Staines-upon-Thames Party Wall Surveyors · Fixed fees · Invoiced on completion

Party Wall Agreement Staines-upon-Thames

Staines-upon-Thames stands where the River Colne meets the Thames, and much of the town is built on gravel ‘islands’ only slightly above the surrounding floodplain. The first bridge here is thought to have been Roman, and the first surviving record of a market dates from 1218. Historically part of Middlesex, the town was transferred to Surrey in 1965. The present Staines Bridge opened in 1832, the first railway arrived in 1848, and in 1856 the town became a junction when the line to Ascot opened. In 1864 linoleum manufacture began on the site of the 13th-century Hale Mill. From the mid-19th century, cottages for artisans and semi-skilled workers spread along the London and Kingston Roads; the residential roads south and south east of the centre followed in the early 1930s, and after the Second World War new housing on Commercial Road and between Kingston Road and Elizabeth Avenue served workers at the growing Heathrow Airport. The Elmsleigh Centre opened in 1980, and the Two Rivers centre was built on the old linoleum works site in 2002. Severe floods hit the town in 1894, 1947 and 2014.

Victorian cottages, 1930s semis and post-war homes mean plenty of shared walls. We take care of the Party Wall etc. Act 1996 notices, record your neighbour’s property and agree an Award if needed, for £899 + VAT with the Award included.

  • Notices for all your neighbours: £150 + VAT
  • Professionally qualified: RICS · FPWS · CABE
  • Free initial advice for building & adjoining owners

Request a fixed-fee quote

Tell us about your project in Staines-upon-Thames. A local qualified surveyor from our team will reply, usually the same working day.

No payment online. Fixed fees, invoiced on completion.

RICSFaculty of Party Wall SurveyorsCABE
750+Projects
50,000+Photos for SOC reports
70%Projects where one surveyor acts for both
Party wall in Staines-upon-Thames

Do I need a party wall agreement in Staines-upon-Thames?

When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.

Typical projects that need notice include:

Rear and side-return extensionsLoft conversions with steel beams into the party wallChimney breast removalNew foundations within 3m of a neighbourGarden walls on the boundary
Planning permission isn’t the same thing. Approval from your local council (planning or building control) doesn’t replace your duties under the Party Wall Act. You still need to serve notice on your neighbours.
Illustration of a completed rear dormer loft conversion on a semi-detached house, cut away to show the finished loft room with stairs, bed and window, and the party wall shared with the neighbour
Local information

The Staines conservation area and its three character areas

Spelthorne Borough Council designated the Staines conservation area in 1975. A new appraisal was adopted as Supplementary Planning Guidance on 19 April 2023. It divides the area into three character areas: St Mary’s, around the church; the Two Rivers; and the Market Square and Memorial Garden.

The appraisal contrasts the small-scale, village-like and quiet character around St Mary’s Church with the busier, grander and larger-scale buildings around the Market Square, High Street, Church Street and Clarence Road junctions. Church Street includes buildings of 17th and 18th-century origin.

Party wall situations in Staines:

Victorian cottages along the London and Kingston Roads: loft conversions and rear extensions affecting an attached neighbour.

1930s houses south and south east of the centre: side and rear extensions with new foundations close to next door.

Older buildings in the conservation area: shared walls between properties in different ownership, where Section 2 work needs two months’ notice.

How it works

From notice to agreement in four steps

The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.

Talk to your neighbour

We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.

We serve the notices

We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.

Neighbour consents, or a Schedule

If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.

Award if there’s a dispute

If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.

Which notices do common projects need?

Rear extension: typical notices
Usually s6 for foundations; s1 if built on the boundary. Illustrative, not to scale.
Loft conversion: typical notices
Usually s2 works under a s3 notice (2 months). Illustrative, not to scale.
Basement: typical notices
Usually s6 plus s2 underpinning. Illustrative, not to scale.

Typical only. The 1-minute checker or a free call will confirm what applies.

The dates that matter

The party wall timeline

Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.

Day
0
Start here

Notices served

Served on every adjoining owner, at least 1 or 2 months before work depending on the section.

14
days
Neighbour responds

Consent or dissent

Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.

+10
days
If no reply

Request to appoint

A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.

SoC
Before work

Schedule of Condition

The neighbour’s property is inspected and photographed to record its condition.

Award
If in dispute

Party Wall Award

Surveyors serve the Award. Either owner may appeal to the county court within 14 days.

Go
Notice period ends

Work starts

Once the notice period has run and consent or an Award is in place.

⏳ Section 3 & 6 notices lapse if work hasn’t started within 12 months🤝 Your neighbour can agree to an earlier start in writing

Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.

Fixed fees in Staines-upon-Thames

Everyone starts with notices

The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.

Step 1 · every party wall agreement starts here

Party Wall Notices: £150 + VAT (£180 inc VAT)

One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.

Get my party wall notices servedFixed fee, invoiced on completion

What happens next depends on your neighbour’s response

Outcome A

Neighbour consents

£150 + VAT
£180 inc VAT · fixed fee, invoiced on completion
  • Your neighbour signs the consent form
  • The consent is your Party Wall Agreement
  • You can proceed with the works
  • We still recommend a Schedule of Condition to protect you
Find out more
Most common outcomeOutcome B

Consents, subject to a Schedule of Condition

£499 + VAT
£598.80 inc VAT · fixed fee, invoiced on completion
55% of all our projects are notices with a Schedule of Condition
Illustration of a surveyor recording an existing crack on a neighbour's internal wall with a tablet and a crack gauge for a Schedule of Condition
  • Notices for all neighbours + Land Registry checks
  • Site inspection of your neighbour’s property
  • Detailed photographic Schedule of Condition
  • Protects you against claims for damage that was already there
  • Each additional Schedule: £399 + VAT (£478.80 inc)
Request a fixed-fee quote
Outcome C

Neighbour dissents: an Award is needed

£899 + VAT
£1,078.80 inc VAT · total including notices
  • Notices for all neighbours + Land Registry checks
  • 1 Schedule of Condition
  • 1 Party Wall Award
  • Sets working hours, access & damage provisions

Agreed Surveyor — we act for both owners

£50 + VAT Currently waived

Total with Agreed Surveyor+ VATinc VAT
Full package£899£1,078.80
London£999£1,198.80

No extra cost while the waiver runs.

70% of our projects use one surveyor acting for both.

Neighbour appoints their own surveyor: our fee stays as shown. Their surveyor’s reasonable fees are normally payable by you and are charged separately.
Domestic extensions & loft conversions only. Excludes basement and commercial projects. Basement or commercial? Request a quote →
Request a fixed-fee quote
Prefer to serve your own notices?

DIY notices at partywall-notices.co.uk

Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.

Visit partywall-notices.co.uk ↗
Already served your own notices?

Schedule of Condition only: £450 + VAT (£540 inc)

We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.

Request a Schedule of Condition

Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.

Local coverage

Party wall surveyors in and around Staines-upon-Thames

Fixed fees, with the same prices across Surrey.

Along the Thames and across Surrey, we also cover:

Party Wall Agreement Surrey · Party Wall Agreement Walton-on-Thames · Party Wall Agreement Weybridge · Party Wall Agreement Hounslow · Party Wall Agreement Woking · Party Wall Agreement Camberley · Party Wall Agreement Richmond upon Thames · Party wall agreement surveyor

JG

Local party wall surveyors in Staines-upon-Thames

AssocRICSMFPWSACABE

Your enquiry is handled by a local qualified surveyor from our team. In Staines-upon-Thames that is John Greenan AssocRICS MFPWS ACABE, with 25+ years’ experience in surveying and construction.

Staines-upon-Thames FAQ

Party wall questions from Staines-upon-Thames homeowners

How do I get a party wall agreement in Staines-upon-Thames?

Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.

How long does a party wall agreement take in Staines-upon-Thames?

Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.

Who pays for a party wall agreement in Staines-upon-Thames?

Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.

Our house in Staines is close to the river. Does that affect a Section 6 notice?

The rule is the same: notice is needed if foundations within three metres of a neighbour’s building go deeper than theirs. Near the river, engineers often specify deeper foundations, so Section 6 is common.

We share a wall with a neighbour on Kingston Road and want to open up the back of the house. Which notice?

If you insert a steel beam into the party wall or cut into it, serve a Section 3 notice two months ahead. If the work only affects your side and not the party wall, a notice may not be needed.

Our 1930s semi has a shared chimney stack. Can we take down our half?

Not without notice. A shared stack is part of the party structure, so removing or altering it is Section 2 work. The design must keep the neighbour’s side stable.

Do we need to tell our neighbour in Laleham about a garden room on the boundary?

If you build a new wall on the line of junction, Section 1 applies and you must give one month’s notice. A free-standing structure set back from the boundary normally needs no notice.

What if we only want the neighbour's house recorded before work starts?

A Schedule of Condition on its own is £450 + VAT. With notices it is £499 + VAT. If the neighbour dissents, an Award can be added for £400 + VAT.

Do you cover Egham, Ashford and Shepperton?

Yes. We cover Staines-upon-Thames, Egham Hythe, Laleham, Ashford, Stanwell, Sunbury, Shepperton and the rest of Spelthorne.

How much does a Party Wall Agreement cost in Staines-upon-Thames?

Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.

How far in advance do I need to serve notice?

At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.

Do I need party wall notice if I already have planning permission from the council?

Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.

Is there a party wall notice template I can use?

Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Staines-upon-Thames owners prefer us to serve them for £150 + VAT.

Does the Party Wall Act apply to your project in Staines-upon-Thames?

Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.