Party Wall Agreement Medway
Medway was formed in 1998 by merging the boroughs of Rochester-upon-Medway and Gillingham, and it takes in the five Medway Towns: Strood, Rochester, Chatham, Gillingham and Rainham. Much of the area grew around Chatham Dockyard. When the Chatham Lines were built to defend the yard and it expanded, more homes were needed for its workers, and because building could only happen beyond the Lines, New Brompton grew up there; Gillingham was then called New Brompton. In Chatham, the area between the High Street and Luton village shows the same growth in its many streets of Victorian terraces.
Terraced streets mean shared walls on both sides, so most lofts, kitchen extensions and chimney breast removals here need notices under the Party Wall etc. Act 1996, often to two neighbours at once. We serve them on everyone affected, record the condition of each neighbouring house and, where someone dissents, take the work through to an Award. For a domestic extension or loft, the full package costs £899 + VAT.
- Notices for all your neighbours: £150 + VAT
- Professionally qualified: RICS · FPWS · CABE
- Free initial advice for building & adjoining owners


Do I need a party wall agreement in Medway?
When you carry out works covered by the Party Wall etc. Act 1996, you as the Building Owner have to serve notices and get consent from the neighbouring Adjoining Owners. If consent isn’t given, the matter is deemed to be in dispute and surveyors must be appointed to resolve it with a Party Wall Award. In everyday use, either the consent or the award is your “party wall agreement”.
Typical projects that need notice include:
From Historic Rochester to Brompton Lines: Medway's 24 conservation areas
Medway Council has 24 conservation areas covering a wide range of heritage themes. They include Historic Rochester, Chatham Historic Dockyard, Brompton Lines, New Road Chatham, Maidstone Road Chatham, Gillingham Green, Gillingham Park, Railway Street Gillingham, Rainham High Street, Star Hill, Watts Avenue and Roebuck Road in Rochester, and villages such as Cliffe, Halling, Upnor and St Mary Hoo. The council publishes appraisals and management plans explaining what makes each one significant, along with design guides for historic houses and shopfronts.
Beyond the dockyard, on what was marshy land, St Mary’s Island now has several newer housing developments.
Common party wall work in the Medway Towns:
Victorian terraces in Chatham, Gillingham and Rochester: loft steels into the party wall, chimney breast removals and rear extensions, each needing notice to the neighbours on both sides.
Houses at different levels: where one house sits lower than its neighbour, new foundations can easily go deeper than next door’s and bring in Section 6.
Newer estates such as St Mary’s Island: extensions and garden walls close to the boundary.
From notice to agreement in four steps
The Building Owner (the person doing the works) has to serve notice and get consent from each Adjoining Owner before work starts.
Talk to your neighbour
We always advise speaking to the Adjoining Owner before notices are served, so they know what to expect.
We serve the notices
We prepare and serve the correct notices after Land Registry checks, with a consent form and a stamped envelope.
Neighbour consents, or a Schedule
If they consent, you can proceed. We always recommend a Schedule of Condition to record their property before work starts.
Award if there’s a dispute
If they don’t consent within 14 days, a dispute is deemed to have arisen and surveyors settle it with a Party Wall Award.
Which notices do common projects need?
Typical only. The 1-minute checker or a free call will confirm what applies.
The party wall timeline
Section 1 and 6 notices: at least 1 month before work. Section 3 notices: at least 2 months.
0
Notices served
Served on every adjoining owner, at least 1 or 2 months before work depending on the section.
days
Consent or dissent
Your neighbour has 14 days to consent. For Section 3 and 6 notices, no reply means a deemed dispute.
days
Request to appoint
A further notice under s10(4) gives them 10 days to appoint a surveyor, or one can be appointed on their behalf.
Schedule of Condition
The neighbour’s property is inspected and photographed to record its condition.
Party Wall Award
Surveyors serve the Award. Either owner may appeal to the county court within 14 days.
Work starts
Once the notice period has run and consent or an Award is in place.
Source: Party Wall etc. Act 1996, ss.1, 3, 5, 6 and 10 (legislation.gov.uk). General guidance only; we’ll confirm what applies to your project.
Everyone starts with notices
The rest of the process depends on how your neighbour responds, so you only pay for what’s actually needed. No hourly billing, no travel charges and nothing to pay up front: every fee is fixed and invoiced on completion.
Party Wall Notices: £150 + VAT (£180 inc VAT)
One fee covers ALL your neighbours, including Land Registry checks, bespoke notices, explanatory notes, a consent form, a stamped reply envelope and follow-up ‘Ten Day Notices’ if needed.
What happens next depends on your neighbour’s response
Neighbour consents
- Your neighbour signs the consent form
- The consent is your Party Wall Agreement
- You can proceed with the works
- We still recommend a Schedule of Condition to protect you
Consents, subject to a Schedule of Condition
- Notices for all neighbours + Land Registry checks
- Site inspection of your neighbour’s property
- Detailed photographic Schedule of Condition
- Protects you against claims for damage that was already there
- Each additional Schedule: £399 + VAT (£478.80 inc)
Neighbour dissents: an Award is needed
- Notices for all neighbours + Land Registry checks
- 1 Schedule of Condition
- 1 Party Wall Award
- Sets working hours, access & damage provisions
Agreed Surveyor — we act for both owners
£50 + VAT Currently waived
| Total with Agreed Surveyor | + VAT | inc VAT |
|---|---|---|
| Full package | £899 | £1,078.80 |
| London | £999 | £1,198.80 |
No extra cost while the waiver runs.
70% of our projects use one surveyor acting for both.
DIY notices at partywall-notices.co.uk
Our sister service, also run by Konstruction (UK) Ltd, helps you prepare and serve your own party wall notices correctly, with templates for Section 1, 3 and 6.
Schedule of Condition only: £450 + VAT (£540 inc)
We’ll record your neighbour’s property before work starts. If an Award is needed later, it can be added for £400 + VAT (£480 inc) per dissenting neighbour.
Not sure how the Act applies to your project? Call free on 08000 487897 for an initial chat of up to 30 minutes.
Party wall surveyors in and around Medway
Fixed fees, with the same prices across Kent.
Near the Medway Towns, we also cover:
Party Wall Agreement Kent · Party Wall Agreement Maidstone · Party Wall Agreement Sittingbourne · Party Wall Agreement Gravesend · Party Wall Agreement Dartford · Party Wall Agreement Tonbridge · Party Wall Agreement Sevenoaks · Party wall agreement surveyor
Local party wall surveyors in Medway
Your enquiry is handled by a local qualified surveyor from our team. In Medway that includes surveyors such as James Metcalf AssocRICS MFPWS (Party Wall & Residential Property Surveyor, Kent) and John Greenan AssocRICS MFPWS ACABE, each with 20 to 25+ years’ experience in surveying, property and construction.
Party wall questions from Medway homeowners
How do I get a party wall agreement in Medway?
Serve a valid party wall notice on every adjoining owner before work starts (one month for section 1 and 6 notices, two months for a section 3 party structure notice). If your neighbour consents in writing, that is your agreement; if they dissent or do not reply within 14 days, surveyors make a Party Wall Award. We serve notices for all your neighbours for £150 + VAT. Step-by-step guide.
How long does a party wall agreement take in Medway?
Notice periods are one month for section 1 and 6 notices and two months for section 3, and the neighbour has 14 days to respond. With consent, the agreement can be in place within that time. If there is a dispute, the time to make the Award varies with the works and the surveyors involved. Notice periods and timescales.
Who pays for a party wall agreement in Medway?
Normally the building owner, including the reasonable fees of the adjoining owner’s surveyor if the neighbour appoints their own (section 10(13)). Our fixed fees are notices £150, notices and a Schedule of Condition £499, and the full package £899 + VAT (£999 + VAT in London). Who pays, and the exceptions.
We have a mid-terrace in Gillingham. Do both neighbours need a notice for our loft conversion?
Usually, yes. If steels or other work affect both party walls, each adjoining owner must be served a Section 3 notice at least two months before work starts. Each can respond differently: one may consent while the other dissents.
Our house is in the Historic Rochester conservation area. Can we remove a chimney breast?
Cutting away a chimney breast that projects from a party wall is Section 2 work, so you need a Section 3 notice. Check with Medway Council too, as conservation area status can affect works such as taking down a chimney stack.
My neighbour in Chatham has served a Section 6 notice. What should I look for?
A Section 6 notice must come with plans and sections showing the excavation and the proposed foundations, so check them. You can consent, or dissent and appoint a surveyor, and you can ask for a Schedule of Condition of your house before work starts.
Can our builder go into our neighbour's garden in Rainham to build the extension?
Under Section 8, the building owner and their workers have a right of access to the neighbour’s land where it is needed to carry out work under the Act. Fourteen days’ notice of entry is normally required, except in an emergency.
What if cracks appear in next door's house in Strood after our work?
Under Section 7 you must make good any loss or damage caused by work under the Act, or pay compensation if the neighbour prefers. A Schedule of Condition taken beforehand shows what was already there.
Do you cover the Hoo Peninsula and Walderslade?
Yes. We cover all of Medway, including Strood, Rochester, Chatham, Gillingham, Rainham, Walderslade, Lordswood, Hempstead and the villages of the Hoo Peninsula.
How much does a Party Wall Agreement cost in Medway?
Notices for all your neighbours are £150 + VAT. If your neighbour consents subject to a Schedule of Condition, the total is £499 + VAT. If they dissent and an Award is needed, our full fee is £899 + VAT for domestic extensions and loft conversions (no extra cost if we act as Agreed Surveyor for both owners: the usual £50 + VAT supplement is currently waived). Every fee is fixed and invoiced on completion.
How far in advance do I need to serve notice?
At least 1 month before work for Section 1 (new boundary walls) and Section 6 (excavation) notices, and at least 2 months for Section 3 (work to the party wall itself). Your neighbour has 14 days to respond.
Do I need party wall notice if I already have planning permission from the council?
Yes. The Party Wall Act is separate from planning permission and building regulations, so you still need to serve notice where the Act applies.
Is there a party wall notice template I can use?
Yes. Our sister service partywall-notices.co.uk provides correctly worded templates if you’d like to serve notices yourself. Self-served notices are often invalid, though, so many Medway owners prefer us to serve them for £150 + VAT.
Does the Party Wall Act apply to your project in Medway?
Tell us about your project and a local qualified surveyor from our team will confirm which party wall notices you need and your fixed fee. Nothing to pay until the work is done.