Party Wall Agreement Ramsgate
Ramsgate began as a fishing and farming hamlet and was one of the great English seaside towns of the 19th century. Its name, recorded as Remmesgate in 1274–5, refers to a gap in the cliffs, and the town was a limb of Sandwich in the Cinque Ports. Work on Ramsgate Harbour began in 1749 and was completed around 1850, and it is the only Royal Harbour in the United Kingdom. Close to mainland Europe, the town was a chief embarkation point during the Napoleonic Wars and for the Dunkirk evacuation in 1940. A railway guide of 1863 praised its sands, bathing, hotels and well-lit, well-paved streets. In 1901 an electric tramway linked Ramsgate, Margate and Broadstairs over 11 miles of track, and before the Second World War the borough council created a network of deep shelter tunnels for 60,000 people. There are many Regency and Victorian buildings in the town, about 900 listed buildings in all, with more than 200 around the harbour. In 2021 Ramsgate had 42,027 people.
Tall terraces, divided houses and narrow streets mean many Ramsgate homes share walls with neighbours on both sides. The Party Wall etc. Act 1996 decides which notices you need, and we serve them, record the neighbour’s property and, if they dissent, agree an Award. The full package is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Ramsgate?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Ramsgate conservation area and its Article 4 direction
Thanet District Council has 27 conservation areas. The Ramsgate conservation area was designated on 16 January 1970 and extended in 1980, 1988, 1990, 2000 and 2008, and Ramsgate Royal Esplanade and Ramsgate Montefiore are separate areas. The council adopted the Ramsgate Conservation Area Appraisal on 31 March 2022, funded by Historic England through the Ramsgate Heritage Action Zone, with survey work by community volunteers and a chapter on climate change.
The council has Article 4 directions in the Ramsgate, Ramsgate Marina extension and Pegwell conservation areas. These withdraw permitted development rights for minor changes such as porches, replacement windows and doors, and painting the outside of a building, on the properties listed in the direction.
Party wall work we see in Ramsgate:
Regency and Victorian terraces near the harbour and on the cliffs: lofts, chimney breast removals and rear extensions affecting both neighbours.
Houses split into flats: floors and walls between separately owned flats, which are party structures.
Later homes away from the centre: extensions and new foundations close to a neighbouring house.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Ramsgate
Fixed fees, with the same prices across Kent.
Across east Kent and the coast, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Canterbury · Party Wall Agreement Whitstable · Party Wall Agreement Folkestone · Party Wall Agreement Ashford · Party Wall Agreement Sittingbourne · Party Wall Agreement Medway · Party wall agreement surveyor
Local party wall surveyors in Ramsgate
Your enquiry is handled by a local qualified surveyor from our team. In Ramsgate that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Ramsgate homeowners
How do I get a party wall agreement in Ramsgate?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Ramsgate?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Ramsgate?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our Regency house in Ramsgate is listed and covered by the Article 4 direction. What comes first?
Listed building consent and any planning permission for the design, then party wall notices once the scheme is fixed. The notices still need to go out at least two months before work to the party wall.
We are converting a basement in a terrace near the harbour. Is that covered by your fixed price?
No. Basement projects involve deeper excavation and more complex Awards, so we quote them separately. We can still advise on which notices are likely to be needed.
The upper floors next door are flats with different owners. Do we serve all of them?
Serve every owner whose part of the building is affected, including the freeholder and any long leaseholder of more than a year. One notice per owner is normal.
Our neighbour wants to underpin the party wall between our Ramsgate houses. Can they?
Yes, underpinning a party wall is one of the rights in Section 2, but they must serve a Section 3 notice two months ahead. You can dissent and have a surveyor agree how the work will be done.
Who pays the surveyors' fees when we dissent?
Normally the building owner who wants the work, since it is for their benefit. The Award sets out the fees. Costs can be shared where, for example, work repairs a defect that benefits both sides.
Do you cover Broadstairs, Margate and Pegwell?
Yes. We cover Ramsgate, Pegwell, Broadstairs, Margate, Minster and the rest of Thanet.
How much does a Party Wall Agreement cost in Ramsgate?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Ramsgate owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Ramsgate?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.