, and gates, fences and walls visible from a road or footpath need the council’s permission. Churchgate Street has had its own Article 4 direction since 4 March 2026.
Party wall work we often see in Harlow:
New town terraces in Mark Hall, Netteswell and the other early neighbourhoods: loft conversions and rear extensions that cut into or rest on the party wall, under a Section 3 notice.
Maisonettes and flats: floors and walls shared by separately owned homes are party structures, so structural work to them needs notice.
Newer estates at Church Langley and Newhall: extensions whose foundations will be within three metres of an attached or neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly online.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Harlow
Fixed fees, with the same prices across Essex.
Around Harlow and over the county border into Hertfordshire, we also cover:
Party Wall Agreement Essex · Party Wall Agreement Bishop’s Stortford · Party Wall Agreement Epping & Loughton · Party Wall Agreement Hertford · Party Wall Agreement Cheshunt · Party Wall Agreement Chelmsford · Party Wall Agreement Hatfield · Party wall agreement surveyor
Local party wall surveyors in Harlow
- John GreenanAssocRICSMFPWSACABEParty Wall & Residential Property Surveyor, South East
- Kevin RedmanBSc(Hons)MFPWSParty Wall Surveyor, Essex & East London
Your enquiry is handled by a local qualified surveyor from our team. In Harlow that includes the surveyors listed above, each with 25+ years' experience in surveying and construction.
Party wall questions from Harlow homeowners
How do I get a party wall agreement in Harlow?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Harlow?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Harlow?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We live in Mark Hall North. Do we need the council's consent as well as party wall notices for a rear extension?
Very likely, yes. The Article 4 direction there means a rear extension needs planning permission, and the Party Wall etc. Act 1996 applies separately. One does not replace the other, so plan for both before you book the builder.
Our terraced house in Harlow shares walls on both sides. Do both neighbours need a notice for a loft conversion?
If the work affects both party walls, yes. Each adjoining owner gets their own notice, and each can consent or dissent. Many loft conversions cut into both walls to seat steel beams, so two notices are common on a terrace.
I own a maisonette in Harlow. Is the floor between me and the flat below covered by the Act?
Yes. A floor that divides parts of a building owned by different people is a party structure. Cutting into it, strengthening it or removing part of it is notifiable work, and your neighbour below has the same rights as one sharing a wall.
We are building a rear extension in Church Langley. When does Section 6 apply?
Section 6 applies if you will excavate within three metres of your neighbour’s building and go deeper than its foundations, or within six metres where a line drawn down at 45 degrees from your foundations would cut theirs. The notice must be served at least one month before you dig.
Our neighbour in Old Harlow wants to put up scaffolding in our garden. Do we have to allow it?
Under Section 8 an owner carrying out work under the Act has a right of access to adjoining land where it is needed, after giving 14 days’ notice. It must be reasonable, and damage caused has to be made good. An Award can set conditions for how the access is used.
Do you cover Potter Street, Tye Green and Gilston?
Yes. We cover all of Harlow, from Old Harlow, Mark Hall and Netteswell to Potter Street, Tye Green, Church Langley and Newhall, and over the Stort to Gilston.
How much does a Party Wall Agreement cost in Harlow?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Does the Party Wall Act apply to your project in Harlow?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.