Party Wall Agreement Canterbury
Outside its medieval walls, Canterbury grew along routes such as Wincheap, St Dunstan’s, Whitstable Road and Old Dover Road, and much of that growth was Victorian and Edwardian terraced and semi-detached housing. In streets of narrow-fronted terraces, a rear extension, loft conversion or chimney breast removal almost always involves the wall you share with next door, so a party wall notice is usually needed before work starts.
We serve notices under the Party Wall etc. Act 1996 for homeowners and landlords across the Canterbury district, including Whitstable, Herne Bay and the surrounding villages. Where the neighbouring house is let, we serve the owner, not the tenant, after checking the title at the Land Registry. If your neighbour consents, that consent is your party wall agreement. If they dissent, our party wall surveyors prepare the Schedule of Condition and Party Wall Award. If you have received a notice, we can explain your options.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Canterbury?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Party wall matters in Canterbury
Canterbury City Council handles planning and building control for the city, Whitstable, Herne Bay and the villages. The district has 97 conservation areas. The Canterbury Conservation Area alone is made up of 13 separately designated areas around the walled city, and parts of the city, including the Cathedral, St Augustine’s Abbey and St Martin’s Church, form a World Heritage Site.
None of this changes the Party Wall etc. Act 1996, which applies here as everywhere in England and Wales. It does shape the projects we see:
Victorian and Edwardian terraces. Lofts, rear extensions and chimney breast removal usually mean work to the party wall. That needs a Section 3 notice at least two months before you start.
Extensions on tight plots. Where new foundations are within three metres of a neighbour’s building and deeper than theirs, a Section 6 notice is needed at least one month ahead.
Older and listed buildings. The city centre still has timber-framed houses from the 16th and 17th centuries. Listed building consent and party wall notices are separate, so you may need both.
Rented homes. The Local Plan notes that students compete for rented homes in Canterbury. If you are the landlord, you are the building owner and must serve the notices. If the house next door is let, the notice goes to its owner.
Written consent, or a Party Wall Award made by the surveyors, is your party wall agreement.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Canterbury
Fixed fees, with the same prices across Kent.
The Canterbury district includes Whitstable and borders Thanet, Dover, Folkestone and Hythe, Ashford and Swale. We also cover:
Party Wall Agreement Kent · Party Wall Agreement Whitstable · Party Wall Agreement Ashford · Party Wall Agreement Folkestone · Party Wall Agreement Margate · Party Wall Agreement Ramsgate · Party wall agreement surveyor
Local party wall surveyors in Canterbury
Your enquiry is handled by a local qualified surveyor from our team. In Canterbury that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Canterbury homeowners
How do I get a party wall agreement in Canterbury?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Canterbury?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Canterbury?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
The house next door is a student let. Who do I serve the party wall notice on?
The owner, and anyone else with a lease of more than a year. Tenants on shorter tenancies are not owners for notice purposes, although it is courteous to let them know. We check the Land Registry title so the notice goes to the right person.
I'm a landlord extending a rented house in Canterbury. Is the notice my responsibility?
Yes. As the owner carrying out the work, you are the building owner under the Act and must serve notice on the adjoining owners before work starts. Your tenants are not the people who serve or receive notices.
My house is in one of Canterbury's conservation areas. Does that change the party wall process?
No. Conservation area status affects planning, for example what you can do without permission, but party wall notices, notice periods and the route to an agreement or Award are the same everywhere.
My home is a listed timber-framed building. Do I still need party wall notices?
Yes, if the work falls under the Act. Listed building consent from the council and party wall notices to your neighbours are separate requirements, so you may need both.
Do you cover Whitstable, Herne Bay and the villages?
Yes. We cover the whole Canterbury district, including Whitstable, Herne Bay and the surrounding villages, on the same basis as the city.
How much does a Party Wall Agreement cost in Canterbury?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Canterbury owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Canterbury?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.