Party Wall Agreement Staines-upon-Thames
Staines-upon-Thames stands where the River Colne meets the Thames, and much of the town is built on gravel ‘islands’ only slightly above the surrounding floodplain. The first bridge here is thought to have been Roman, and the first surviving record of a market dates from 1218. Historically part of Middlesex, the town was transferred to Surrey in 1965. The present Staines Bridge opened in 1832, the first railway arrived in 1848, and in 1856 the town became a junction when the line to Ascot opened. In 1864 linoleum manufacture began on the site of the 13th-century Hale Mill. From the mid-19th century, cottages for artisans and semi-skilled workers spread along the London and Kingston Roads; the residential roads south and south east of the centre followed in the early 1930s, and after the Second World War new housing on Commercial Road and between Kingston Road and Elizabeth Avenue served workers at the growing Heathrow Airport. The Elmsleigh Centre opened in 1980, and the Two Rivers centre was built on the old linoleum works site in 2002. Severe floods hit the town in 1894, 1947 and 2014.
Victorian cottages, 1930s semis and post-war homes mean plenty of shared walls. We take care of the Party Wall etc. Act 1996 notices, record your neighbour’s property and agree an Award if needed, for £899 + VAT with the Award included.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Staines-upon-Thames?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
The Staines conservation area and its three character areas
Spelthorne Borough Council designated the Staines conservation area in 1975. A new appraisal was adopted as Supplementary Planning Guidance on 19 April 2023. It divides the area into three character areas: St Mary’s, around the church; the Two Rivers; and the Market Square and Memorial Garden.
The appraisal contrasts the small-scale, village-like and quiet character around St Mary’s Church with the busier, grander and larger-scale buildings around the Market Square, High Street, Church Street and Clarence Road junctions. Church Street includes buildings of 17th and 18th-century origin.
Party wall situations in Staines:
Victorian cottages along the London and Kingston Roads: loft conversions and rear extensions affecting an attached neighbour.
1930s houses south and south east of the centre: side and rear extensions with new foundations close to next door.
Older buildings in the conservation area: shared walls between properties in different ownership, where Section 2 work needs two months’ notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Staines-upon-Thames
Fixed fees, with the same prices across Surrey.
Along the Thames and across Surrey, we also cover:
Party Wall Agreement Surrey · Party Wall Agreement Walton-on-Thames · Party Wall Agreement Weybridge · Party Wall Agreement Hounslow · Party Wall Agreement Woking · Party Wall Agreement Camberley · Party Wall Agreement Richmond upon Thames · Party wall agreement surveyor
Local party wall surveyors in Staines-upon-Thames
Your enquiry is handled by a local qualified surveyor from our team. In Staines-upon-Thames that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.
Party wall questions from Staines-upon-Thames homeowners
How do I get a party wall agreement in Staines-upon-Thames?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Staines-upon-Thames?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Staines-upon-Thames?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our house in Staines is close to the river. Does that affect a Section 6 notice?
The rule is the same: notice is needed if foundations within three metres of a neighbour’s building go deeper than theirs. Near the river, engineers often specify deeper foundations, so Section 6 is common.
We share a wall with a neighbour on Kingston Road and want to open up the back of the house. Which notice?
If you insert a steel beam into the party wall or cut into it, serve a Section 3 notice two months ahead. If the work only affects your side and not the party wall, a notice may not be needed.
Our 1930s semi has a shared chimney stack. Can we take down our half?
Not without notice. A shared stack is part of the party structure, so removing or altering it is Section 2 work. The design must keep the neighbour’s side stable.
Do we need to tell our neighbour in Laleham about a garden room on the boundary?
If you build a new wall on the line of junction, Section 1 applies and you must give one month’s notice. A free-standing structure set back from the boundary normally needs no notice.
What if we only want the neighbour's house recorded before work starts?
A Schedule of Condition on its own is £450 + VAT. With notices it is £499 + VAT. If the neighbour dissents, an Award can be added for £400 + VAT.
Do you cover Egham, Ashford and Shepperton?
Yes. We cover Staines-upon-Thames, Egham Hythe, Laleham, Ashford, Stanwell, Sunbury, Shepperton and the rest of Spelthorne.
How much does a Party Wall Agreement cost in Staines-upon-Thames?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Staines-upon-Thames owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Staines-upon-Thames?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.