Is the work actually notifiable?
Not all building work next door needs a party wall notice. Before taking action, check whether the work falls within the Act:
| Work | Notifiable? | Section |
|---|---|---|
| Cutting into a party wall to insert steel beams or padstones | Yes | s.2(2)(f), s.3 |
| Removing a chimney breast attached to the party wall | Yes | s.2, s.3 |
| Raising, thickening, underpinning or rebuilding a party wall | Yes | s.2(2)(a), s.3 |
| Building a new wall on or against the boundary | Yes | s.1 |
| Excavating within 3 m of your building to below your foundations, or within 6 m where a 45-degree line is crossed | Yes | s.6(1), s.6(2) |
| Drilling to fix shelves or kitchen units, replastering, rewiring, minor chases for sockets or wiring | No (minor work) | Booklet guidance |
| Rooflights or roof work that does not cut into the party wall | Usually not: only work to or into the party wall (or s.1/s.6 work) is relevant | s.2 |
| Internal work entirely away from the party wall | No |
If you are unsure, a surveyor can usually tell you from a short look at the works or the planning drawings.
Step-by-step: what to do
- Talk to your neighbour. Many building owners simply do not know about the Act, or their builder has told them it is unnecessary. A calm conversation, pointing them to the GOV.UK explanatory booklet, resolves a large proportion of cases.
- Record everything. Take dated photographs and video of your rooms, ceilings and external walls next to the work, and of any cracks. Note dates, times and what work you heard or saw.
- Write to the building owner. Ask them to stop notifiable work, serve the appropriate notice under s.1, s.3 or s.6, and confirm that they will compensate you for any damage. Keep it factual and polite.
- Appoint a surveyor if notice is then served. If they serve notice belatedly, you can respond in the usual way: consent with a Schedule of Condition, an Agreed Surveyor, or your own surveyor. Where work has already started, appointing your own surveyor is usually wise.
- Check building control. Structural work such as beams and chimney breast removal also needs building regulations approval. Building control is separate from the Act but can inspect unsafe work.
- Take legal advice if work continues. A solicitor experienced in property disputes can advise on an urgent injunction to stop work that threatens your property.
What the law says if the Act is ignored
The Act contains no criminal offence for failing to serve notice, and councils do not enforce it. But the rights the Act gives a building owner, such as cutting into a party wall or excavating near your foundations, are only available if they follow the procedure: s.3(1) requires a party structure notice before exercising s.2 rights, and s.6(5) requires notice at least one month before excavating. Working without notice is often described as “no notice, no Act”, but that leaves the building owner in a worse position, because they have not followed the due process set out in the Act of Parliament that specifically covers notifiable works. They lose the Act’s protections and dispute-resolution route, and risk an injunction to stop the work or a claim for damages.
Your right to compensation for loss or damage is not lost because notice was not served. Where the Act applies, s.7(2) requires the building owner to compensate any adjoining owner and occupier for loss or damage resulting from work executed under the Act, and ordinary civil law covers work done without lawful authority.
Can I serve notice myself?
No. Notices under the Act are served by the building owner. You can, however, ask them to serve one. Once notice is served, or once work has been done and a difference has arisen, surveyors can be appointed under s.10 to resolve it.
Common problems
- “My builder says it is not needed.” Builders are not always right about the Act. The test is the nature of the work, not the builder’s view.
- Work finishes before anyone acts. If the work is already complete, you can still claim for damage. A surveyor can inspect and help you document it.
- No record of the “before” condition. Without a Schedule of Condition, use any older photographs you have, estate agent particulars, or survey reports.
- Party wall issues mixed with boundary disputes. The Act does not decide where the boundary is. If ownership of the wall is disputed, you may need separate legal advice.
Mrs H hears drilling and hammering through her bedroom wall. Her neighbour’s builder is installing a steel beam for a kitchen knock-through, bearing into the party wall. No notice has been served. She takes photographs of her bedroom, which shows a fresh crack above the door, and speaks to her neighbour, who had not heard of the Act. The neighbour pauses the work and serves a party structure notice the next day. Mrs H appoints her own surveyor. The surveyors agree an Award that records the new crack as damage arising from the works, requires it to be made good, and sets terms for completing the remaining work. The building owner pays the surveyors’ reasonable fees.
This is an illustrative scenario to show how the Act works in practice. It is not a real case, and the outcome on any real project depends on its own facts.
Your checklist
- Confirm the work is likely to be notifiable.
- Photograph and video your property, with dates.
- Speak to your neighbour and the builder.
- Write asking for work to pause and notice to be served.
- Contact building control if the work looks structurally unsafe.
- Appoint a surveyor once notice is served, or to assess damage.
- Take prompt legal advice if notifiable work continues regardless.
Related reading: starting work without notice, from the building owner’s side, making a damage claim and Schedules of Condition.
Key points
- The Act is enforced through civil remedies, not by the council.
- Notice must be served before notifiable work starts (s.3(1), s.6(5), s.1(2)).
- Your right to compensation for damage survives a failure to serve notice.
- Calm, early, written communication resolves most cases.
- Injunctions are for genuine threats to your property and need prompt legal advice.
A short letter you could adapt: “We understand you are carrying out work to the party wall between our properties. This appears to be work covered by the Party Wall etc. Act 1996. Please pause any work to the wall and serve the appropriate notice so that we can respond in the usual way. We are happy for your project to proceed once this is done.”
Evidence that helps most
- Photographs and video showing the date, ideally from your phone with metadata intact.
- Notes of what you heard (drilling, hammering, breaking out) and when.
- Any older photographs, estate agent particulars or survey reports showing the earlier condition.
- Copies of all correspondence with your neighbour and their builder.
How we can help
We have handled party wall matters on more than 750 projects, acting for building owners and adjoining owners. If you have received a notice, we can prepare a Schedule of Condition of your property, act as Agreed Surveyor for both owners, or act as your own surveyor. In the normal case the building owner pays the reasonable surveyors’ fees, including ours when we act for you (s.10(13)). Call free on 08000 487897 or see your options as a neighbour.
- Party wall agreement questions answered
- Received a notice? Your options as an adjoining owner
- Party wall agreement surveyor
- Fixed fees: party wall agreement cost
- Do I need a party wall agreement? (1-minute check)
Areas we cover include Party Wall Agreement Sussex · Party Wall Agreement Birmingham · Party Wall Agreement West Midlands and more.
Sources: Party Wall etc. Act 1996 (legislation.gov.uk) · The Party Wall etc. Act 1996: explanatory booklet (GOV.UK). Last reviewed 27 October 2026. General guidance on the law in England and Wales, not legal advice.