Folkestone’s pier and harbour were built in 1809, but the coming of the railway had a greater effect on the town. The line reached Folkestone on 28 June 1843, and in its Edwardian heyday the town was considered the most fashionable resort of the time. The architecture of the West End shows this period, with many large buildings, townhouses, villas, private squares and hotels built to accommodate visitors. Its main landmark apart from the harbour is The Leas, a clifftop promenade laid out in the mid-1800s, with crescents, hotels and private parks, and since 1885 the Leas Lift, a Victorian water-powered lift, has linked it to the beach. The Old High Street, a narrow cobbled slope from the Bayle to the harbour, is now at the heart of the Creative Quarter.
Where a large house has been divided into flats, or a terrace shares walls on both sides, the Party Wall etc. Act 1996 can mean notices to more than one owner. We serve them all, record each neighbouring property and, where anyone dissents, settle matters by Award. With an Award, our fixed fee for a domestic project is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Folkestone?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Folkestone Leas and Bayle and the district's 21 conservation areas
Folkestone & Hythe District has 21 conservation areas, designated between 1969 and 1990. The district’s heritage strategy describes Folkestone as an important former channel port and fashionable seaside town, and it says the largest numbers of listed buildings in any of its conservation areas are in Hythe (101), Folkestone Leas and Bayle (96) and Sandgate High Street (72).
The council points out that in a conservation area you need planning permission to demolish a building of more than 115 cubic metres, or a gate, fence, wall or railing over one metre high next to a highway or public open space, or over two metres elsewhere. Works to trees must be notified at least six weeks ahead.
What that means for party wall work:
Villas and townhouses in the West End, including any divided into flats: work to party walls and to the floors between separately owned flats.
Terraced streets across the town: lofts, chimney breast removals and rear extensions affecting both neighbours.
Garden and boundary walls: rebuilding a shared wall is notifiable under the Act, and demolishing a high one in a conservation area may also need planning permission.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Folkestone
Fixed fees, with the same prices across Kent.
Along the Kent coast and inland, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Ashford · Party Wall Agreement Canterbury · Party Wall Agreement Ramsgate · Party Wall Agreement Whitstable · Party Wall Agreement Maidstone · Party Wall Agreement Hastings · Party wall agreement surveyor
Local party wall surveyors in Folkestone
Your enquiry is handled by a local qualified surveyor from our team. In Folkestone that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Folkestone homeowners
How do I get a party wall agreement in Folkestone?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Folkestone?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Folkestone?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We own a flat in a converted villa near The Leas. Do we need to serve notice on the flats above and below?
Yes, where the work affects a floor or wall shared with them. Each flat owner, and the freeholder, counts as an owner under the Act, so in a converted house one project can need several notices.
We want to rebuild a crumbling boundary wall in Folkestone. Is that party wall work?
If the wall straddles the boundary it is a party fence wall, and rebuilding it is Section 2 work, so a Section 3 notice is needed two months ahead. In a conservation area, check whether demolishing it also needs planning permission.
Does the Act apply to a loft conversion in our Cheriton terrace?
Usually, yes. Cutting pockets for steels into the party wall, or raising it, is Section 2 work, and with neighbours on both sides you would normally serve two notices.
Our neighbour in Sandgate is digging foundations for an extension. Should we have had a notice?
If the excavation is within three metres of your house and goes deeper than your foundations, or within six metres and crosses a 45-degree line from them, yes. You can ask them to stop and serve a Section 6 notice before going further.
Can I do my own Schedule of Condition with photos instead of paying for one?
You can take your own photos, but an independent Schedule of Condition, agreed before work starts, carries more weight if there is a dispute later. Ours costs £450 + VAT on its own, or £499 + VAT including notices.
Do you cover Hythe, Hawkinge and Sandgate?
Yes. We cover Folkestone, Cheriton, Sandgate, Hythe, Hawkinge and the rest of Folkestone & Hythe district.
How much does a Party Wall Agreement cost in Folkestone?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Folkestone owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Folkestone?