Party Wall Agreement Borehamwood
Borehamwood takes its name from the ‘wood of Boreham’, recorded in 1188 when it was given to an abbey for feeding pigs, and in 1776 an Act of Parliament enclosed Boreham Wood Common in the parish of Elstree. The town was historically part of Elstree parish; a separate church parish was created in 1909 for the area east of the Midland Railway, and the civil parish was renamed Elstree and Borehamwood in 1982. From the 1920s onwards the town became one of the main centres of the British film, and later television, industries because of its production studios, now commonly known as Elstree Studios. After the Second World War its population grew greatly, with large areas of council housing for displaced Londoners, many of which are now privately owned, and fast trains to central London have made it a mainly residential town. Hundreds of new homes have been built in recent years, with more under way. The town has a population of 36,322.
With so many post-war semis and terraces, and a growing number of flats, Borehamwood owners often need to deal with the Party Wall etc. Act 1996. We serve the notices, record the neighbouring property and agree an Award if anyone dissents. The complete package is £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Borehamwood?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
Planning context in Borehamwood and Elstree
Hertsmere Borough Council has 15 conservation areas, and none of them is in Borehamwood itself. The nearest is Elstree Village, first designated in August 1976, when it was divided between Hertfordshire and two London boroughs, and wholly within Hertsmere since boundary changes in 1993. Its appraisal describes timber-framed buildings from the 15th to 17th centuries, Georgian town houses, inns and Arts and Crafts buildings along Watling Street, and an Article 4 direction applies there.
The Elstree and Borehamwood neighbourhood plan identifies four communities: Borehamwood, Elstree, Elstree Village and the hamlet of Well End. Hertsmere’s Article 4 list includes land at Theobald Street in Borehamwood.
Typical Borehamwood party wall work:
Post-war houses built for families from London: loft conversions and rear extensions next to an attached neighbour.
Flats and new apartments: floors and walls shared with other owners, which are party structures.
Older properties in Elstree Village: shared walls in historic buildings where repairs or alterations need two months’ notice.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Borehamwood
Fixed fees, with the same prices across Hertfordshire.
Around Borehamwood and the London border, we also cover:
Party Wall Agreement Hertfordshire · Party Wall Agreement Barnet · Party Wall Agreement St Albans · Party Wall Agreement Watford · Party Wall Agreement Harrow · Party Wall Agreement Hatfield · Party Wall Agreement Enfield · Party wall agreement surveyor
Local party wall surveyors in Borehamwood
Your enquiry is handled by a local qualified surveyor from our team. In Borehamwood that is Carl Brady MFPWS MPTS, with 25+ years’ experience in party wall matters.
Party wall questions from Borehamwood homeowners
How do I get a party wall agreement in Borehamwood?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Borehamwood?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Borehamwood?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
Our former council house in Borehamwood is now privately owned. Does the Act apply the same way?
Yes. It applies to all owners. If the house next door is still council-owned, the council or housing association is the adjoining owner and must receive the notice.
We want a rear extension on our semi in Borehamwood. Which notices could apply?
A Section 6 notice if your foundations are within three metres of next door and deeper than theirs, a Section 1 notice for a new wall on the line of junction, and a Section 3 notice if you cut into the party wall.
Do we need to notify the freeholder of our block before work in our flat?
If the work affects a wall or floor shared with another flat, notice goes to the owners of the adjoining parts, which can include the freeholder as well as any leaseholder with more than a year left. Check your lease too.
Our neighbour in Elstree hasn't replied after two weeks. What happens now?
Silence for 14 days counts as a dissent. They can still appoint a surveyor. If they do not, a written request gives them 10 days, after which a surveyor can be appointed for them under Section 10(4).
Is a party wall notice still required if we have planning permission?
Yes. Planning permission and the party wall process are separate. Planning deals with the design; the Act deals with your neighbour’s rights over the shared wall and nearby excavation.
Do you cover Elstree, Shenley and Radlett?
Yes. We cover Borehamwood, Elstree, Elstree Village, Shenley, Radlett and the rest of Hertsmere.
How much does a Party Wall Agreement cost in Borehamwood?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Borehamwood owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Borehamwood?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.